鞍山達(dá)道灣污水廠升級(jí)改造工藝研究

發(fā)布時(shí)間:2018-04-22 08:47

  本文選題:升級(jí)改造 + A~2/O工藝; 參考:《哈爾濱工業(yè)大學(xué)》2015年碩士論文


【摘要】:為了提高城市污水處理廠出水水質(zhì)標(biāo)準(zhǔn),達(dá)道灣污水處理廠對(duì)原有A/O工藝進(jìn)行升級(jí)改造,主要工藝是將廠區(qū)原有的A/O池增加一段缺氧區(qū)改造成A~2/O池,從而將原有二級(jí)出水標(biāo)準(zhǔn)提升成為一級(jí)A出水標(biāo)準(zhǔn)。本課題在對(duì)達(dá)道灣污水處理廠實(shí)際工程進(jìn)行分析調(diào)研的基礎(chǔ)上,提出改造設(shè)計(jì)方案。針對(duì)達(dá)道灣污水廠實(shí)際情況和升級(jí)要求,本研究確定將A/O工藝升級(jí)改造為A~2/O工藝,并根據(jù)一級(jí)A標(biāo)準(zhǔn)要求對(duì)進(jìn)出水水質(zhì)進(jìn)行論證,成功啟動(dòng)A~2/O工藝后,通過檢測(cè)進(jìn)水、出水COD、BOD、氨氮、總氮和總磷等水質(zhì)指標(biāo)對(duì)改造工藝進(jìn)行調(diào)試。在工藝穩(wěn)定運(yùn)行后,出水BOD濃度小于7 mg/L,出水COD濃度平均值為36 mg/L;出水的氨氮濃度為3.14 mg/L;出水總氮濃度為9.45mg/L;總磷平均值為0.42 mg/L,各水質(zhì)指標(biāo)均已達(dá)到國家一級(jí)A標(biāo)準(zhǔn)。與原有工藝相比,有機(jī)物的去除和脫氮除磷效果有了顯著提升,A~2/O工藝穩(wěn)定運(yùn)行,達(dá)道灣污水廠改造升級(jí)得到較好效果。為了進(jìn)一步提高工藝運(yùn)行效果,同時(shí)達(dá)到節(jié)約成本目的,本課題對(duì)改造工藝運(yùn)行參數(shù)進(jìn)行優(yōu)化,混合液內(nèi)回流比從300%降低到250%,污泥回流比降低到75%,A~2/O工藝的污泥齡縮短為15 d,參數(shù)優(yōu)化后最顯著的效果是提高了除磷效率,而有機(jī)物去除效果和脫氮效果也維持在較高水平。同時(shí)混合液內(nèi)回流比、污泥回流比的降低也節(jié)省了運(yùn)行成本。A~2/O工藝具有同步脫氮除磷功效,該工藝有簡(jiǎn)單的構(gòu)造、較短的總水力停留時(shí)間、較低的運(yùn)行費(fèi)用等優(yōu)點(diǎn)。因此,如果提高脫氮除磷功能,傳統(tǒng)活性污泥污水處理廠選擇最佳的工藝就是A~2/O工藝。在實(shí)際應(yīng)用中,對(duì)工藝處理效果進(jìn)行分析,同時(shí)對(duì)運(yùn)行參數(shù)進(jìn)行了優(yōu)化調(diào)控,得到了工藝運(yùn)行的最佳參數(shù),在達(dá)到工藝升級(jí)要求的基礎(chǔ)上,提高了其運(yùn)行效能。同時(shí)為鞍山其它水廠提供有益的參考。
[Abstract]:In order to improve the effluent quality standard of the municipal sewage treatment plant, the original A- / O process was upgraded at the Dadaowan sewage treatment Plant. The main process was to transform the original A- / O pool into an A2 / O pool by adding a section of anoxic zone to the original A- / O pool in the plant area. Thus, the original secondary effluent standard was raised to a class A effluent standard. On the basis of analyzing and investigating the actual project of Dadaowan sewage treatment Plant, this paper puts forward the retrofit design scheme. In view of the actual situation and upgrading requirements of the Dadaowan sewage treatment Plant, this study determined to upgrade the A- / O process to A2 / 2 / O process, and to demonstrate the quality of the incoming and outgoing water according to the requirements of the first class A standard. After successfully starting the A0 / 2 / O process, the inlet water was detected. Water quality indexes such as COD BOD, ammonia nitrogen, total nitrogen and total phosphorus were adjusted. After stable operation, the effluent BOD concentration is less than 7 mg / L, the average effluent COD concentration is 36 mg / L, the effluent ammonia nitrogen concentration is 3.14 mg / L, the effluent total nitrogen concentration is 9.45 mg / L, the average total phosphorus is 0.42 mg / L, each water quality index has reached the national A standard. Compared with the original process, the removal of organic matter and the removal of nitrogen and phosphorus have significantly improved the stable operation of the A2 / O process, and the upgrading of the Dadaowan sewage treatment Plant has achieved better results. In order to further improve the effect of process operation and achieve the purpose of cost saving, this paper optimizes the operation parameters of the revamped process. The reflux ratio in the mixed solution was reduced from 300% to 250 and the sludge reflux ratio to 75 / 2 / O was shortened to 15 days. The most significant effect after parameter optimization was to improve the efficiency of phosphorus removal, while the removal efficiency of organic matter and nitrogen removal was maintained at a higher level. At the same time, the ratio of reflux in mixed liquid and the ratio of sludge reflux are also reduced. The operation cost is also saved. The process has the advantages of simultaneous denitrification and phosphorus removal. The process has the advantages of simple structure, short total hydraulic retention time and low running cost. Therefore, if the denitrification and phosphorus removal function is improved, the traditional activated sludge wastewater treatment plant choose the best process is An 2 / O process. In practical application, the effect of process treatment is analyzed, and the operation parameters are optimized and adjusted, and the optimum parameters of process operation are obtained. On the basis of meeting the requirements of process upgrading, the operation efficiency is improved. At the same time, it provides useful reference for other water plants in Anshan.
【學(xué)位授予單位】:哈爾濱工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:X703

【參考文獻(xiàn)】

相關(guān)期刊論文 前4條

1 李培;潘楊;;A~2/O工藝內(nèi)回流中溶解氧對(duì)反硝化的影響[J];環(huán)境科學(xué)與技術(shù);2012年01期

2 解晨煒;孫艷群;;A~2/O污水處理工藝中常見問題及其控制措施[J];山西建筑;2012年01期

3 紀(jì)潤(rùn)花;;污水處理廠A~2/O工藝的調(diào)試和運(yùn)行[J];科技情報(bào)開發(fā)與經(jīng)濟(jì);2011年10期

4 黎巍;曾向東;;城市污水處理廠的技術(shù)經(jīng)濟(jì)綜合分析與評(píng)價(jià)[J];工業(yè)安全與環(huán)保;2009年01期

相關(guān)碩士學(xué)位論文 前3條

1 蘇學(xué)軍;大唐克旗煤制氣廢水處理項(xiàng)目后評(píng)價(jià)研究[D];華北電力大學(xué);2014年

2 亓峰;汽車服務(wù)中心建設(shè)項(xiàng)目環(huán)境影響評(píng)價(jià)研究[D];青島理工大學(xué);2013年

3 范學(xué)斌;廈門市翔安區(qū)供水工程可行性研究[D];同濟(jì)大學(xué);2006年

,

本文編號(hào):1786453

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/huanjinggongchenglunwen/1786453.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶4e9ba***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com
少妇丰满a一区二区三区| a久久天堂国产毛片精品| 欧美日韩综合综合久久久| 亚洲黄色在线观看免费高清| 中文字幕中文字幕在线十八区 | 日本欧美三级中文字幕| 午夜传媒视频免费在线观看| 亚洲精品偷拍视频免费观看| 国产成人国产精品国产三级| 黄男女激情一区二区三区| 国产三级不卡在线观看视频| 国产成人精品一区二区在线看| 欧美日韩欧美国产另类| 日韩精品中文字幕亚洲| 欧美精品一区久久精品| 少妇毛片一区二区三区| 日韩一区二区三区高清在| 97人妻人人揉人人躁人人| 色婷婷视频在线精品免费观看| 国产成人亚洲欧美二区综| 国产高清三级视频在线观看| 人妻内射在线二区一区| 狠狠干狠狠操在线播放| 欧美成人精品国产成人综合| 国产成人精品国产成人亚洲| 精品日韩av一区二区三区| 情一色一区二区三区四| 日韩人妻av中文字幕| 国产成人人人97超碰熟女| 免费在线观看激情小视频| 精品伊人久久大香线蕉综合| 欧美成人免费一级特黄| 欧美特色特黄一级大黄片| 亚洲精品国产精品日韩| 五月婷婷综合激情啪啪| 日韩国产欧美中文字幕| 亚洲一区二区久久观看| 91欧美视频在线观看免费| 国产一区二区三区av在线| 东京热加勒比一区二区| 日韩一区二区三区在线欧洲|