山區(qū)國(guó)省干線公路瀝青路面就地?zé)嵩偕G色評(píng)價(jià)研究
發(fā)布時(shí)間:2018-10-30 08:32
【摘要】:隨著我國(guó)國(guó)省干線公路建設(shè)的發(fā)展,公路網(wǎng)規(guī)模不斷擴(kuò)大,山區(qū)交通日益便利,,但是隨著大量山區(qū)干線公路使用年限的增長(zhǎng),其路用使用性能卻日漸下降,公路瀝青路面養(yǎng)護(hù)問(wèn)題越來(lái)越受到普遍關(guān)注。為保持路面良好的使用狀態(tài),減少早期病害的發(fā)生,延緩病害的發(fā)展,延長(zhǎng)路面使用壽命,降低養(yǎng)護(hù)成本,選擇合適的預(yù)養(yǎng)護(hù)技術(shù)對(duì)山區(qū)干線瀝青路面進(jìn)行預(yù)防性養(yǎng)護(hù),對(duì)于公路自身和山區(qū)社會(huì)經(jīng)濟(jì)的發(fā)展均具有重要意義。 山區(qū)干線公路養(yǎng)護(hù)在帶來(lái)諸多正面效應(yīng)的同時(shí),也給生態(tài)環(huán)境帶來(lái)了不同程度的負(fù)面效應(yīng),因此選擇一種可以弱化負(fù)面效應(yīng),與生態(tài)環(huán)境相協(xié)調(diào),具有可持續(xù)發(fā)展前景,綠色效應(yīng)客觀的預(yù)養(yǎng)護(hù)技術(shù)已成為必然趨勢(shì)。 基于此,本文在瀝青路面就地?zé)嵩偕夹g(shù)已有研究成果的基礎(chǔ)上,對(duì)山區(qū)干線公路就地?zé)嵩偕夹g(shù)綠色效應(yīng)進(jìn)行研究,為我國(guó)山區(qū)干線公路預(yù)養(yǎng)護(hù)技術(shù)的選擇提供一些理論研究依據(jù)。 本文在綠色施工評(píng)價(jià)體系的基礎(chǔ)上探討綠色預(yù)養(yǎng)護(hù)評(píng)價(jià)體系,借鑒可持續(xù)發(fā)展指標(biāo)體系的壓力-狀態(tài)-響應(yīng)模型,建立了山區(qū)干線公路就地?zé)嵩偕G色評(píng)價(jià)研究的PSR框架模型,明確指標(biāo)體系的各個(gè)指標(biāo),并用層次分析法計(jì)算各指標(biāo)權(quán)重,運(yùn)用灰色系統(tǒng)綜合評(píng)價(jià)方法建立山區(qū)干線公路就地?zé)嵩偕G色評(píng)價(jià)模型,最后運(yùn)用該評(píng)價(jià)模型對(duì)貴州省省道S201(K135+000~K163+000)玉銅線瀝青路面就地?zé)嵩偕?xiàng)目進(jìn)行綜合評(píng)價(jià),證明其實(shí)用性。 研究結(jié)果表明,瀝青路面就地?zé)嵩偕夹g(shù)具有較好的綠色效應(yīng),施工中廢氣排放量少、噪聲小,對(duì)環(huán)境污染;可充分利用舊瀝青路面混合料,節(jié)約原材料,降低施工成本,實(shí)現(xiàn)資源的再生循環(huán)利用;施工過(guò)程中占用工作面小,不中斷交通,施工作業(yè)時(shí)間短,對(duì)公共交通的影響小。
[Abstract]:With the development of national and provincial trunk road construction, the scale of highway network is expanding and the traffic in mountainous area is more convenient. However, with the increase of service life of a large number of mountain trunk roads, the performance of road use is declining day by day. More and more attention has been paid to the maintenance of highway asphalt pavement. In order to maintain the good condition of pavement use, reduce the occurrence of early diseases, delay the development of diseases, prolong the service life of pavement, reduce the maintenance cost, and select appropriate pre-maintenance technology to carry out preventive maintenance of asphalt pavement in mountain trunk line. For the highway itself and the development of social and economic mountain areas are of great significance. The mountain trunk highway maintenance brings many positive effects, but also brings different negative effects to the ecological environment. Therefore, choosing one that can weaken the negative effect, coordinate with the ecological environment, has the prospect of sustainable development. Green effect objective pre-curing technology has become an inevitable trend. Based on this, the green effect of geothermal regeneration technology on mountain trunk highway is studied in this paper, based on the existing research results on geothermal regeneration technology of asphalt pavement. It provides some theoretical basis for the selection of pre-maintenance technology of mountain trunk highway in our country. Based on the evaluation system of green construction, this paper probes into the evaluation system of green pre-maintenance. Using the pressure-state-response model of the index system of sustainable development, the PSR framework model for the green evaluation of geothermal regeneration of mountain trunk roads is established. Every index of the index system is defined, the weight of each index is calculated by AHP, and the green evaluation model for geothermal regeneration of mountain trunk highway is established by using the comprehensive evaluation method of grey system. Finally, the evaluation model is used to evaluate the geothermal regeneration project on the asphalt pavement of Jade Copper Line of Guizhou Provincial Highway S201 (K135 000~K163 000), which proves its practicability. The results show that bituminous pavement has good green effect, less exhaust gas emission, less noise and less pollution to the environment. It can make full use of the old asphalt pavement mixture, save the raw materials, reduce the construction cost, realize the recycling utilization of the resources, occupy the working face small in the construction process, do not interrupt the traffic, the construction operation time is short, the influence to the public transportation is small.
【學(xué)位授予單位】:重慶交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U416.217;U416.26
本文編號(hào):2299490
[Abstract]:With the development of national and provincial trunk road construction, the scale of highway network is expanding and the traffic in mountainous area is more convenient. However, with the increase of service life of a large number of mountain trunk roads, the performance of road use is declining day by day. More and more attention has been paid to the maintenance of highway asphalt pavement. In order to maintain the good condition of pavement use, reduce the occurrence of early diseases, delay the development of diseases, prolong the service life of pavement, reduce the maintenance cost, and select appropriate pre-maintenance technology to carry out preventive maintenance of asphalt pavement in mountain trunk line. For the highway itself and the development of social and economic mountain areas are of great significance. The mountain trunk highway maintenance brings many positive effects, but also brings different negative effects to the ecological environment. Therefore, choosing one that can weaken the negative effect, coordinate with the ecological environment, has the prospect of sustainable development. Green effect objective pre-curing technology has become an inevitable trend. Based on this, the green effect of geothermal regeneration technology on mountain trunk highway is studied in this paper, based on the existing research results on geothermal regeneration technology of asphalt pavement. It provides some theoretical basis for the selection of pre-maintenance technology of mountain trunk highway in our country. Based on the evaluation system of green construction, this paper probes into the evaluation system of green pre-maintenance. Using the pressure-state-response model of the index system of sustainable development, the PSR framework model for the green evaluation of geothermal regeneration of mountain trunk roads is established. Every index of the index system is defined, the weight of each index is calculated by AHP, and the green evaluation model for geothermal regeneration of mountain trunk highway is established by using the comprehensive evaluation method of grey system. Finally, the evaluation model is used to evaluate the geothermal regeneration project on the asphalt pavement of Jade Copper Line of Guizhou Provincial Highway S201 (K135 000~K163 000), which proves its practicability. The results show that bituminous pavement has good green effect, less exhaust gas emission, less noise and less pollution to the environment. It can make full use of the old asphalt pavement mixture, save the raw materials, reduce the construction cost, realize the recycling utilization of the resources, occupy the working face small in the construction process, do not interrupt the traffic, the construction operation time is short, the influence to the public transportation is small.
【學(xué)位授予單位】:重慶交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U416.217;U416.26
【參考文獻(xiàn)】
相關(guān)期刊論文 前9條
1 邱微;趙慶良;李崧;張建祺;;基于“壓力-狀態(tài)-響應(yīng)”模型的黑龍江省生態(tài)安全評(píng)價(jià)研究[J];環(huán)境科學(xué);2008年04期
2 姜濤;;罩面類預(yù)防性養(yǎng)護(hù)方法[J];交通世界(建養(yǎng).機(jī)械);2008年01期
3 于春普;關(guān)于推動(dòng)綠色建筑設(shè)計(jì)的思考[J];建筑學(xué)報(bào);2003年10期
4 莫麗威;張淑林;;瀝青路面再生工藝技術(shù)綜述[J];北方交通;2011年02期
5 劉婧;;普通高等級(jí)公路養(yǎng)護(hù)管理與創(chuàng)新發(fā)展[J];交通世界(運(yùn)輸.車輛);2013年06期
6 張曉博;;干線路面常見病害及處治技術(shù)[J];交通世界(運(yùn)輸.車輛);2012年09期
7 肖耀連;;水對(duì)瀝青混凝土路面損害和防治[J];青海交通科技;2006年02期
8 劉思峰;灰色系統(tǒng)理論的產(chǎn)生、發(fā)展及前沿動(dòng)態(tài)[J];浙江萬(wàn)里學(xué)院學(xué)報(bào);2003年04期
9 郭小宏;楊健民;李朋偉;;就地?zé)嵩偕夹g(shù)加熱等級(jí)和作業(yè)速度研究[J];公路工程;2013年03期
本文編號(hào):2299490
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2299490.html
最近更新
教材專著