110kV美蘭變電站綜合自動(dòng)化改造
[Abstract]:The integrated automation of substation is the comprehensive application of all kinds of high technology in substation equipment, which includes computer technology, communication technology and automation technology. The gradual implementation of 110kV traditional substation integrated automation transformation is of positive significance for improving the operation management mode of substation, improving the level of equipment automation and further tamping the foundation of safety in production. First of all, this paper briefly introduces the function and present situation of substation integrated automation, then introduces the situation before the transformation of 110 kV Meilan substation equipment, and puts forward the design principles and main contents of the transformation scheme. Then combined with the engineering practice of Meilan substation transformation, the design scheme of Meilan substation integrated automation system and relay protection equipment is worked out. From the point of view of site safety construction and reliable power supply of power grid, the field construction scheme of Meilan substation reconstruction project is worked out. Then the feasibility of the construction scheme is analyzed and explained, the optimal construction scheme is determined, and the steps of the scheme are refined and explained. Combined with the field situation of the substation, this paper analyzes the problems existing in the transformation, such as the blind area existing in the standby self-switching, the anti-jump loop of the mechanism, and puts forward the solution and implementation, which has achieved good results in the practical application of the project. The reformed system has the characteristics of functional integration, distributed stratification in structure, networking of communication, screen of operation and monitoring, digitization of measurement and display, intelligence of operation and management, and so on. The function of "four remote" is realized. Through this transformation, the power quality of substation system is improved and the management level is improved.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類(lèi)號(hào)】:TM63;TM76
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 丁超;;變電站監(jiān)控系統(tǒng)人機(jī)界面的設(shè)計(jì)[J];電工技術(shù);2007年10期
2 黃國(guó)方;徐石明;周斌;于海波;沈健;張何;梅德冬;丁杰;王善祥;;新型變電站綜合測(cè)控裝置優(yōu)化設(shè)計(jì)[J];電力系統(tǒng)自動(dòng)化;2009年19期
3 楊奇遜;變電站綜合自動(dòng)化技術(shù)發(fā)展趨勢(shì)[J];電力系統(tǒng)自動(dòng)化;1995年10期
4 趙曉微,李桂義,賈明娜,徐丙垠;GPS 同步時(shí)鐘在電力系統(tǒng)中的應(yīng)用[J];電力系統(tǒng)通信;1998年05期
5 徐穎秦,沈艷霞,張業(yè)發(fā);無(wú)人值班變電站數(shù)字視頻遠(yuǎn)程監(jiān)控系統(tǒng)研究[J];電力系統(tǒng)及其自動(dòng)化學(xué)報(bào);2005年04期
6 付功連;;老變電站設(shè)備改造經(jīng)驗(yàn)[J];湖北水力發(fā)電;2006年02期
7 顧維邦;;淺談110kV常規(guī)變電站綜合自動(dòng)化改造[J];內(nèi)蒙古電力技術(shù);2007年06期
8 周維維;;220kV青龍山變電站綜合自動(dòng)化改造技術(shù)及經(jīng)驗(yàn)[J];攀枝花學(xué)院學(xué)報(bào);2009年06期
9 李均華;;變電站綜合自動(dòng)化系統(tǒng)的選型[J];四川電力技術(shù);2006年05期
10 張雁靖;分層分布開(kāi)放式計(jì)算機(jī)監(jiān)控系統(tǒng)的設(shè)計(jì)[J];水利水電技術(shù);1997年05期
,本文編號(hào):2485778
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/2485778.html