某電廠600MW機(jī)組差脹、振動(dòng)故障診斷及處理
[Abstract]:In a power plant 600MW unit, the relative axial vibration of high pressure rotor is too large at critical speed, the relative axial vibration of high pressure rotor is higher at working speed, and the variation of expansion difference of high pressure cylinder is also a problem. By analyzing the measured vibration data, it is diagnosed that the serious first order mass imbalance exists in the rotor under the critical speed and the working speed of the high pressure rotor. The high speed dynamic balancing technique is adopted in the field to make the vibration of the unit reach the excellent level. In addition, the reason for diagnosing the differential expansion of high and middle pressure cylinder is the failure of the sensor, and the fault diagnosis is verified by field inspection.
【作者單位】: 西安熱工研究院有限公司汽輪機(jī)及熱力系統(tǒng)技術(shù)部;
【分類號(hào)】:TM311
【相似文獻(xiàn)】
相關(guān)期刊論文 前8條
1 張法科;;國產(chǎn)660MW超臨界機(jī)組高中壓轉(zhuǎn)子彎曲處理[J];中國電力;2014年01期
2 馬力深;鐘約先;馬慶賢;袁朝龍;;超(超)臨界火電機(jī)組高中壓轉(zhuǎn)子技術(shù)的發(fā)展[J];鍛壓技術(shù);2006年01期
3 王玲;郭祖光;平路光;;汽輪發(fā)電機(jī)高中壓轉(zhuǎn)子振動(dòng)原因分析[J];電站系統(tǒng)工程;2014年04期
4 黃俊;;300MW汽輪機(jī)高中壓轉(zhuǎn)子振動(dòng)突變故障處理[J];電力安全技術(shù);2006年07期
5 張學(xué)延,李亞軍;300MW機(jī)組高中壓轉(zhuǎn)子低頻振動(dòng)原因分析及其對(duì)策[J];熱力發(fā)電;1999年06期
6 龍勁強(qiáng);;國產(chǎn)300 MW汽輪機(jī)組高中壓轉(zhuǎn)子彎軸事故分析[J];江蘇電機(jī)工程;2008年04期
7 陳冀平;K-200-130-3型汽輪機(jī)高中壓轉(zhuǎn)子對(duì)輪螺栓裂紋原因分析[J];河北電力技術(shù);1989年01期
8 ;[J];;年期
相關(guān)會(huì)議論文 前2條
1 唐建偉;張精橋;;600MW空冷#1機(jī)組高中壓轉(zhuǎn)子過臨界振動(dòng)問題研究處理[A];第九屆電站金屬材料學(xué)術(shù)年會(huì)論文集(第二卷)[C];2011年
2 劉建軍;;黔北電廠2號(hào)機(jī)啟停和運(yùn)行過程中振動(dòng)大的原因分析和處理[A];貴州省電機(jī)工程學(xué)會(huì)2010年優(yōu)秀論文集[C];2010年
相關(guān)碩士學(xué)位論文 前1條
1 朱占魁;超超臨界高中壓轉(zhuǎn)子用1Cr12W2NiMoVNbN潔凈鋼冶煉技術(shù)研究[D];河南科技大學(xué);2014年