寧波公交智能化系統(tǒng)的項(xiàng)目管理研究和實(shí)踐
本文選題:公交智能化 切入點(diǎn):信息系統(tǒng) 出處:《浙江工業(yè)大學(xué)》2014年碩士論文 論文類型:學(xué)位論文
【摘要】:隨著我國(guó)經(jīng)濟(jì)的快速發(fā)展,城市交通擁堵、大氣環(huán)境污染、交通安全等一系列問(wèn)題嚴(yán)重阻礙社會(huì)經(jīng)濟(jì)的可持續(xù)發(fā)展。為了解決當(dāng)前日益突出的城市交通問(wèn)題,國(guó)內(nèi)很多公交企業(yè)和計(jì)算機(jī)高科技公司都在積極推進(jìn)智能公交系統(tǒng)的建設(shè)。國(guó)內(nèi)公交企業(yè)的信息化起步較晚,缺少信息系統(tǒng)項(xiàng)目實(shí)施的管理經(jīng)驗(yàn),導(dǎo)致很多項(xiàng)目的建設(shè)質(zhì)量達(dá)不到預(yù)期的效果。在公交信息系統(tǒng)項(xiàng)目日漸增多的今天,如何提高公交企業(yè)實(shí)施信息系統(tǒng)項(xiàng)目的成功率,已成為公交企業(yè)關(guān)注的重點(diǎn)問(wèn)題。 本文以現(xiàn)代項(xiàng)目管理之項(xiàng)目生命周期理論為基礎(chǔ),結(jié)合信息系統(tǒng)構(gòu)建的特點(diǎn)和寧波公交的實(shí)際情況,采用理論結(jié)合實(shí)際案例的方法,通過(guò)梳理、總結(jié)國(guó)內(nèi)外文獻(xiàn)資料和最新學(xué)術(shù)成果,研究在公交智能化系統(tǒng)實(shí)施中應(yīng)用生命周期管理和項(xiàng)目管理的過(guò)程和方法。本文首先從寧波公交智能化系統(tǒng)的需求入手,通過(guò)對(duì)寧波公交智能化系統(tǒng)的分析和設(shè)計(jì),展示了項(xiàng)目管理在項(xiàng)目啟動(dòng)階段中的使用過(guò)程、方法和技巧。繼而通過(guò)對(duì)寧波公交智能化系統(tǒng)項(xiàng)目范圍進(jìn)行工作分解,制定詳細(xì)的項(xiàng)目管理計(jì)劃。然后以項(xiàng)目進(jìn)度控制、范圍調(diào)整、質(zhì)量控制、風(fēng)險(xiǎn)控制等手段,展現(xiàn)了在項(xiàng)目執(zhí)行的實(shí)際過(guò)程中項(xiàng)目管理方法和技術(shù)。最后,對(duì)案例的實(shí)施效果進(jìn)行評(píng)估和總結(jié),列舉了在進(jìn)行信息系統(tǒng)項(xiàng)目時(shí)應(yīng)該注意的問(wèn)題,并給出針對(duì)這些問(wèn)題的項(xiàng)目實(shí)施建議。 通過(guò)寧波公交智能化系統(tǒng)的實(shí)施,說(shuō)明利用IT項(xiàng)目管理思想、方法和工具可以對(duì)項(xiàng)目的時(shí)間、質(zhì)量和成本起到較好的控制作用,提高項(xiàng)目的實(shí)施成功率,保護(hù)企業(yè)的投資。文章最后,在結(jié)論部分提出了本論文存在的局限和有待進(jìn)一步研究的問(wèn)題。
[Abstract]:With the rapid economic development of our country, a series of problems, such as urban traffic congestion, air pollution, traffic safety and so on, seriously hinder the sustainable development of social economy. Many domestic public transport enterprises and computer high-tech companies are actively promoting the construction of intelligent public transport systems. The informatization of domestic public transport enterprises has started relatively late and lacks management experience in the implementation of information systems projects. As a result, the construction quality of many projects can not reach the expected results. Nowadays, with the increasing number of public transport information system projects, how to improve the success rate of public transport enterprises to implement information system projects has become the focus of public transport enterprises. Based on the project life cycle theory of modern project management, combining the characteristics of information system construction and the actual situation of Ningbo public transport, this paper adopts the method of combining theory with practical cases, through combing, This paper summarizes the literature and the latest academic achievements at home and abroad, studies the process and method of applying life cycle management and project management in the implementation of intelligent transit system. Firstly, this paper starts with the demand of Ningbo bus intelligent system. Based on the analysis and design of Ningbo bus intelligent system, the application process, methods and techniques of project management in the start stage of the project are demonstrated, and then the project scope of Ningbo bus intelligent system is decomposed. Make detailed project management plan. Then by means of project schedule control, scope adjustment, quality control, risk control and so on, show the project management methods and techniques in the actual process of project implementation. This paper evaluates and summarizes the effect of the implementation of the case, enumerates the problems that should be paid attention to when carrying out the information system project, and gives some suggestions for the implementation of the project in view of these problems. Through the implementation of Ningbo bus intelligent system, it is shown that the application of IT project management ideas, methods and tools can play a better role in controlling the time, quality and cost of the project, and improve the success rate of the project implementation. Finally, in the conclusion part, the limitations of this paper and the problems to be further studied are put forward.
【學(xué)位授予單位】:浙江工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U495
【共引文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳汶濱;王力;劉義軍;;工作量估算模型在軟件開(kāi)發(fā)平臺(tái)上的應(yīng)用[J];兵工自動(dòng)化;2009年03期
2 凌軍;;地鐵建設(shè)項(xiàng)目的信息化管理:以新加坡地鐵項(xiàng)目為例[J];東方企業(yè)文化;2010年08期
3 路全;;關(guān)口電量采集分析系統(tǒng)進(jìn)度計(jì)劃管理研究[J];電腦開(kāi)發(fā)與應(yīng)用;2011年05期
4 李源;;基于JavaEE的迎新信息管理系統(tǒng)設(shè)計(jì)與實(shí)現(xiàn)[J];電腦知識(shí)與技術(shù);2011年26期
5 任永昌;邢濤;;基于掙值管理的軟件開(kāi)發(fā)成本控制方法的研究[J];中國(guó)管理信息化(綜合版);2007年10期
6 吳建財(cái);;論電子政務(wù)協(xié)同辦公系統(tǒng)的需求管理和范圍管理[J];電腦知識(shí)與技術(shù);2013年04期
7 朱仁貴;朱宇;方波;張建華;劉加強(qiáng);;國(guó)營(yíng)船企實(shí)施CIMS系統(tǒng)經(jīng)驗(yàn)淺談[J];中國(guó)管理信息化;2013年16期
8 王聰;郭懷蕾;;我院超聲信息系統(tǒng)建設(shè)及改進(jìn)深度探討[J];電腦編程技巧與維護(hù);2014年08期
9 徐曉燕;劉琴;;改進(jìn)的模糊故障樹(shù)在農(nóng)村BOT項(xiàng)目風(fēng)險(xiǎn)評(píng)估中的應(yīng)用[J];西北工業(yè)大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2014年01期
10 崔圓;楊杰;袁文君;朱云艷;孫麗江;;上海臨港大學(xué)城及周邊公共交通狀況的調(diào)查研究[J];讀書(shū)文摘;2014年18期
相關(guān)會(huì)議論文 前2條
1 程明;李凡;馬勇;于仕;李煒;梁良;;基于開(kāi)放架構(gòu)的信息系統(tǒng)運(yùn)維監(jiān)控輔助支持系統(tǒng)關(guān)鍵技術(shù)研究與應(yīng)用[A];2013電力行業(yè)信息化年會(huì)論文集[C];2013年
2 朱昊;趙方;;上海公交信息化總體方案研究[A];新型城鎮(zhèn)化與交通發(fā)展——2013年中國(guó)城市交通規(guī)劃年會(huì)暨第27次學(xué)術(shù)研討會(huì)論文集[C];2014年
相關(guān)博士學(xué)位論文 前6條
1 李炎清;基于項(xiàng)目管理的大學(xué)生活動(dòng)管理研究[D];華中科技大學(xué);2011年
2 王桂森;企業(yè)IT服務(wù)外包風(fēng)險(xiǎn)控制模型研究[D];哈爾濱工業(yè)大學(xué);2011年
3 柏定國(guó);基于項(xiàng)目管理的縣域文化產(chǎn)業(yè)研究[D];中南大學(xué);2005年
4 王乾坤;建設(shè)項(xiàng)目集成管理研究[D];武漢理工大學(xué);2006年
5 王學(xué)貴;礦山建設(shè)立井施工項(xiàng)目集成管理研究[D];中國(guó)礦業(yè)大學(xué)(北京);2012年
6 郭研;資源受限的軟件項(xiàng)目群調(diào)度問(wèn)題研究[D];南京航空航天大學(xué);2013年
,本文編號(hào):1573064
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/1573064.html