計(jì)及儲(chǔ)能容量?jī)?yōu)化的含風(fēng)光儲(chǔ)配電網(wǎng)可靠性評(píng)估
[Abstract]:The improved quasi-sequential Monte Carlo method is used to evaluate the reliability of distribution network. Two indexes to measure the fluctuation of active power in the combined energy storage system are proposed to optimize the energy storage capacity. Based on the results of energy storage capacity optimization, the effects of different coordinated operation strategies and isolated island partition schemes on the reliability evaluation of distribution network are compared and analyzed. The analysis of the modified IEEE RBTS BUS6 example shows that the reasonable selection of energy storage capacity can reduce the fluctuation of active power and reduce the waste of energy. Compared with the capacity tracking strategy, the load following strategy can improve the power supply reliability of the system. In different islanding schemes, the power supply reliability of the system is higher than that of scattered load with less priority removal load and centralized power load with large priority excising load.
【作者單位】: 武漢大學(xué)電氣工程學(xué)院;
【基金】:國(guó)家電網(wǎng)公司總部科技項(xiàng)目(5211011400BT) 國(guó)家自然科學(xué)基金資助項(xiàng)目(51347006)~~
【分類(lèi)號(hào)】:TM732;TM61
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 漆景星;侯艷紅;;橋梁可靠性評(píng)估綜述[J];浙江交通職業(yè)技術(shù)學(xué)院學(xué)報(bào);2011年01期
2 張家常;指控設(shè)備與系統(tǒng)的可靠性評(píng)估[J];艦船科學(xué)技術(shù);1995年05期
3 李美珍;;配電網(wǎng)可靠性評(píng)估的網(wǎng)絡(luò)等值法模型實(shí)驗(yàn)研究[J];價(jià)值工程;2013年31期
4 劉洋,周家啟;大電網(wǎng)可靠性評(píng)估最優(yōu)負(fù)荷削減模型[J];重慶大學(xué)學(xué)報(bào)(自然科學(xué)版);2003年10期
5 鐘杰峰,陳旭,吳寶英,黃金鳳,萬(wàn)官泉;廣東500kV主網(wǎng)可靠性評(píng)估[J];華東電力;2004年03期
6 周正伐;對(duì)“威布爾型產(chǎn)品可靠性評(píng)估方法應(yīng)用中的幾個(gè)問(wèn)題”一文的幾點(diǎn)看法[J];質(zhì)量與可靠性;2004年02期
7 柳亦鋼;易仕敏;楊華;;發(fā)電廠(chǎng)可靠性評(píng)估的解析方法[J];云南電力技術(shù);2005年05期
8 周源泉,王健,常煜輝;某型沖壓發(fā)動(dòng)機(jī)的可靠性評(píng)估(續(xù))[J];質(zhì)量與可靠性;2005年01期
9 李國(guó)慶;于海承;李奇;邱愛(ài)華;;地方供電網(wǎng)可靠性評(píng)估[J];東北電力大學(xué)學(xué)報(bào);2006年02期
10 張士峰;楊華波;張金槐;;小樣本成敗型設(shè)備可靠性評(píng)估方法[J];核動(dòng)力工程;2006年05期
相關(guān)會(huì)議論文 前10條
1 朱三可;李祥臣;齊俊臣;彭道勇;;可靠性評(píng)估中指數(shù)型數(shù)據(jù)向成敗型數(shù)據(jù)的折合[A];2009第十三屆全國(guó)可靠性物理學(xué)術(shù)討論會(huì)論文集[C];2009年
2 王正良;;同步可靠性評(píng)估方法[A];中國(guó)工程物理研究院科技年報(bào)(2003)[C];2003年
3 夏秀華;;結(jié)構(gòu)可靠性評(píng)估方法[A];第四屆全國(guó)現(xiàn)代結(jié)構(gòu)工程學(xué)術(shù)研討會(huì)論文集[C];2004年
4 姚新民;孫偉;劉忠卿;陳以方;;新裝備初期部署階段的可靠性評(píng)估[A];2012年全國(guó)機(jī)械行業(yè)可靠性技術(shù)學(xué)術(shù)交流會(huì)暨第四屆可靠性工程分會(huì)第四次全體委員大會(huì)論文集[C];2012年
5 王德民;雪喜兵;孫秦;羊妗;;復(fù)合材料梁架結(jié)構(gòu)的可靠性評(píng)估[A];復(fù)合材料的現(xiàn)狀與發(fā)展——第十一屆全國(guó)復(fù)合材料學(xué)術(shù)會(huì)議論文集[C];2000年
6 賈曉紅;;典型配電系統(tǒng)的可靠性評(píng)估和分析[A];山東電機(jī)工程學(xué)會(huì)第四屆供電專(zhuān)業(yè)學(xué)術(shù)交流會(huì)論文集[C];2007年
7 秦紀(jì)平;劉前進(jìn);;基于成功概率的配網(wǎng)可靠性評(píng)估[A];中國(guó)高等學(xué)校電力系統(tǒng)及其自動(dòng)化專(zhuān)業(yè)第二十四屆學(xué)術(shù)年會(huì)論文集(上冊(cè))[C];2008年
8 吳開(kāi)貴;周家啟;;線(xiàn)性?xún)?yōu)化神經(jīng)網(wǎng)絡(luò)在電網(wǎng)可靠性評(píng)估中的應(yīng)用研究[A];1999年中國(guó)神經(jīng)網(wǎng)絡(luò)與信號(hào)處理學(xué)術(shù)會(huì)議論文集[C];1999年
9 尹鎖柱;敖發(fā)良;;貓?zhí)恿饔蛩樽詣?dòng)測(cè)報(bào)系統(tǒng)可靠性評(píng)估[A];中國(guó)電子學(xué)會(huì)可靠性分會(huì)第十三屆學(xué)術(shù)年會(huì)論文選[C];2006年
10 王玉明;;最大熵可靠性評(píng)估方法的改進(jìn)[A];中國(guó)工程物理研究院科技年報(bào)(2003)[C];2003年
相關(guān)重要報(bào)紙文章 前1條
1 石松;基于分離特征樣本的核島主泵可靠性評(píng)估和壽命預(yù)測(cè)技術(shù)研究[N];科技日?qǐng)?bào);2007年
相關(guān)博士學(xué)位論文 前10條
1 方艮海;產(chǎn)品可靠性評(píng)估中的多源信息融合技術(shù)研究[D];合肥工業(yè)大學(xué);2006年
2 程皖民;基于小子樣復(fù)雜信息集的可靠性評(píng)估方法及其應(yīng)用研究[D];國(guó)防科學(xué)技術(shù)大學(xué);2006年
3 任淑紅;民航發(fā)動(dòng)機(jī)性能可靠性評(píng)估與在翼壽命預(yù)測(cè)方法研究[D];南京航空航天大學(xué);2010年
4 何禹清;配電網(wǎng)快速可靠性評(píng)估及重構(gòu)方法研究[D];湖南大學(xué);2011年
5 宋曉通;基于蒙特卡羅方法的電力系統(tǒng)可靠性評(píng)估[D];山東大學(xué);2008年
6 鐘波;基于軟計(jì)算理論的電力系統(tǒng)可靠性評(píng)估模型與算法研究[D];重慶大學(xué);2004年
7 汪隆君;電網(wǎng)可靠性評(píng)估方法及可靠性基礎(chǔ)理論研究[D];華南理工大學(xué);2010年
8 劉洋;大規(guī)模電力系統(tǒng)并行處理技術(shù)及可靠性評(píng)估Web計(jì)算系統(tǒng)研究[D];重慶大學(xué);2006年
9 楊俊;市場(chǎng)環(huán)境下電力系統(tǒng)可靠性分析若干問(wèn)題研究[D];華北電力大學(xué)(北京);2009年
10 趙淑媛;纖維隔熱材料微觀(guān)結(jié)構(gòu)與熱性質(zhì)演化及熱可靠性評(píng)估研究[D];哈爾濱工業(yè)大學(xué);2009年
相關(guān)碩士學(xué)位論文 前10條
1 王旗;基于相似機(jī)床信息的CXK5463的可靠性評(píng)估[D];燕山大學(xué);2015年
2 畢利鋒;基于網(wǎng)絡(luò)模型的復(fù)雜機(jī)電系統(tǒng)可靠性評(píng)估[D];北京交通大學(xué);2016年
3 陳明鈿;鐵路軌道“設(shè)備—單元—線(xiàn)路”系統(tǒng)可靠性建模與評(píng)估研究[D];北京交通大學(xué);2016年
4 唐磊;含間歇性電源的電力系統(tǒng)的規(guī)劃與可靠性評(píng)估[D];浙江大學(xué);2016年
5 才志遠(yuǎn);一種適用于高級(jí)量測(cè)體系的可靠性評(píng)估方法[D];華北電力大學(xué);2012年
6 梁文光;配電網(wǎng)可靠性評(píng)估及相關(guān)工作研究[D];昆明理工大學(xué);2011年
7 張輝;考慮不確定性的輸電網(wǎng)可靠性評(píng)估及軟件開(kāi)發(fā)[D];華北電力大學(xué);2013年
8 吳昌兵;珞璜電廠(chǎng)電氣主接線(xiàn)可靠性評(píng)估[D];重慶大學(xué);2007年
9 楊雪梅;基于等值網(wǎng)絡(luò)的配電網(wǎng)可靠性評(píng)估[D];華南理工大學(xué);2010年
10 楊棟;火電機(jī)組可靠性評(píng)估與維修決策支持系統(tǒng)[D];華北電力大學(xué)(北京);2006年
,本文編號(hào):2383429
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/2383429.html