基于RFID的盾構(gòu)隧道施工運(yùn)輸車實(shí)時(shí)安全監(jiān)控
[Abstract]:At present, subway construction in China is in a period of rapid development, subway construction will effectively alleviate the urban traffic pressure. With the scale of subway construction expanding year by year, engineering accidents also occur frequently. The research and construction of the real-time safety management system in shield tunnel construction of subway will help to improve the information level of safety management, enhance the ability of safety control in the construction process, effectively prevent and stop the occurrence of safety accidents. Therefore, it is necessary to adopt information technology to manage the safety of metro shield tunnel construction. This paper analyzes the shortage of real time safety monitoring system and method of transport vehicle in the construction of shield tunneling in China and abroad, and summarizes and analyzes the safety monitoring problems that need to be solved urgently in the construction of shield tunnel in our country. By using information technology and sensing technology, the system frame, technology and system method of real-time security monitoring of metro shield tunnel construction transport vehicle are designed, as well as the real-time monitoring and warning model, and the database and software platform are used. The construction and design of the real-time monitoring platform for metro shield tunnel transport vehicle are studied emphatically, and at the same time, the multi-level early warning rules are formulated, the sound / light alarm function is added, and the real-time monitoring and early warning of the transport vehicle is carried out. Finally, taking Wuhan Metro Line 2 as the background, the real-time security monitoring system proposed in this paper is applied on the spot, and the summary and prospect are made. This paper provides an effective management method for the managers of subway tunnel construction site, promotes the informatization development of urban rail transit in China, and plays a certain role in promoting the promotion of digital construction site. It has important engineering significance.
【學(xué)位授予單位】:華中科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U455.43
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 黃祖冠;李德智;張星;;大直徑盾構(gòu)隧道施工工作結(jié)構(gòu)分解實(shí)證研究[J];無(wú)線互聯(lián)科技;2013年02期
2 顧修竹;;地鐵重疊盾構(gòu)隧道施工過(guò)程的變形研究[J];科技致富向?qū)?2014年03期
3 孫鈞,胡向東;盾構(gòu)隧道施工監(jiān)控系統(tǒng)數(shù)據(jù)庫(kù)的研究[J];地下工程與隧道;2002年01期
4 王殿春,可洪有;大—瀝區(qū)間盾構(gòu)隧道施工中地面沉陷原因分析[J];西部探礦工程;2004年04期
5 曾東洋;胡蔓寧;史彥文;;盾構(gòu)隧道施工地表沉隆變位影響因素研究[J];鐵道工程學(xué)報(bào);2006年04期
6 湯漩;吳惠明;胡珉;;盾構(gòu)隧道施工風(fēng)險(xiǎn)知識(shí)管理系統(tǒng)的設(shè)計(jì)開(kāi)發(fā)[J];地下工程與隧道;2006年04期
7 魏鑫;;盾構(gòu)隧道施工防止管片上浮施工技術(shù)[J];隧道建設(shè);2006年S2期
8 劉恕全;;盾構(gòu)隧道施工質(zhì)量缺陷淺談[J];隧道建設(shè);2006年S2期
9 劉恕全;;盾構(gòu)隧道施工質(zhì)量缺陷淺談[J];山西建筑;2007年03期
10 胡煒;曾東洋;;平行盾構(gòu)隧道施工地表變位影響因素研究[J];鐵道工程學(xué)報(bào);2007年03期
相關(guān)會(huì)議論文 前10條
1 朱合華;丁文其;橋本正;長(zhǎng)屋淳一;;盾構(gòu)隧道施工過(guò)程模擬分析[A];第一屆海峽兩岸隧道與地下工程學(xué)術(shù)與技術(shù)研討會(huì)論文集(上冊(cè))[C];1999年
2 崣文;王懽宇;李建_7;[k海霞;;盾構(gòu)隧道施工中上浮管片的受力分布研究[A];第八屆海峽兩岸隧道與地下工程學(xué)術(shù)與技術(shù)研討會(huì)論文集[C];2009年
3 王子煜;李金安;;盾構(gòu)隧道施工安全管理[A];河南省土木建筑學(xué)會(huì)2010年學(xué)術(shù)大會(huì)論文集[C];2010年
4 周建鋼;;疊落式盾構(gòu)隧道施工技術(shù)[A];第二屆全國(guó)地下、水下工程技術(shù)交流會(huì)論文集[C];2011年
5 林森;江濤;劉佳明;孟昆鵬;李朝;;地鐵盾構(gòu)隧道施工風(fēng)險(xiǎn)與規(guī)避對(duì)策研究[A];2012中國(guó)城市軌道交通關(guān)鍵技術(shù)論壇暨第三屆中國(guó)(長(zhǎng)春)國(guó)際軌道交通論壇論文集[C];2012年
6 李東海;;復(fù)雜環(huán)境下盾構(gòu)隧道施工引起的地表沉降分析[A];中國(guó)巖石力學(xué)與工程實(shí)例第一屆學(xué)術(shù)會(huì)議論文集[C];2007年
7 魏新江;魏}
本文編號(hào):2231119
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2231119.html