冀北電網(wǎng)調(diào)控能力評(píng)估與協(xié)調(diào)調(diào)度策略研究
[Abstract]:The north Hebei power grid is located in the periphery of the capital Beijing. It is responsible for the safe and stable operation of the power supply to the capital from the west to the east, from the north to the south, and from the north to the south, as well as to the safe and stable operation of the 500 kV ring network in the capital. At present, the generation units of 220kV and above voltage grade in the north Hebei power network are controlled by the direct dispatching of the North China Network. With the scale of the power network gradually increasing and the unit capacity increasing, how to give play to the main role of the North Hebei Electric Power Company, It is an urgent requirement to ensure the power supply of the capital more effectively and adapt to the rapid development of the power grid. However, it is a great challenge for the establishment of the independent control area in the north of Hebei Province to make a reasonable plan of the inter-provincial tie line, to establish the stratified control system and the multi-level coordination mechanism of the generator set up. In this paper, the structure, thermal power, wind power and load characteristics of the north Hebei power grid are analyzed firstly. The load of the north Hebei is divided into two parts: the base load and the peak load. The allocation mechanism is adopted to optimize the unqualified point and the lowest wind power output. The reasonable power of inter-provincial tie-line planning is studied with the constraints of local unit peak shaving capacity, load fluctuation regulating capacity and target generation hours. The standard fitting method and standard fine-tuning method are adopted. Three methods of optimal fitting are used to regularize the tie line. Then, considering the actual difference of unit performance and regulation range, the paper puts forward the stratified control strategy of unit in north Hebei for ACE assessment. Thirdly, the paper studies the support plan between the North China Power Grid and the North China Power Grid after the establishment of the independent control area in the north of Hebei Province, especially the coping strategy of the northern Hebei after the adjustment of the tie line plan. As well as the early warning mechanism and the support request strategy for the network adjustment when the control means of north Hebei are insufficient. The results show that the tie-line plan based on standard fine-tuning method is the most feasible under the consideration of tie-line fitting effect and evaluation requirements of North China Power Grid. By reasonably determining the shape of tie-line, combined with stratified control strategy and multi-level coordinated dispatching mechanism, the construction of independent control area can be realized in the north Hebei power network. The research results meet the requirements of establishing an independent control area in the north Hebei power grid and have significant application value for guiding the reporting of the liaison line and the daily work of the dispatchers.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:TM73
【參考文獻(xiàn)】
相關(guān)期刊論文 前8條
1 陳亮;陳雨果;;多目標(biāo)發(fā)電調(diào)度策略與方法[J];電力系統(tǒng)自動(dòng)化;2012年09期
2 鄒賢求;吳政球;陳波;張小兵;王國(guó)民;;變速恒頻雙饋風(fēng)電機(jī)組頻率控制策略的改進(jìn)[J];電力系統(tǒng)及其自動(dòng)化學(xué)報(bào);2011年03期
3 王堅(jiān);劉淼;張瑞陽(yáng);張坤;;南方電網(wǎng)特殊時(shí)段頻率控制[J];電力自動(dòng)化設(shè)備;2011年06期
4 陳琰,邱家駒,黃志龍,郭佳田;華東與福建聯(lián)網(wǎng)后頻率控制策略的研究[J];電網(wǎng)技術(shù);2002年06期
5 尚金成;;基于時(shí)間尺度的節(jié)能發(fā)電優(yōu)化調(diào)度協(xié)調(diào)模型及算法[J];電網(wǎng)技術(shù);2008年15期
6 黃韜;王堅(jiān);;南方電網(wǎng)頻率控制性能標(biāo)準(zhǔn)考核方法探討[J];南方電網(wǎng)技術(shù);2012年01期
7 鮑正杰;李生虎;;基于VSC-HVDC有功支援和自適應(yīng)低頻減載的區(qū)域電網(wǎng)頻率控制[J];電力系統(tǒng)保護(hù)與控制;2014年20期
8 吳雄;王秀麗;李駿;郭靜麗;張凱;陳潔;;風(fēng)電儲(chǔ)能混合系統(tǒng)的聯(lián)合調(diào)度模型及求解[J];中國(guó)電機(jī)工程學(xué)報(bào);2013年13期
,本文編號(hào):2336795
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/2336795.html