大型火電廠接入特高壓電網(wǎng)電氣主接線方案研究
本文選題:火電廠 切入點(diǎn):特高壓電網(wǎng) 出處:《華北電力大學(xué)(北京)》2016年碩士論文 論文類型:學(xué)位論文
【摘要】:近些年來(lái),隨著國(guó)家經(jīng)濟(jì)建設(shè)的飛速增長(zhǎng),我國(guó)特高壓電網(wǎng)發(fā)展速度不斷加快。為響應(yīng)國(guó)家煤電一體化,走能源綜合發(fā)展和可持續(xù)發(fā)展道路,各大發(fā)電公司火電廠都在積極研究接入特高壓電網(wǎng)的技術(shù)。從減少升壓環(huán)節(jié)、降低線路阻抗、節(jié)約工程及土地投資方面,發(fā)揮特高壓技術(shù)優(yōu)勢(shì)。構(gòu)建強(qiáng)有力的特高壓電網(wǎng),對(duì)于加快我國(guó)能源基地資源的優(yōu)化配置及集約化開(kāi)發(fā)具有十分重要的現(xiàn)實(shí)意義,同時(shí)符合國(guó)家能源發(fā)展戰(zhàn)略,形成煤電循環(huán)經(jīng)濟(jì)產(chǎn)業(yè)鏈條,大規(guī)模地實(shí)現(xiàn)煤碳就地轉(zhuǎn)化,實(shí)現(xiàn)能源綜合利用。形成我國(guó)西部地區(qū)大型煤電一體化基地,能夠保證能源的安全、節(jié)約利用,達(dá)到煤、電之間的效益平衡,是集經(jīng)濟(jì)效益、社會(huì)效益、生態(tài)效益于一體的工程。本論文通過(guò)對(duì)國(guó)內(nèi)外特高壓接入電網(wǎng)技術(shù)應(yīng)用情況的研究,從綜合安全性、經(jīng)濟(jì)性和可靠性三個(gè)指標(biāo)來(lái)衡量了采用特高壓輸電的優(yōu)勢(shì),并對(duì)國(guó)內(nèi)外發(fā)電廠的電氣主接線及變電站設(shè)計(jì)實(shí)踐經(jīng)驗(yàn)對(duì)比分析,強(qiáng)調(diào)在特高壓等級(jí)的變電站中,應(yīng)優(yōu)選安全可靠、運(yùn)行操作有把握的主接線方式。通過(guò)對(duì)內(nèi)蒙古電網(wǎng)和錫林郭勒盟多倫縣特高壓變電站及勝利電廠接入特高壓站的必要性進(jìn)行了分析。在選擇接入系統(tǒng)電壓等級(jí)時(shí),特別是考慮電廠的規(guī)模、容量、輸電距離,認(rèn)為該工程將對(duì)滿足京津唐電網(wǎng)負(fù)荷增長(zhǎng)的需要,提高供電可靠性和電能質(zhì)量有著積極作用。本論文通過(guò)對(duì)大電源基地火電廠接入特高壓電網(wǎng)的幾種可選方案進(jìn)行計(jì)算、分析、論證,結(jié)合輸電距離、送電容量、可靠性、技術(shù)經(jīng)濟(jì)性、穩(wěn)定性等方面內(nèi)容,對(duì)一次升壓、二次升壓方式的憂劣性進(jìn)行了對(duì)比,并結(jié)合原始資料的分析,提出了電廠升壓方案。同時(shí)對(duì)相應(yīng)方案進(jìn)行了可靠性、靈活性、經(jīng)濟(jì)性分析及討論,確定了合理方案,為該火電廠接入特高壓電網(wǎng)的電氣主接線方案設(shè)計(jì)提供技術(shù)參考。
[Abstract]:In recent years, with the rapid growth of national economic construction, the development of UHV power grid in China has been accelerating. In response to the integration of national coal and electricity, we have taken the road of comprehensive energy development and sustainable development. All the major power plants are actively studying the technology of connecting to the UHV power grid. In terms of reducing boost links, reducing line impedance, saving engineering and land investment, UHV technical advantages are brought into play, and a powerful UHV power grid is constructed. It is of great practical significance to accelerate the optimal allocation and intensive exploitation of energy base resources in China. At the same time, it accords with the national energy development strategy, forms the industrial chain of coal and electricity recycling economy, and realizes the local conversion of coal on a large scale. To realize the comprehensive utilization of energy and to form a large coal-power integration base in the western region of China can ensure the safety of energy, economize the utilization of energy, achieve a balance of benefits between coal and electricity, and it is a combination of economic and social benefits. Based on the research on the application of UHV access technology at home and abroad, this paper measures the advantages of UHV transmission from the three indexes of comprehensive security, economy and reliability. By comparing and analyzing the practical experience of electric main wiring and substation design in domestic and foreign power plants, it is emphasized that the optimal selection should be safe and reliable in the UHV grade substation. Through the analysis of the necessity of connecting UHV substation and Shengli Power Plant to UHV station in Inner Mongolia Power Grid and Xilinguolermeng County and Shengli Power Plant, when selecting the voltage grade of access system, In particular, considering the scale, capacity and transmission distance of the power plant, it is considered that the project will meet the needs of the load growth of the Beijing-Tianjin-Tangshan power network. Improving the reliability and quality of power supply plays a positive role. This paper calculates, analyzes, demonstrates, combines transmission distance, transmission capacity, reliability of several alternative schemes for connecting power plants to UHV power networks based on large power supply bases. In terms of technical economy and stability, this paper compares the worrisome characteristics of primary boost and secondary boost, and puts forward a power plant boost scheme combining with the analysis of original data. At the same time, the reliability and flexibility of the corresponding scheme are given. Economic analysis and discussion, a reasonable scheme is determined, which provides a technical reference for the design of the main electrical connection scheme of the thermal power plant connected to the UHV power network.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2016
【分類號(hào)】:TM621
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 金明成;劉繼成;;建設(shè)特高壓電網(wǎng)的必要性[J];東北電力技術(shù);2006年12期
2 郭志江;;淺析建設(shè)特高壓電網(wǎng)對(duì)我國(guó)電力市場(chǎng)化改革的推動(dòng)作用[J];黑龍江科技信息;2008年09期
3 本刊編輯部;;中國(guó)首次掌握特高壓電網(wǎng)施工工藝[J];華北電力技術(shù);2009年03期
4 方新利;劉旭宇;劉兵;;淺談我國(guó)特高壓電網(wǎng)建設(shè)的難題和意義[J];中國(guó)市場(chǎng);2011年19期
5 舒印彪;積極推進(jìn)特高壓電網(wǎng)建設(shè)——關(guān)于發(fā)展特高壓電網(wǎng)的前期論證與示范工程[J];中國(guó)電力企業(yè)管理;2005年07期
6 黃澄夏;中國(guó)大力發(fā)展特高壓電網(wǎng)[J];大眾用電;2005年11期
7 陳吟;構(gòu)建特高壓電網(wǎng)誘人的蛋糕屬于誰(shuí)[J];電器工業(yè);2005年05期
8 呂道斌;;四川水電的根本出路在于特高壓電網(wǎng)[J];四川水力發(fā)電;2006年03期
9 張娟;田慧云;;特高壓電網(wǎng)人才的培養(yǎng)途徑和實(shí)施建議[J];中國(guó)電力教育;2006年02期
10 吳玉生;;把握科技發(fā)展規(guī)律,推動(dòng)特高壓電網(wǎng)建設(shè)[J];中國(guó)改革;2006年08期
相關(guān)會(huì)議論文 前1條
1 陳迅;;特高壓電網(wǎng)分析[A];第十屆中國(guó)科協(xié)年會(huì)環(huán)境保護(hù)與生態(tài)文明建設(shè)論壇論文集[C];2008年
相關(guān)重要報(bào)紙文章 前10條
1 記者 周國(guó)洪 蔡玉高;“大規(guī)模建設(shè)特高壓電網(wǎng)的條件已具備”[N];新華每日電訊;2013年
2 主持人 許鵬;呼吁加快建設(shè)特高壓電網(wǎng)[N];國(guó)家電網(wǎng)報(bào);2013年
3 川報(bào)集團(tuán)特派記者 鐘振宇 王小玲;建特高壓電網(wǎng)破水電外送難題[N];四川日?qǐng)?bào);2013年
4 本報(bào)記者 郭釔杉;讓特高壓電網(wǎng)輸送更多清潔能源[N];中華工商時(shí)報(bào);2013年
5 CUBN記者 周洪博;特高壓電網(wǎng)建設(shè)將引爆設(shè)備市場(chǎng)需求[N];中國(guó)聯(lián)合商報(bào);2013年
6 記者 賀輝 通訊員 龐彥娟 秦梁棟;特高壓電網(wǎng)有望落地河北[N];國(guó)家電網(wǎng)報(bào);2013年
7 記者張佳寧 侯婷 林海宇;17所高校160名學(xué)子喜獲首屆特高壓電網(wǎng)獎(jiǎng)學(xué)金[N];國(guó)家電網(wǎng)報(bào);2014年
8 記者 瞿劍 胡左 魏東;特高壓電網(wǎng)建設(shè)提速:“兩交一直”同時(shí)開(kāi)工[N];科技日?qǐng)?bào);2014年
9 本報(bào)記者 路鄭;特高壓電網(wǎng)設(shè)備勝任治霾形勢(shì)[N];中國(guó)能源報(bào);2014年
10 丁功揚(yáng);對(duì)特高壓電網(wǎng)規(guī)劃思路的看法[N];中國(guó)經(jīng)濟(jì)導(dǎo)報(bào);2005年
相關(guān)博士學(xué)位論文 前2條
1 黃涌;特高壓電網(wǎng)區(qū)間容量交換能力評(píng)估方法的研究[D];武漢大學(xué);2013年
2 杜至剛;中國(guó)特高壓電網(wǎng)發(fā)展戰(zhàn)略規(guī)劃研究[D];山東大學(xué);2008年
相關(guān)碩士學(xué)位論文 前7條
1 劉林;大型火電廠接入特高壓電網(wǎng)電氣主接線方案研究[D];華北電力大學(xué)(北京);2016年
2 譚清坤;特高壓電網(wǎng)潛在效應(yīng)分析與綜合評(píng)價(jià)模型[D];華北電力大學(xué)(北京);2016年
3 王兆權(quán);特高壓電網(wǎng)規(guī)劃環(huán)境影響評(píng)價(jià)及風(fēng)險(xiǎn)防范研究[D];華北電力大學(xué);2015年
4 于超;特高壓電網(wǎng)參數(shù)及地磁感應(yīng)電流評(píng)估算法研究[D];華北電力大學(xué)(北京);2008年
5 劉飛璇;SVC對(duì)交流特高壓電網(wǎng)電壓穩(wěn)定性的應(yīng)用研究[D];山東大學(xué);2015年
6 葛海洋;特高壓電網(wǎng)GIC水平計(jì)算及災(zāi)害風(fēng)險(xiǎn)估測(cè)[D];華北電力大學(xué);2012年
7 丁健;直接接入特高壓電網(wǎng)的百萬(wàn)千瓦機(jī)組電氣二次設(shè)計(jì)[D];華北電力大學(xué);2014年
,本文編號(hào):1585157
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/1585157.html