垃圾焚燒發(fā)電BOT項(xiàng)目收益的系統(tǒng)動力學(xué)模型
發(fā)布時間:2018-10-12 07:49
【摘要】:在垃圾焚燒發(fā)電BOT項(xiàng)目的前期決策中,項(xiàng)目收益是政府和項(xiàng)目公司展開談判的基礎(chǔ)問題。通過對此類項(xiàng)目收益系統(tǒng)的影響因素分析,基于系統(tǒng)動力學(xué)方法構(gòu)建了項(xiàng)目收益模型,并運(yùn)用模糊邏輯方法研究了地區(qū)經(jīng)濟(jì)發(fā)展水平和政府履約程度等定性因素對模型的影響。在此基礎(chǔ)上,運(yùn)用系統(tǒng)動力學(xué)分析軟件Vensim PLE和MATLAB軟件中的模糊邏輯工具箱,對垃圾焚燒發(fā)電BOT項(xiàng)目案例進(jìn)行模擬。根據(jù)項(xiàng)目收益變化情況的模擬結(jié)果,討論了在政府部門和項(xiàng)目公司各自期望的收益水平下特許期和特許價(jià)格的合理決策,并分析了特許期、特許價(jià)格和垃圾熱值變化對項(xiàng)目收益的影響,從而為政府和項(xiàng)目公司運(yùn)作垃圾焚燒發(fā)電BOT項(xiàng)目提供了決策參考。
[Abstract]:In the early decision of the BOT project of MSW incineration power generation, the project income is the basis of the negotiation between the government and the project company. Based on the analysis of the influencing factors of this kind of project income system, the project income model is constructed based on the system dynamics method, and the influence of qualitative factors, such as the level of regional economic development and the degree of government performance, on the model is studied by using the fuzzy logic method. On this basis, the case study of MSW incineration power generation BOT project is carried out by using the system dynamics analysis software Vensim PLE and the fuzzy logic toolbox in MATLAB software. According to the simulation results of the change of the project income, the reasonable decision of the concession period and the concession price under the expected income level of the government department and the project company are discussed, and the concession period is analyzed. The effect of the change of the concession price and the waste calorific value on the benefit of the project provides a decision reference for the government and the project company to operate the BOT project of MSW incineration power generation.
【作者單位】: 大連理工大學(xué)工商管理學(xué)院;遼寧科技大學(xué)工商管理學(xué)院;
【基金】:國家自然科學(xué)基金項(xiàng)目(71072107;71272091;71472022) 遼寧省高等學(xué)校優(yōu)秀人才支持計(jì)劃(LJQ2013011) 中央高;究蒲袠I(yè)務(wù)費(fèi)專項(xiàng)資金項(xiàng)目(DUT14RW210)
【分類號】:TM619
[Abstract]:In the early decision of the BOT project of MSW incineration power generation, the project income is the basis of the negotiation between the government and the project company. Based on the analysis of the influencing factors of this kind of project income system, the project income model is constructed based on the system dynamics method, and the influence of qualitative factors, such as the level of regional economic development and the degree of government performance, on the model is studied by using the fuzzy logic method. On this basis, the case study of MSW incineration power generation BOT project is carried out by using the system dynamics analysis software Vensim PLE and the fuzzy logic toolbox in MATLAB software. According to the simulation results of the change of the project income, the reasonable decision of the concession period and the concession price under the expected income level of the government department and the project company are discussed, and the concession period is analyzed. The effect of the change of the concession price and the waste calorific value on the benefit of the project provides a decision reference for the government and the project company to operate the BOT project of MSW incineration power generation.
【作者單位】: 大連理工大學(xué)工商管理學(xué)院;遼寧科技大學(xué)工商管理學(xué)院;
【基金】:國家自然科學(xué)基金項(xiàng)目(71072107;71272091;71472022) 遼寧省高等學(xué)校優(yōu)秀人才支持計(jì)劃(LJQ2013011) 中央高;究蒲袠I(yè)務(wù)費(fèi)專項(xiàng)資金項(xiàng)目(DUT14RW210)
【分類號】:TM619
【參考文獻(xiàn)】
相關(guān)期刊論文 前7條
1 楊宏偉,周晶,何建敏;在BOT模式下收費(fèi)道路的收益和社會效益研究[J];管理工程學(xué)報(bào);2004年01期
2 秦旋;基于CAPM的BOT項(xiàng)目特許期的計(jì)算模型[J];管理工程學(xué)報(bào);2005年02期
3 宋金波;王東波;宋丹榮;;基于蒙特卡羅模擬的污水處理BOT項(xiàng)目特許期決策模型[J];管理工程學(xué)報(bào);2010年04期
4 林昌梅;;生活垃圾焚燒廠噸垃圾發(fā)電量的研究分析[J];環(huán)境衛(wèi)生工程;2010年05期
5 時t熇,
本文編號:2265353
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/2265353.html
最近更新
教材專著