張家界大峽谷玻璃橋基礎(chǔ)設(shè)計(jì)
發(fā)布時(shí)間:2019-05-11 03:44
【摘要】:張家界大峽谷玻璃橋是一座主纜跨度430m的空間索面人行懸索橋。橋址位于喀斯特巖溶地貌區(qū)域,針對(duì)橋位處特殊的地形地貌和地質(zhì)情況,東側(cè)錨碇采用重力式錨,基礎(chǔ)為明挖擴(kuò)大基礎(chǔ)(東南側(cè)采用矩形擴(kuò)大基礎(chǔ),東北側(cè)采用階梯式擴(kuò)大基礎(chǔ));西側(cè)錨碇采用錨塞體截面線性變化的隧道式錨,錨塞體長(zhǎng)度為13.5m。橋塔塔柱均為圓環(huán)形鋼筋混凝土獨(dú)柱結(jié)構(gòu),每根塔柱均采用4根直徑1.2m的人工挖孔灌注樁基礎(chǔ)。橋墩采用樁柱式帶蓋梁的框架墩結(jié)構(gòu),每個(gè)墩柱下為直徑1.5m的挖孔灌注樁。
[Abstract]:Zhangjiajie Grand Canyon Glass Bridge is a space cable pedestrian suspension bridge with a span of 430m. The bridge site is located in the Karst geomorphological area. In view of the special topographic, geomorphological and geological conditions at the bridge site, the gravity anchor is used in the east Anchorage, which is based on open excavation and expansion foundation (rectangular expansion foundation is used in the southeast side). On the northeast side, the stepped expansion foundation is adopted); The west side Anchorage adopts tunnel anchor with linear variation of anchor plug section, and the length of anchor plug body is 13.5 m. The tower columns of the bridge are circular reinforced concrete single column structures, and four artificial excavated cast-in-place pile foundations with a diameter of 1.2 m are used in each tower column. The pier adopts pile-column frame pier structure with cover beam, and each pier column is an excavated cast-in-place pile with a diameter of 1.5 m.
【作者單位】: 中鐵大橋勘測(cè)設(shè)計(jì)院集團(tuán)有限公司;
【分類號(hào)】:U448.25
[Abstract]:Zhangjiajie Grand Canyon Glass Bridge is a space cable pedestrian suspension bridge with a span of 430m. The bridge site is located in the Karst geomorphological area. In view of the special topographic, geomorphological and geological conditions at the bridge site, the gravity anchor is used in the east Anchorage, which is based on open excavation and expansion foundation (rectangular expansion foundation is used in the southeast side). On the northeast side, the stepped expansion foundation is adopted); The west side Anchorage adopts tunnel anchor with linear variation of anchor plug section, and the length of anchor plug body is 13.5 m. The tower columns of the bridge are circular reinforced concrete single column structures, and four artificial excavated cast-in-place pile foundations with a diameter of 1.2 m are used in each tower column. The pier adopts pile-column frame pier structure with cover beam, and each pier column is an excavated cast-in-place pile with a diameter of 1.5 m.
【作者單位】: 中鐵大橋勘測(cè)設(shè)計(jì)院集團(tuán)有限公司;
【分類號(hào)】:U448.25
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 雷志輝;國道214線角籠壩大橋錨碇工程施工技術(shù)[J];世界橋梁;2005年02期
2 李家平,張子新,黃宏偉,李永盛;寧波慶豐大橋錨碇室內(nèi)相似模型試驗(yàn)研究[J];同濟(jì)大學(xué)學(xué)報(bào)(自然科學(xué)版);2005年08期
3 王宗仁,王崇旭,莊值政,謝明;四渡河橋隧道式錨碇開挖支護(hù)工藝[J];施工技術(shù);2005年S1期
4 劉子振;王長(zhǎng)征;言志信;;樁臺(tái)式錨碇設(shè)計(jì)優(yōu)化及應(yīng)用[J];森林工程;2006年03期
5 張少軍;;陽邏長(zhǎng)江公路大橋南錨碇基礎(chǔ)工程建設(shè)關(guān)鍵技術(shù)[J];世界橋梁;2006年02期
6 廖新;;大體積錨碇開挖施工探討[J];科技咨詢導(dǎo)報(bào);2007年28期
7 白雪o,