輸電線路之山火預(yù)警系統(tǒng)設(shè)計研究
[Abstract]:With the development of society, power grid has become an important guarantee for the development of modern society and economic progress. Its coverage is more and more extensive, not only in developed areas, but also in remote mountainous areas with complicated geology and climate. The blackout of line tripping caused by mountain fire also happens from time to time, which brings great hidden trouble to the safe and stable operation of power grid. The purpose of this paper is to study how to apply the mountain fire warning technology to prevent the transmission line tripping from occurring when the transmission line encounters mountain fire disaster. The main work and achievements are as follows: 1. The means and methods of mountain fire early warning are studied, and the design requirements of mountain fire early warning system are determined. Firstly, the mechanism and causes of line tripping caused by mountain fire are analyzed. Secondly, through the case study of mountain fire tripping in Hubei area, it is concluded that the early warning system of mountain fire must have two functions: mountain fire early warning and scene video display. Finally, by analyzing the merits and demerits of different early warning methods, a scheme for early warning of mountain fire by active early warning is proposed. 2. The overall design scheme of mountain fire early warning system is put forward. From the aim and principle of the design scheme of mountain fire early warning system, the composition and working mode of the system are studied. The technical difficulties in the application of the system are analyzed, and the overall design scheme of the early warning system for mountain fire is put forward. The practical application shows that the system can overcome the influence of external environment and realize continuous accurate detection and recognition of mountain fire. Detailed design of the mountain fire warning system each subsystem. The remote network information transmission method based on 4G communication, the power supply principle of the solar power supply subsystem, the system structure of the central online video surveillance subsystem and the central software management subsystem are studied in this paper. Through the use of fire location technology to collect fire source information to confirm the mountain fire, using 4G technology to transmit data, solar power technology to power all-weather power, DLP large screen wall and based on distributed sensor centralized information processing monitoring system, The design of each subsystem is completed. Finally, it shows that the design scheme can realize the all-weather warning of the fire around the line, which provides the data basis for the operation of the line.
【學位授予單位】:湖北工業(yè)大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:TM75
【參考文獻】
相關(guān)期刊論文 前10條
1 張臻;張琛;;基于紅外探測器的輸電線路山火監(jiān)測方案[J];江蘇電機工程;2016年03期
2 宋蟄存;陳寧;李迪飛;;ZigBee無線傳感技術(shù)在森林火災(zāi)監(jiān)測中的應(yīng)用[J];自動化儀表;2011年04期
3 李勇;陶雄俊;陳立;;輸電線路山火故障分析及預(yù)防[J];湖北電力;2010年06期
4 郭明軍;;高壓輸電線路搶修施工方法[J];河南科技;2010年22期
5 王浩東;;輸電線路山火跳閘原因分析及對策[J];廣西電力;2009年04期
6 宋曉紅;;DLP大屏幕在電子會議系統(tǒng)的應(yīng)用[J];智能建筑與城市信息;2009年06期
7 宋雅靜;張學東;許敏;;輸電線路實施狀態(tài)巡視探討[J];山西電力;2009年01期
8 李冬花;;軟件開發(fā)項目技術(shù)風險預(yù)警機制研究[J];科技創(chuàng)業(yè)月刊;2008年08期
9 趙軍,李新國,陳雁;太陽能熱發(fā)電技術(shù)及其在我國的應(yīng)用前景[J];太陽能;2005年04期
10 李安伏;基于4G的移動通信系統(tǒng)關(guān)鍵技術(shù)初探[J];自動化博覽;2005年02期
相關(guān)會議論文 前1條
1 王永;;如何做好輸電線路山火防范及應(yīng)急處置[A];2010年云南電力技術(shù)論壇論文集(文摘部分)[C];2010年
相關(guān)博士學位論文 前3條
1 李麗芬;基于無線傳感網(wǎng)絡(luò)的輸電線路狀態(tài)監(jiān)測數(shù)據(jù)傳輸?shù)难芯縖D];華北電力大學;2013年
2 徐子利;同塔多回輸電線路瞬時性故障的故障分析與故障測距[D];華南理工大學;2012年
3 邱崧;基于LED光源的DLP投影系統(tǒng)的研究[D];華東師范大學;2007年
相關(guān)碩士學位論文 前1條
1 屈碧香;基于RGB三色LED光源照明的DLP投影系統(tǒng)光路設(shè)計[D];浙江大學;2013年
,本文編號:2266776
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2266776.html