向家山大斷面淺埋偏壓隧道洞身段施工技術(shù)
[Abstract]:The excavation section area of Xiangjiashan tunnel in Changkun Hunan section of Shanghai-Kunming passenger dedicated line is more than 160m2, the buried depth is shallow (the local section of tunnel arch roof is exposed), and the geological conditions are complex. In order to avoid collapse caused by excavation, on the basis of investigating the actual situation of the site, the construction technical scheme of open excavation of arch, dark side wall and optimization of lining to type V b composite lining is put forward, and the important components such as surface concrete reverse compression cover plate and water prevention and drainage system are designed at the same time. The monitoring and measurement data show that the construction technical scheme is reasonable and the tunnel is in a safe and stable state. This scheme takes into account cost control and realizes good economic benefits, which can be used for reference for similar projects.
【作者單位】: 中國(guó)地質(zhì)大學(xué)巖土鉆掘與防護(hù)教育部工程研究中心;中國(guó)地質(zhì)大學(xué)(武漢)工程學(xué)院;
【基金】:武漢市科技局社會(huì)發(fā)展科技攻關(guān)計(jì)劃項(xiàng)目(201160823268)
【分類(lèi)號(hào)】:U455.4
【參考文獻(xiàn)】
相關(guān)期刊論文 前1條
1 高樹(shù)峰;;客運(yùn)專(zhuān)線大斷面黃土隧道淺埋偏壓施工技術(shù)[J];鐵道工程學(xué)報(bào);2008年10期
【共引文獻(xiàn)】
相關(guān)期刊論文 前5條
1 徐湖林;安永林;邵國(guó)良;;隧道過(guò)風(fēng)化槽段施工安全分析[J];地下空間與工程學(xué)報(bào);2010年S1期
2 祁帥;寇博;蔣光華;;黃土隧道施工風(fēng)險(xiǎn)分析及對(duì)策[J];華東公路;2013年04期
3 王緒興;;拉脊山隧道土模法處理連續(xù)塌方技術(shù)[J];鐵道工程學(xué)報(bào);2011年01期
4 黃戡;丁國(guó)華;彭立敏;彭建國(guó);安永林;馮德山;;瀏陽(yáng)河隧道過(guò)風(fēng)化槽段施工安全性評(píng)估[J];中南大學(xué)學(xué)報(bào)(自然科學(xué)版);2011年03期
5 黃彬;;大斷面黃土隧道土石分界段施工技術(shù)[J];現(xiàn)代隧道技術(shù);2013年01期
【二級(jí)參考文獻(xiàn)】
相關(guān)期刊論文 前1條
1 丁維利;王曉州;朱永全;王慶林;趙永明;;鄭西客運(yùn)專(zhuān)線黃土隧道施工地表裂縫調(diào)查分析[J];鐵道標(biāo)準(zhǔn)設(shè)計(jì);2007年S1期
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉光唯;丁志亮;;高速鐵路超大斷面隧道CRD施工技術(shù)[J];鐵道建筑;2010年05期
2 韋金嚴(yán);;大斷面隧道在淺埋軟巖條件下施工技術(shù)[J];山西建筑;2011年05期
3 王能剛;;客專(zhuān)線鐵路大斷面隧道開(kāi)挖施工技術(shù)[J];民營(yíng)科技;2009年05期
4 梁大鵬;;大斷面隧道下穿高速公路施工技術(shù)[J];科技信息;2010年12期
5 傅新軍;楊春;;大斷面隧道施工監(jiān)控量測(cè)[J];鐵道建筑技術(shù);2007年S1期
6 曲海鋒;劉豐軍;葉飛;;淺埋偏壓連拱隧道監(jiān)控量測(cè)特征分析[J];現(xiàn)代隧道技術(shù);2007年01期
7 蔡紅梅;;客運(yùn)專(zhuān)線隧道施工監(jiān)控量測(cè)控制[J];科技資訊;2009年08期
8 蔡紅梅;;客運(yùn)專(zhuān)線隧道施工監(jiān)控量測(cè)控制[J];長(zhǎng)沙鐵道學(xué)院學(xué)報(bào)(社會(huì)科學(xué)版);2008年01期
9 李恒杰;;軟弱圍巖隧道信息化施工[J];山西建筑;2011年01期
10 高樹(shù)峰;;客運(yùn)專(zhuān)線大斷面黃土隧道淺埋偏壓施工技術(shù)[J];鐵道工程學(xué)報(bào);2008年10期
相關(guān)會(huì)議論文 前10條
1 劉旭全;王永璽;雷向鋒;石新橋;竇忠孝;;監(jiān)控量測(cè)技術(shù)在客運(yùn)專(zhuān)線大斷面黃土隧道中的應(yīng)用[A];客運(yùn)專(zhuān)線工程技術(shù)學(xué)術(shù)研討會(huì)論文集(上)[C];2008年
2 孫兆遠(yuǎn);羅瓊;焦蒼;;客運(yùn)專(zhuān)線大斷面隧道TSP地質(zhì)超前預(yù)報(bào)原理及應(yīng)用[A];中鐵隧道集團(tuán)2006年客運(yùn)專(zhuān)線專(zhuān)題技術(shù)交流大會(huì)論文集[C];2006年
3 賈枝喜;秦德進(jìn);張東青;;石太鐵路客運(yùn)專(zhuān)線李虎坪隧道CRD法施工技術(shù)[A];客運(yùn)專(zhuān)線工程技術(shù)學(xué)術(shù)研討會(huì)論文集(上)[C];2008年
4 ;淺談客運(yùn)專(zhuān)線簡(jiǎn)支箱梁的施工技術(shù)[A];“粵京港滬”四鐵道學(xué)會(huì)第九屆學(xué)會(huì)年會(huì)論文集[C];2005年
5 常翔;張獻(xiàn)偉;;客運(yùn)專(zhuān)線隧道施工技術(shù)淺析[A];隧道、地下工程及巖石破碎理論與應(yīng)用——隧道、地下工程及巖石破碎學(xué)術(shù)研討會(huì)論文集[C];2007年
6 房會(huì)彬;黃敏;;客運(yùn)專(zhuān)線900t預(yù)制箱梁橫移技術(shù)[A];河南省鐵道學(xué)會(huì)2007年學(xué)術(shù)活動(dòng)月優(yōu)秀論文集[C];2007年
7 房會(huì)彬;黃敏;;客運(yùn)專(zhuān)線900t預(yù)制箱梁橫移技術(shù)[A];河南省鐵道學(xué)會(huì)2007年學(xué)術(shù)活動(dòng)月優(yōu)秀論文選集[C];2007年
8 房會(huì)彬;黃敏;;客運(yùn)專(zhuān)線900t預(yù)制箱梁橫移技術(shù)[A];第十屆中國(guó)科協(xié)年會(huì)中部地區(qū)物流產(chǎn)業(yè)體系建設(shè)論壇專(zhuān)輯[C];2008年
9 劉建學(xué);房會(huì)彬;;客運(yùn)專(zhuān)線鐵路雙線圓端形空心橋墩施工工藝[A];第十屆中國(guó)科協(xié)年會(huì)中部地區(qū)物流產(chǎn)業(yè)體系建設(shè)論壇專(zhuān)輯[C];2008年
10 杝智;;客專(zhuān)隧道塷砌耐久性混凝土配合比設(shè)計(jì)及施工控制措施概述[A];第八屆海峽兩岸隧道與地下工程學(xué)術(shù)與技術(shù)研討會(huì)論文集[C];2009年
相關(guān)重要報(bào)紙文章 前10條
1 楊廣臣 周廣寬 廖高山;打造優(yōu)勢(shì)品牌 走向行業(yè)高端[N];中國(guó)鐵道建筑報(bào);2008年
2 張勇浩 記者 王代林;成渝客專(zhuān)地質(zhì)勘測(cè)全線展開(kāi)[N];四川日?qǐng)?bào);2009年
3 記者 吳凡;福田至香港西九龍僅需14分鐘[N];深圳特區(qū)報(bào);2009年
4 宋勇 施潔;寧杭客運(yùn)專(zhuān)線第一片簡(jiǎn)支梁澆注成功[N];科技日?qǐng)?bào);2009年
5 通訊員 周亞全 本報(bào)記者 張哲浩;寶橋,讓石太客專(zhuān)“飛”起來(lái)[N];科技日?qǐng)?bào);2009年
6 通訊員 何德超;“中國(guó)建筑”成功架設(shè)石武客運(yùn)專(zhuān)線首片箱梁[N];人民鐵道;2009年
7 王立武;石武客專(zhuān)隧道工程全部貫通[N];中華建筑報(bào);2010年
8 寇軍龍 劉媛 記者 張春鴿;黃陵縣:開(kāi)通農(nóng)村客運(yùn)專(zhuān)線 方便廣大群眾出行[N];延安日?qǐng)?bào);2010年
9 陳丹玲;印江鄉(xiāng)村客運(yùn)專(zhuān)線領(lǐng)跑農(nóng)民“新生活”[N];銅仁日?qǐng)?bào);2010年
10 鄧捷 章峻 張榮文;高嶺險(xiǎn)阻任徜徉[N];中國(guó)鐵道建筑報(bào);2008年
相關(guān)博士學(xué)位論文 前10條
1 嚴(yán)宗雪;大斷面隧道施工的應(yīng)力路徑與空間效應(yīng)研究[D];華南理工大學(xué);2011年
2 龔建伍;扁平大斷面小凈距公路隧道施工力學(xué)研究[D];同濟(jì)大學(xué);2008年
3 張國(guó)華;基于圍巖累積損傷效應(yīng)的大斷面隧道施工參數(shù)優(yōu)化研究[D];中國(guó)科學(xué)院研究生院(武漢巖土力學(xué)研究所);2010年
4 李健;大斷面黃土隧道初支作用機(jī)理及變形控制技術(shù)研究[D];北京交通大學(xué);2012年
5 賈紅梅;客運(yùn)專(zhuān)線圓端形橋墩的抗震性能研究[D];北京交通大學(xué);2008年
6 申玉生;軟弱圍巖雙連拱隧道設(shè)計(jì)施工關(guān)鍵技術(shù)研究[D];西南交通大學(xué);2006年
7 姚海波;大斷面隧道淺埋暗挖法下穿既有地鐵構(gòu)筑物施工技術(shù)研究[D];北京交通大學(xué);2005年
8 張學(xué)民;巖石材料各向異性特征及其對(duì)隧道圍巖穩(wěn)定性影響研究[D];中南大學(xué);2007年
9 杜菊紅;小間距隧道動(dòng)態(tài)施工力學(xué)研究[D];同濟(jì)大學(xué);2008年
10 項(xiàng)志敏;淺埋隧道圍巖穩(wěn)定性分析與施工關(guān)鍵技術(shù)研究[D];中南大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 杜連濤;客運(yùn)專(zhuān)線引入樞紐方案可拓評(píng)價(jià)研究[D];西南交通大學(xué);2010年
2 王健;鐵路客運(yùn)專(zhuān)線橋梁施工質(zhì)量控制研究[D];中南大學(xué);2010年
3 張松巖;秦沈客運(yùn)專(zhuān)線橋梁樁基工后沉降計(jì)算方法探討[D];西南交通大學(xué);2005年
4 徐世康;淺埋偏壓破碎圍巖隧道施工技術(shù)研究[D];長(zhǎng)安大學(xué);2012年
5 符賓賓;軟弱圍巖雙連拱隧道施工過(guò)程的數(shù)值模擬研究[D];西南交通大學(xué);2005年
6 韓秀峰;沈—長(zhǎng)(白)公路老嶺隧道施工監(jiān)控技術(shù)研究[D];吉林大學(xué);2005年
7 劉福華;鄭武客運(yùn)專(zhuān)線運(yùn)輸相關(guān)問(wèn)題研究[D];西南交通大學(xué);2005年
8 楊崢;偏壓雙連拱隧道施工力學(xué)行為研究[D];西南交通大學(xué);2005年
9 周超;三車(chē)道公路隧道信息化施工技術(shù)研究[D];西南交通大學(xué);2010年
10 盧歡;淺埋偏壓小凈距隧道洞口邊仰坡穩(wěn)定性研究[D];重慶大學(xué);2011年
,本文編號(hào):2507160
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2507160.html