600MW火電機(jī)組模擬量控制系統(tǒng)設(shè)計(jì)和研究
[Abstract]:This paper takes a 2 x600MW thermal power unit as an example to study its analog control system. Based on the conventional control scheme, the detailed optimization design is carried out and realized in the system logic. The principle, control scheme and closed-loop logic of the coordinated control system are analyzed in detail. The combustion control system and steam temperature are also discussed. The control system and feed water control system have been paid more attention to and the key control schemes have been expounded. The specific control loops include load control loops, RB loops, boiler main control loops, turbine main control loops, fuel main control loops and so on. Improvement. Some strategies for controlling the system are given.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TK323;TM621.6
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 趙松烈;賀賢峰;何彥君;丁俊宏;;北侖電廠三期工程DCS設(shè)計(jì)和組態(tài)[J];電力建設(shè);2010年02期
2 段秋剛,張纏保,任建勇,張曉民,楊建軍;提高協(xié)調(diào)控制系統(tǒng)適應(yīng)性的研究[J];山西電力;2002年S1期
3 沈宏偉;虞茂盛;;125MW火電機(jī)組主要模擬量控制系統(tǒng)的設(shè)計(jì)與投運(yùn)[J];發(fā)電設(shè)備;2011年04期
4 陳又申;余正環(huán);孟祖浩;;發(fā)電機(jī)組模擬量控制系統(tǒng)的跟蹤與應(yīng)用[J];寶鋼技術(shù);2013年04期
5 劉麒楠;霍吉良;;電廠分散控制系統(tǒng)的控制通信網(wǎng)絡(luò)[J];河北電力技術(shù);2008年05期
6 周逸寧;方閔;;600MW亞臨界機(jī)組汽溫控制策略的優(yōu)化[J];華東電力;2012年08期
7 韓洛奇;陳振海;;準(zhǔn)能矸電2×330MW循環(huán)流化床CFB鍋爐模擬量控制設(shè)計(jì)特點(diǎn)[J];內(nèi)蒙古科技與經(jīng)濟(jì);2010年08期
8 武翔;;600MW亞臨界機(jī)組協(xié)調(diào)控制優(yōu)化淺析[J];華北電力技術(shù);2013年02期
9 薛志斌,李平;先進(jìn)控制策略在電廠熱工過(guò)程控制中的應(yīng)用[J];青海電力;2000年01期
10 曹文亮,王兵樹(shù),馬進(jìn),高建強(qiáng),馬良玉,馬永光;對(duì)火電廠機(jī)組負(fù)荷優(yōu)化分配算法的研究[J];汽輪機(jī)技術(shù);2004年01期
,本文編號(hào):2177086
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/2177086.html