重載鐵路隧道內(nèi)無砟軌道結(jié)構(gòu)選型設(shè)計與施工關(guān)鍵技術(shù)
發(fā)布時間:2018-10-10 19:23
【摘要】:新建山西中南部鐵路通道為國內(nèi)第一條設(shè)計軸重30 t的重載鐵路。通過對我國客貨混運線路雙塊式、長枕埋入式、彈性支承塊式無砟軌道結(jié)構(gòu)的組成及技術(shù)特點的對比分析,選用彈性支承塊式無砟軌道作為該重載鐵路隧道內(nèi)無砟軌道結(jié)構(gòu)形式。闡述了彈性支承塊無砟軌道結(jié)構(gòu)設(shè)計要點;給出了無砟軌道與隧底銜接的設(shè)計方案;分析了彈性支承塊預(yù)制質(zhì)量及軌道施工關(guān)鍵工序質(zhì)量控制關(guān)鍵技術(shù);提出了隧道排水系統(tǒng)設(shè)計優(yōu)化建議。本文可為重載隧道內(nèi)無砟軌道結(jié)構(gòu)設(shè)計與施工提供借鑒。
[Abstract]:The new railway passage in central and southern Shanxi is the first heavy-haul railway with a designed axle load of 30 tons in China. The composition and technical characteristics of ballastless track structure of double block type, long pillow embedded type and elastic support block type on mixed passenger and cargo transportation lines in China are analyzed. The ballastless track with elastic support block is selected as the structure of ballastless track in the heavy haul railway tunnel. The main points of structure design of elastic bearing block ballastless track are expounded, the design scheme of the connection between ballastless track and tunnel bottom is given, the precast quality of elastic support block and the key technology of quality control in key working procedure of track construction are analyzed. The optimization suggestion of tunnel drainage system design is put forward. This paper can provide reference for the design and construction of ballastless track structure in heavy haul tunnel.
【作者單位】: 晉豫魯鐵路通道股份有限公司;
【基金】:鐵道部科技研究開發(fā)計劃項目(2011G028-C)
【分類號】:U459.1;U213.244
[Abstract]:The new railway passage in central and southern Shanxi is the first heavy-haul railway with a designed axle load of 30 tons in China. The composition and technical characteristics of ballastless track structure of double block type, long pillow embedded type and elastic support block type on mixed passenger and cargo transportation lines in China are analyzed. The ballastless track with elastic support block is selected as the structure of ballastless track in the heavy haul railway tunnel. The main points of structure design of elastic bearing block ballastless track are expounded, the design scheme of the connection between ballastless track and tunnel bottom is given, the precast quality of elastic support block and the key technology of quality control in key working procedure of track construction are analyzed. The optimization suggestion of tunnel drainage system design is put forward. This paper can provide reference for the design and construction of ballastless track structure in heavy haul tunnel.
【作者單位】: 晉豫魯鐵路通道股份有限公司;
【基金】:鐵道部科技研究開發(fā)計劃項目(2011G028-C)
【分類號】:U459.1;U213.244
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 禹志陽;楊奎芳;申鳳鳴;;軌道電路在無砟軌道條件下傳輸特性的研究[J];鐵道學(xué)報;2007年05期
2 朱江;梁愛珍;;雙塊式無砟軌道簡易工裝法施工技術(shù)[J];鐵道標(biāo)準(zhǔn)設(shè)計;2009年S1期
3 靳忠;;淺談無砟軌道鐵路路基沉降控制[J];鐵道標(biāo)準(zhǔn)設(shè)計;2009年09期
4 周全能;潘正風(fēng);;武廣鐵路客運專線無砟軌道平順性評估[J];鐵道標(biāo)準(zhǔn)設(shè)計;2010年01期
5 汪西應(yīng);韓彥軍;級爭建;劉軍;;JZJ-2000型雙塊式無砟軌道混凝土澆筑機的研究與設(shè)計[J];工程機械;2010年04期
6 王振巖;李琳;;CRTSⅡ型板式無砟軌道一般地段簡支梁上底座板施工工藝[J];科技傳播;2010年12期
7 付仁俊;曹伶俐;張齊勇;;無砟軌道鋪軌控制測量PCP控制點坐標(biāo)解算方法的研究[J];測繪與空間地理信息;2010年03期
8 董春鳳;;無砟軌道基樁控制網(wǎng)的精度測量模型研究[J];科技風(fēng);2010年03期
9 周立明;;CRTSⅡ型板式無砟軌道充填層(水泥乳化瀝青砂漿)施工技術(shù)[J];科技創(chuàng)新導(dǎo)報;2010年21期
10 賈恒瓊;李海燕;吳韶亮;魏f,
本文編號:2262957