懸臂施工箱梁橋空間效應(yīng)及腹板應(yīng)力狀態(tài)的精細(xì)化分析
[Abstract]:In the design and analysis of prestressed concrete box girder bridge, the plane bar system calculation model is mainly used at present, which can not reflect the characteristics of spatial force and local force. Although the large-scale general structural analysis program (such as ANSYS, etc.) with solid element has the characteristics of powerful function and strong generality, it is difficult to complete the simulation calculation of prestress, live load and concrete shrinkage and creep if the prestressed concrete bridge is analyzed without secondary development. In view of this situation, Jiangsu Traffic Planning and Design Institute has developed the Prestressed concrete Box girder Fine numerical Simulation system (RNAS-PCBB) for many years, which can carry out the fine analysis of the solid element of the prestressed concrete bridge. Based on the core principle and application practice of "Prestressed concrete Box girder refinement numerical Simulation system", this paper expounds the selection of the constitutive model of concrete and steel bar in the analysis of prestressed concrete box girder bridge, and discusses the simulation method of preloading force in three-dimensional solid finite element model by using ANSYS and the three-dimensional solid modeling method of prestressed concrete box girder bridge. In this paper, the prestressed concrete box girder bridge is taken as the analysis object, combined with an engineering example, the spatial analysis model of the whole bridge is established, and the stress state analysis of the key parts is carried out considering the load condition of the three-way prestress. The shear lag effect of different cross sections along the longitudinal direction of the bridge is discussed. Considering the eccentricity of lane load in the model, the law of live load normal stress bias coefficient along the longitudinal bridge direction is considered. At the same time, the relationship between web beam distribution and stress distribution is analyzed, and the important role of web vertical prestress and downward bending beam in reducing the main tensile stress of web is pointed out. Finally, the local stress distribution of the bottom plate and the tooth plate under the action of prestress is studied, and the structural design measures to prevent the cracking of the bottom plate and the tooth plate in the process of construction and use are put forward. The research results have good application reference value for guiding the design of prestressed concrete beam bridge.
【學(xué)位授予單位】:東南大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:U441.5;U448.213
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 馬積薪,李育湘;曲線箱梁橋[J];國(guó)外橋梁;1989年04期
2 李新平,任華;曲線箱梁橋預(yù)應(yīng)力作用的仿真分析[J];華南理工大學(xué)學(xué)報(bào)(自然科學(xué)版);2004年12期
3 馬智永,俞曉華,楊向華;考慮偏心支承影響的兩跨60度彎箱梁橋位移分析[J];河南科學(xué);2005年06期
4 謝旭,黃劍源;曲線箱梁橋結(jié)構(gòu)分析的一種有限元計(jì)算方法[J];土木工程學(xué)報(bào);2005年02期
5 賈燕;管巧燕;王東煒;;偏心支承對(duì)兩跨60°彎箱梁橋支承反力的影響[J];公路與汽運(yùn);2007年05期
6 賈燕;王東煒;;偏心支承對(duì)雙跨彎箱梁橋受力性能的影響[J];公路交通科技(應(yīng)用技術(shù)版);2007年09期
7 高小華;林新元;牛平霞;;箱梁超方調(diào)查研究[J];山西建筑;2010年26期
8 熊雪明;;鋼筋混凝土連續(xù)彎箱梁橋設(shè)計(jì)實(shí)例[J];城市道橋與防洪;2011年04期
9 宋國(guó)華;霍達(dá);羅玲;王東煒;;非線性函數(shù)法研究曲率對(duì)彎箱梁橋的影響[J];鐵道建筑;2011年12期
10 邱欣;;彎箱梁橋扭轉(zhuǎn)偏移治理技術(shù)研究[J];天津建設(shè)科技;2011年06期
相關(guān)會(huì)議論文 前10條
1 徐升橋;邱漸根;;預(yù)應(yīng)力混凝土曲線箱梁橋的計(jì)算機(jī)輔助設(shè)計(jì)[A];中國(guó)土木工程學(xué)會(huì)第七屆年會(huì)暨茅以升誕辰100周年紀(jì)念會(huì)論文集[C];1995年
2 彭大文;王忠;曾超;;連續(xù)剛構(gòu)彎箱梁的模型試驗(yàn)研究[A];中國(guó)土木工程學(xué)會(huì)橋梁及結(jié)構(gòu)工程學(xué)會(huì)第十三屆年會(huì)論文集(下冊(cè))[C];1998年
3 陳昀明;彭大文;;連續(xù)剛構(gòu)彎箱梁橋動(dòng)力分析[A];第九屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅱ卷[C];2000年
4 許俊德;杜麗;;用修正偏壓法求箱梁活載偏載系數(shù)[A];全國(guó)城市公路學(xué)會(huì)第十五屆(2006)學(xué)術(shù)年會(huì)論文集[C];2006年
5 劉釗;王斌;孟少平;紀(jì)誠(chéng);張宇峰;;連續(xù)分叉曲線箱梁橋的計(jì)算分析與設(shè)計(jì)探討[A];新世紀(jì)預(yù)應(yīng)力技術(shù)創(chuàng)新學(xué)術(shù)交流會(huì)論文集[C];2002年
6 劉蕓欣;虞顏;;鋼筋混凝土連續(xù)曲線箱梁受力與裂縫機(jī)理研究[A];第十六屆全國(guó)橋梁學(xué)術(shù)會(huì)議論文集(上冊(cè))[C];2004年
7 李平;呂福生;;分叉式組合結(jié)構(gòu)箱梁橋設(shè)計(jì)和試驗(yàn)分析[A];中國(guó)土木工程學(xué)會(huì)橋梁及結(jié)構(gòu)工程學(xué)會(huì)第十二屆年會(huì)論文集(下冊(cè))[C];1996年
8 韓皓;曹勁松;石志源;;曲線箱梁橋空間分析[A];中國(guó)土木工程學(xué)會(huì)橋梁及結(jié)構(gòu)工程學(xué)會(huì)第十三屆年會(huì)論文集(上冊(cè))[C];1998年
9 呂建鳴;;彎箱梁橋三維實(shí)體有限單元分析[A];中國(guó)公路學(xué)會(huì)橋梁和結(jié)構(gòu)工程學(xué)會(huì)2001年橋梁學(xué)術(shù)討論會(huì)論文集[C];2001年
10 倪順龍;;寬體預(yù)應(yīng)力混凝土連續(xù)箱梁的設(shè)計(jì)與施工[A];第十屆全國(guó)混凝土及預(yù)應(yīng)力混凝土學(xué)術(shù)交流會(huì)論文集[C];1998年
相關(guān)重要報(bào)紙文章 前3條
1 馮欣楠 王勇斌;一冶鋼構(gòu)擔(dān)綱全國(guó)同業(yè)頂尖之師[N];長(zhǎng)江日?qǐng)?bào);2011年
2 本報(bào)記者 朱新國(guó);最快鐵路上的蘇州速度[N];蘇州日?qǐng)?bào);2009年
3 張柱明;箱梁施工工藝及通病淺析[N];駐馬店日?qǐng)?bào);2006年
相關(guān)博士學(xué)位論文 前9條
1 吳再新;大跨度組合體系箱梁的計(jì)算理論及其應(yīng)用研究[D];中南大學(xué);2007年
2 龍佩恒;預(yù)應(yīng)力混凝土箱梁橋開裂的數(shù)值分析方法[D];同濟(jì)大學(xué);2005年
3 郝憲武;裝配式箱梁橋整體化層作用機(jī)理及其設(shè)計(jì)加固方法[D];長(zhǎng)安大學(xué);2012年
4 楊萬里;簡(jiǎn)支連續(xù)預(yù)應(yīng)力混凝土多箱式橋梁全過程受力性能研究[D];浙江大學(xué);2008年
5 王毅;預(yù)應(yīng)力混凝土連續(xù)箱梁溫度作用的觀測(cè)與分析研究[D];東南大學(xué);2006年
6 甘亞南;考慮剪力滯效應(yīng)的薄壁梁靜動(dòng)力特性分析[D];哈爾濱工業(yè)大學(xué);2008年
7 羅旗幟;基于能量原理的薄壁箱梁剪力滯理論與試驗(yàn)研究[D];湖南大學(xué);2005年
8 張文學(xué);預(yù)應(yīng)力混凝土連續(xù)箱梁局部應(yīng)力分析及拉—壓桿設(shè)計(jì)[D];同濟(jì)大學(xué);2007年
9 秦緒喜;基于辛彈性力學(xué)的寬翼板T梁及箱梁剪力滯理論[D];吉林大學(xué);2009年
相關(guān)碩士學(xué)位論文 前10條
1 郭yN;城市預(yù)應(yīng)力混凝土連續(xù)寬箱梁橋設(shè)計(jì)參數(shù)優(yōu)化研究[D];北京建筑大學(xué);2015年
2 周建華;大跨度鋼箱系桿拱橋溫度場(chǎng)研究與預(yù)測(cè)[D];華南理工大學(xué);2015年
3 鬲鵬飛;裝配式箱梁橋整體化層合理厚度分析[D];長(zhǎng)安大學(xué);2015年
4 王小冬;裝配式小箱梁拼寬效應(yīng)精細(xì)化分析[D];長(zhǎng)安大學(xué);2015年
5 胡文哲;粘貼加固混凝土彎箱梁橋的方案比選及優(yōu)化研究[D];長(zhǎng)安大學(xué);2015年
6 李酉勇;PC箱梁橋斜截面空間應(yīng)力精細(xì)化分析與配筋研究[D];哈爾濱工業(yè)大學(xué);2015年
7 劉興;預(yù)應(yīng)力混凝土箱梁橋力學(xué)性能分析[D];鄭州大學(xué);2014年
8 鄭浩楠;鋼箱梁制造與拼裝關(guān)鍵技術(shù)問題研究[D];華南理工大學(xué);2015年
9 譚鵬;曲線寬箱梁橋的力學(xué)性能研究[D];中南林業(yè)科技大學(xué);2015年
10 栗碩;預(yù)應(yīng)力混凝土斜交箱梁橋的畸變效應(yīng)分析[D];石家莊鐵道大學(xué);2015年
,本文編號(hào):2512137
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2512137.html