淺談二次結(jié)構(gòu)輕集料混凝土空心砌塊及混凝土蒸汽加壓砌塊墻體機(jī)電暗配管施工

發(fā)布時間:2018-03-31 18:56

  本文選題:二次結(jié)構(gòu)砌筑 切入點:抹灰 出處:《施工技術(shù)》2017年S1期


【摘要】:某工程中機(jī)電暗配管對輕集料混凝土空心砌塊墻采用先配管后砌筑的施工工藝,對混凝土蒸汽加壓砌塊墻采用先砌筑后剔槽配管并抹灰封堵的施工工藝,這樣施工對二次結(jié)構(gòu)墻體影響較小,施工中能提高生產(chǎn)效率、節(jié)約成本。詳細(xì)介紹了此工程中運(yùn)用的機(jī)電暗配管施工技術(shù)。
[Abstract]:In a certain project, the construction technology of laying pipe first and then masonry is adopted for the hollow block wall of lightweight aggregate concrete, and the construction technology of laying pipe first and then plastering and plugging the wall of concrete steam pressure block wall is adopted in a certain project. In this way, the construction has little influence on the secondary structure wall, which can improve the production efficiency and save the cost. This paper introduces in detail the construction technology of electromechanical dark pipe arrangement used in this project.
【作者單位】: 中國建筑一局(集團(tuán))有限公司;
【分類號】:TU522.3;TU974
,

本文編號:1692012

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/huaxuehuagong/1692012.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶f0358***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com