核電建設(shè)項(xiàng)目前期管理關(guān)鍵成功因素研究
[Abstract]:According to the requirements of the 12th Five-Year Plan, China will start construction of nuclear power projects with a total installed capacity of 4000 kilowatts in the next five years. "safe and efficient development of nuclear power" has become the general program of nuclear power development in this period. The current nuclear power project is ushered in a new round of development opportunities, as China's nuclear power construction gradually entered the stage of large-scale development, specialized, standardized pre-project work has become the direction of sustainable development of nuclear power. The early stage work of nuclear power construction project is the foundation of high quality construction and safe operation of nuclear power, so the reliability and efficiency of the early stage work of nuclear power also become a subject of wide concern in the whole society. This study is a sub-topic of horizontal scientific research project "Construction of innovative management system in the early stage of nuclear power project construction", which aims to study the key success factors of early stage management of nuclear power construction project. This paper systematically collects and arranges the domestic and foreign literature materials on related topics such as nuclear power project pre-work, nuclear power project management, key success factors and so on, and clearly defines the connotation and working elements of nuclear power construction project pre-management. Combing the process of pre-management of nuclear power construction project, analyzing the objectives of pre-management of nuclear power, analyzing the characteristics of relevant research results at home and abroad and the points that can be used for reference. The particularity and research value of key success factors in early stage management of nuclear power construction project in China are clarified. This paper summarizes the elements of the pre-management of nuclear power project, including the management elements of the pre-management of the nuclear power project, the analysis, arrangement and reconstruction of the content and process. Based on the analysis of management elements, this paper determines the improved AHP as the method of determining the weight of management elements, that is, the method of identifying key success factors through the comparison and selection of the method of determining the weight of the management elements. The identification framework of key success factors in early stage management of nuclear power construction project is constructed. Two rounds of Delphi method are used to collect data. By calculating the weights of each work element, 10 key success factors are identified, 28 key success factors are identified, and about two work elements are reduced under the framework of identification of key success factors. Finally, the key success factors identified are applied to the actual project to guide the project management optimization, and the scientific and practical value of the key success factors are verified by the project practice. This study identified the key success factors of early management of nuclear power construction project and passed the practical test of a nuclear power project. The research results can provide new ideas and horizons for all parties involved in nuclear power projects, especially for owners of nuclear power, optimize the form of pre-management, and provide a theoretical and practical reference for the pre-management of nuclear power construction projects.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TM623
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王剛;廖淋;吳海龍;;江西彭澤核電項(xiàng)目前期HSE管理實(shí)踐[J];項(xiàng)目管理技術(shù);2012年07期
2 馮斌;;核電項(xiàng)目前期費(fèi)用的投資控制研究[J];科技信息;2011年22期
3 李鐵志;;核電項(xiàng)目前期執(zhí)照申請(qǐng)管理的探索與實(shí)踐[J];中國(guó)科技信息;2011年15期
4 李恩鵬;;核電前期可行性研究階段的計(jì)劃管理[J];科技信息;2011年18期
5 孫慧;孫曉鵬;范志清;;PPP項(xiàng)目中再談判關(guān)鍵影響因素的研究[J];國(guó)際經(jīng)濟(jì)合作;2010年03期
6 王文周;宋娟;李建平;;項(xiàng)目成功因素文獻(xiàn)綜述研究[J];中國(guó)軟科學(xué);2010年01期
7 謝阿海;;核電項(xiàng)目前期工作關(guān)鍵路徑分析[J];核動(dòng)力工程;2009年S2期
8 呂萍;許敏;;基于生命周期的項(xiàng)目關(guān)鍵成功因素的研究[J];經(jīng)濟(jì)與管理研究;2007年12期
9 黃定軒;尤建新;杜波;;不同角色視角的建筑施工項(xiàng)目關(guān)鍵因素實(shí)證分析[J];土木工程學(xué)報(bào);2007年04期
10 何曉晴;曾志堅(jiān);;工程項(xiàng)目合作管理定性指標(biāo)體系的構(gòu)建與分析[J];財(cái)經(jīng)理論與實(shí)踐;2006年03期
相關(guān)博士學(xué)位論文 前1條
1 劉楊;基于SG-MA-ISPA模型的區(qū)域可持續(xù)發(fā)展評(píng)價(jià)研究[D];重慶大學(xué);2012年
相關(guān)碩士學(xué)位論文 前6條
1 屈天鳴;地質(zhì)公園博物館建筑設(shè)計(jì)相關(guān)問(wèn)題研究[D];華中科技大學(xué);2011年
2 張大偉;高墩大跨徑連續(xù)剛構(gòu)橋施工監(jiān)控后評(píng)價(jià)[D];長(zhǎng)安大學(xué);2010年
3 張寶元;天津市文化中心工程建設(shè)項(xiàng)目管理研究[D];天津大學(xué);2010年
4 顧健;福清核電廠項(xiàng)目規(guī)劃期的戰(zhàn)略分析研究[D];上海交通大學(xué);2009年
5 丁小峰;核電項(xiàng)目前期風(fēng)險(xiǎn)管理研究[D];華北電力大學(xué)(北京);2009年
6 張衛(wèi)東;遼寧紅沿河核電項(xiàng)目前期工作分析[D];上海交通大學(xué);2007年
,本文編號(hào):2195081
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/2195081.html