天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 科技論文 > 交通工程論文 >

東青路大青段改建項(xiàng)目成本控制研究

發(fā)布時(shí)間:2019-06-05 08:00
【摘要】:近年來,隨著黃河三角洲開發(fā)建設(shè),東營市及附屬區(qū)縣經(jīng)濟(jì)迅速發(fā)展,山東省東青路東營市沿線路段交通量增長迅速,重載車輛、超載車輛急劇增加,經(jīng)過多年運(yùn)營后,廣饒縣大王鎮(zhèn)至青州界段路面裂縫、坑槽、沉陷等病害較為嚴(yán)重,路面問題越來越突出,導(dǎo)致公路行車速度、通行能力、行車安全性大大降低,成為區(qū)域路網(wǎng)的瓶頸路段。為此,東營市公路管理局決定對該路段進(jìn)行改建升級,以提高本路段的通行服務(wù)能力、行車安全,適應(yīng)城市規(guī)劃及未來交通量發(fā)展的需要。論文從東青路大王鎮(zhèn)到青州界段改建項(xiàng)目的實(shí)際情況出發(fā),分析了項(xiàng)目建設(shè)實(shí)施的必要性,簡要的介紹了東青路改建項(xiàng)目建設(shè)的規(guī)模和具體的技術(shù)標(biāo)準(zhǔn)。同時(shí),研究了項(xiàng)目成本的主要構(gòu)成,項(xiàng)目成本控制的特點(diǎn)及參與單位,提出了項(xiàng)目成本控制面臨的主要問題。作為東營市政府建設(shè)的重點(diǎn)工程,項(xiàng)目部對項(xiàng)目成本的控制提出了較高的要求。為保障東青路改建項(xiàng)目成本控制工作的順利實(shí)施,論文制定了項(xiàng)目成本控制的總體思路和關(guān)鍵點(diǎn),同時(shí)對成本控制的主要責(zé)任體系進(jìn)行了完善。并對項(xiàng)目成本控制的主要方法和措施以及考核進(jìn)行了具體的研究。制定了項(xiàng)目建設(shè)實(shí)施的各個(gè)階段成本控制的具體措施,針對項(xiàng)目成本控制面臨的主要問題和成本控制工作的主要問題,提出了具體的保障措施,從而促進(jìn)項(xiàng)目成本控制的順利實(shí)施,保障管理目標(biāo)的有效完成。
[Abstract]:In recent years, with the development and construction of the Yellow River Delta and the rapid economic development of Dongying City and its affiliated districts and counties, the traffic volume along Dongying City, Dongqing Road, Shandong Province has increased rapidly, heavy vehicles and overloaded vehicles have increased sharply. After many years of operation, Pavement cracks, potholes, subsidence and other diseases are more serious in the boundary section between Dawang Town and Qingzhou in Guangrao County, and the pavement problems are becoming more and more prominent, which leads to the great reduction of highway speed, traffic capacity and driving safety, which has become the bottleneck section of the regional road network. Therefore, Dongying Highway Administration Bureau has decided to reconstruct and upgrade the section in order to improve the traffic service capacity, traffic safety and meet the needs of urban planning and future traffic development. Based on the actual situation of the reconstruction project from Dawang Town to Qingzhou Section of Dongqing Road, this paper analyzes the necessity of the construction and implementation of the project, and briefly introduces the scale and specific technical standards of the reconstruction project of Dongqing Road. At the same time, the main composition of project cost, the characteristics of project cost control and the participating units are studied, and the main problems faced by project cost control are put forward. As the key project of Dongying municipal government construction, the project department has put forward higher requirements for the control of project cost. In order to ensure the smooth implementation of cost control of Dongqing Road reconstruction project, this paper formulates the overall idea and key points of project cost control, and perfects the main responsibility system of cost control. The main methods and measures of project cost control and assessment are studied concretely. This paper formulates the concrete measures of cost control in each stage of the implementation of the project construction, and puts forward some concrete safeguard measures in view of the main problems faced by the project cost control and the main problems in the cost control work. So as to promote the smooth implementation of project cost control and ensure the effective completion of management objectives.
【學(xué)位授予單位】:哈爾濱工程大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:U418.8

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 劉瀲;;論工程項(xiàng)目的成本控制[J];水利水電技術(shù);2011年05期

2 朱曉飛;;公路工程施工項(xiàng)目成本管理存在的問題與對策研究[J];中國經(jīng)貿(mào)導(dǎo)刊;2010年20期

3 張威利;;完成成本法與制造成本法比較分析[J];現(xiàn)代會(huì)計(jì);2010年05期

4 葉勇;;業(yè)務(wù)流程再造理論的全景式展示[J];西安電子科技大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2010年04期

5 ;中央治理工程建設(shè)領(lǐng)域突出問題工作領(lǐng)導(dǎo)小組《關(guān)于規(guī)范工程建設(shè)項(xiàng)目決策行為和招標(biāo)投標(biāo)活動(dòng)的指導(dǎo)意見》[J];建筑市場與招標(biāo)投標(biāo);2010年01期

6 黃毅;吉德廣;;淺談建筑業(yè)項(xiàng)目管理[J];建設(shè)科技;2009年07期

7 孔令濤;;現(xiàn)代企業(yè)成本管理創(chuàng)新探討[J];現(xiàn)代商業(yè);2008年27期

8 馬開華;;如何抓好工程項(xiàng)目成本管理[J];科技創(chuàng)新導(dǎo)報(bào);2007年32期

9 朱立人;;淺談勘察設(shè)計(jì)企業(yè)的項(xiàng)目成本核算工作[J];地下工程與隧道;2007年03期

10 楊洋;;BPM存在的理由[J];軟件世界;2006年19期

相關(guān)碩士學(xué)位論文 前6條

1 潘金濤;國道309線昌樂至青州段改建工程可行性研究分析[D];西安建筑科技大學(xué);2009年

2 劉新平;高速公路路基工程施工項(xiàng)目成本管理研究[D];華北電力大學(xué)(北京);2008年

3 遲春波;公路工程施工項(xiàng)目成本管理研究[D];哈爾濱工程大學(xué);2008年

4 任昭文;建筑工程項(xiàng)目成本管理及其支持系統(tǒng)的研究[D];華中科技大學(xué);2006年

5 王長川;工程項(xiàng)目成本控制的分析與研究[D];大連理工大學(xué);2002年

6 尹紹斌;戰(zhàn)略成本動(dòng)因分析、控制與應(yīng)用研究[D];湖南大學(xué);2002年

,

本文編號:2493370

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2493370.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶27dc1***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請E-mail郵箱bigeng88@qq.com