復合地層中淺埋盾構隧道開挖引起的地層位移及應力預測分析
[Abstract]:In order to reveal the displacement and stress caused by shallow shield tunnel excavation in composite strata, based on the layer method, the problem is equivalent to solving the displacement and stress distribution problem of homogeneous strata, and the modified formula of Loganathan is combined with the modified formula. The expressions of displacement, strain and stress components caused by shallow shield tunnel excavation in composite strata are derived, and the prediction model of formation displacement field distribution is constructed. At the same time, based on the theoretical prediction model, the difference between the predicted displacement of engineering examples and the measured data is compared and analyzed, and the effects of elastic modulus ratio n, formation depth z and soil Poisson's ratio 渭 on tunnel excavation are discussed. In this paper, the concept of equivalent thickness K of weak interlayer is put forward when analyzing the excavation problem of tunnel with weak interlayer. The results show that the maximum subsidence value of Smax, decreases with the increase of n, and the maximum subsidence value of the formation increases with the increase of z, and the maximum horizontal stress and vertical stress of the surface decrease with the increase of z, and the maximum subsidence value of the formation increases with the increase of z, and the maximum settlement value of the formation increases with the increase of z. With the increase of 渭, Smax decreases, the maximum values of additional horizontal tensile stress 蟽 x and vertical stress 蟽 z increase, and Smax increases with the increase of equivalent thickness K of weak interlayer. During tunnel construction, displacement and stress diffusion occur in the upper and lower soft strata, and displacement and stress concentration occur in the upper and lower soft strata.
【作者單位】: 中南大學土木工程學院;中南大學高速鐵路建造技術國家工程試驗室;
【基金】:國家自然科學基金資助項目(51578550,51538009) 中南大學研究生自主探索創(chuàng)新項目(2017zzts153)
【分類號】:U455.43
【相似文獻】
相關期刊論文 前10條
1 吳學鋒;;土巖復合地層拱蓋法施工三維有限元數值模擬[J];城市軌道交通研究;2012年08期
2 范學義;;上軟下硬復合地層中豎井圍護結構設計概述[J];地下工程與隧道;2011年04期
3 趙俊;甘鵬路;申文明;劉維;;復合地層中基坑開挖對下臥隧道變形影響研究[J];隧道建設;2014年02期
4 李婕;吳起星;;廣州地區(qū)軟硬復合地層盾構施工技術研究[J];廣州建筑;2014年03期
5 凌波;李飛;;復合地層掘進中泥水盾構中心刀具改造[J];建筑機械化;2012年04期
6 江招勝;黃威然;竺維彬;;復合地層隧道盾構掘進機的改造[J];廣東建材;2006年03期
7 鞠世健;竺維彬;;復合地層盾構隧道工程地質勘察方法的研究[J];隧道建設;2007年06期
8 王南海;王吉兵;;水下挖孔灌注樁施工技術在復合地層中的應用[J];橋梁建設;2012年S1期
9 張良輝;廣州復合地層中盾構施工技術難點及應對措施[J];施工技術;2005年06期
10 宋天田;杜衡;徐靜松;;復合地層中盾構盤形滾刀偏磨機理研究[J];隧道建設;2009年S1期
相關會議論文 前7條
1 李翔;;淺談盾構機在復合地層掘進刀具損壞的現(xiàn)象及判斷[A];第二屆隧道掘進機(盾構、TBM)專業(yè)委員會第一次學術研討會暨中鐵隧道集團城市盾構項目管理、施工技術、設備維保交流會論文集[C];2011年
2 竺維彬;黃威然;孟慶彪;洪勇;;復合地層盾構工程控制鉆爆巖體創(chuàng)新技術研究[A];第十五屆粵、京、港、滬鐵道學會學術年會第八屆世界軌道交通發(fā)展研究會年會論文集[C];2011年
3 施鴻蒙;薛城;;南京巖土復合地層盾構掘進施工技術研究[A];施工機械化新技術交流會論文集(第十一輯)[C];2010年
4 楊紅軍;;廣州地鐵復合地層盾構法隧道快速施工技術、管理[A];第二屆隧道掘進機(盾構、TBM)專業(yè)委員會第一次學術研討會暨中鐵隧道集團城市盾構項目管理、施工技術、設備維保交流會論文集[C];2011年
5 衛(wèi)俊杰;周松;黃醒春;;復合地層盾構施工土體分層沉降原位試驗研究[A];第六屆全國土木工程研究生學術論壇論文集[C];2008年
6 商嘯e,
本文編號:2482585
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2482585.html