盾構(gòu)機(jī)遠(yuǎn)程監(jiān)控系統(tǒng)架構(gòu)及關(guān)鍵技術(shù)研究
[Abstract]:As an effective tool for shield machine construction management, the remote monitoring system of shield machine is being developed and perfected continuously. Compared with the remote monitoring system of system level shield machine, the remote monitoring system of shield machine is concentrated in the application of single project compared with foreign countries. All the existing systems fail to complete several projects. In view of this situation, the structure and key technology of the remote monitoring system of the shield machine are studied in this paper.
In this paper, through system requirement analysis, system logic model design, system database design and shield machine calendar design, the design and implementation of multiple functional modules are completed. Finally, the intelligent analysis of the shield construction state is realized by using sensor data to realize data recognition. Through the system requirements analysis, the whole system is integrated from the whole system. It is divided into the company level management system and the shield machine level management system, and the tree graph is used to express the logic model of the system and the flow direction of the information flow. In the data storage layer, three databases are set up to save the data table according to the different classification of the data service objects, and the CV management technology is set into the system to complete the shield machine calendar manager. The design of the case, through the method of multidimensional correlation analysis, the relationship between the shield construction state and the data of the related sensor data concentration is obtained. The intelligent analysis algorithm of the shield propulsion state is designed and the program is realized. On the basis of the analysis of the routine maintenance plan of the shield machine, the rules for the timing maintenance work are set up. The shield machine maintenance module is counted and the program is programmed to realize its function. Finally, the design of the shield machine level construction management system is completed according to the structure of the shield machine level construction management. On this basis, the shield team management module is designed to write the background program to realize its function.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TP311.52;U455.39
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 林志,胡向東;EPB盾構(gòu)信息化管理系統(tǒng)在廣州地鐵的應(yīng)用[J];地下空間與工程學(xué)報(bào);2005年02期
2 劉朝明;劉國(guó)彬;;上海軌道交通建設(shè)工程風(fēng)險(xiǎn)遠(yuǎn)程監(jiān)控管理的探索與研究[J];地下工程與隧道;2005年04期
3 周文波;盾構(gòu)隧道信息化施工智能管理系統(tǒng)的開(kāi)發(fā)應(yīng)用[J];都市快軌交通;2004年04期
4 李玉河;吳衛(wèi)國(guó);吳國(guó)祥;;工程機(jī)械遠(yuǎn)程監(jiān)控系統(tǒng)設(shè)計(jì)[J];工程機(jī)械;2007年04期
5 劉燕;劉國(guó)彬;劉濤;;城市軌道交通建設(shè)遠(yuǎn)程監(jiān)控管理探索與實(shí)踐[J];城市軌道交通研究;2006年04期
6 項(xiàng)貽強(qiáng);趙陽(yáng);;隧道盾構(gòu)施工遠(yuǎn)程監(jiān)控及反饋分析系統(tǒng)的研究[J];中外公路;2009年01期
7 陳佳璋;;隧道掘進(jìn)施工盾構(gòu)機(jī)管控一體化系統(tǒng)[J];城市道橋與防洪;2010年07期
8 陳剛;楊宏燕;彭瑞;;盾構(gòu)施工信息可視化分析軟件的設(shè)計(jì)和實(shí)現(xiàn)[J];工程建設(shè)與設(shè)計(jì);2010年11期
9 劉宣宇;邵誠(chéng);;盾構(gòu)機(jī)自動(dòng)控制技術(shù)現(xiàn)狀與展望[J];機(jī)械工程學(xué)報(bào);2010年20期
10 周文波;;盾構(gòu)法隧道施工智能化輔助決策系統(tǒng)的研制與應(yīng)用[J];巖石力學(xué)與工程學(xué)報(bào);2003年S1期
本文編號(hào):2174015
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2174015.html