全尾砂壓縮固結(jié)充填實驗研究
發(fā)布時間:2018-02-01 03:18
本文關(guān)鍵詞: 充填采礦法 壓縮固結(jié) 物理模擬實驗 數(shù)值模擬實驗 出處:《實驗技術(shù)與管理》2016年09期 論文類型:期刊論文
【摘要】:針對上向分層充填采礦法生產(chǎn)作業(yè)中存在的問題,將真實物理模擬實驗與虛擬數(shù)值模擬實驗相整合,設(shè)計了實驗工藝流程和裝置,對全尾砂壓縮固結(jié)充填技術(shù)進行實驗研究。采用固結(jié)強度測試、平面物理模擬、三維數(shù)值模擬等方法,對不同載荷條件下充填體的力學特性,以及上向分層充填采礦過程中充填體、礦體、圍巖的應力、應變的變化規(guī)律進行了實驗研究。
[Abstract]:Aiming at the problems existing in the production of upward stratification and filling mining, the real physical simulation experiment and the virtual numerical simulation experiment are integrated, and the experimental technological process and the device are designed. In this paper, the compression consolidation filling technology of full tailings is studied experimentally. The mechanical properties of the filling body under different loading conditions are studied by means of consolidation strength test, plane physical simulation, three-dimensional numerical simulation and so on. The variation of stress and strain of backfill, orebody and surrounding rock in the process of upward stratified filling mining is studied experimentally.
【作者單位】: 北京科技大學土木與資源工程學院;北京科技大學金屬礦山高效開采與安全教育部重點實驗室;
【基金】:國家“十二五”科技支撐計劃項目(2012BAB01B04) 中央高校基本科研業(yè)務費項目(FRF-TP-14-077A2)
【分類號】:TD853.34
【正文快照】: 2.北京科技大學金屬礦山高效開采與安全教育部重點實驗室,北京100083)充填采礦法是隨回采工作面的推進逐步用充填料填充采空區(qū)的采礦方法。充填采空區(qū)的目的是利用所形成的充填體進行地壓管理,以控制圍巖崩落和地表下沉,并為回采工作創(chuàng)造安全和方便條件[1]。依據(jù)礦塊結(jié)構(gòu)和回
【相似文獻】
相關(guān)期刊論文 前5條
1 田寶卿;劉盛東;;礦井工作面透射地震層析物理模擬實驗研究[J];中國科學院大學學報;2013年06期
2 王俊超;師學明;萬方方;徐子東;;探測孤石高阻體的跨孔電阻率CT水槽物理模擬實驗研究[J];CT理論與應用研究;2012年04期
3 蔣宗霖;于景惃;劉振慶;廖俊杰;胡兵;;方型回線輻射電磁場特征物理模擬實驗研究[J];工程地球物理學報;2011年02期
4 劉長武,余建;三維采礦物理模擬實驗裝置主要設(shè)計參數(shù)研究[J];巖土力學;2003年S2期
5 ;[J];;年期
相關(guān)碩士學位論文 前1條
1 張艷麗;大型地下工程三維可加載物理模擬實驗方法研究[D];西安科技大學;2009年
,本文編號:1480787
本文鏈接:http://sikaile.net/kejilunwen/kuangye/1480787.html
最近更新
教材專著