大跨預(yù)應(yīng)力混凝土連續(xù)梁橋懸臂施工結(jié)構(gòu)控制分析
[Abstract]:In order to provide theoretical basis for construction control and guide the design and construction of long-span prestressed concrete continuous beam bridge, this paper studies the shape and force of long-span prestressed concrete continuous beam bridge cantilever construction. Methods the stress state and deformation characteristics of cantilever construction of long span prestressed reinforced concrete continuous bridge were simulated and analyzed, and the stress state and deformation of each construction stage of bridge structure were obtained. The bridge model was established by using TDV software. The structure control analysis of bridge construction process is carried out by means of forward loading analysis, reverse loading analysis and non-stress state analysis respectively. Results the deformation and stress state of the bridge structure in each construction stage and their changing rules were simulated and analyzed, so as to ensure that the line shape and force condition of the completed bridge accord with the design requirements. Conclusion according to the principle of structural control and the characteristics of simulation analysis data, the forward loading analysis method is suitable for the calculation of structural stress in the construction process, and the inverted assembly analysis method is suitable for the determination of the standard height of the vertical formwork in the construction process. The stress-free state analysis method is suitable for predicting the structural stress and linearity in the bridge-forming state.
【作者單位】: 沈陽(yáng)建筑大學(xué)交通工程學(xué)院;國(guó)網(wǎng)遼寧省電力有限公司遼陽(yáng)供電公司;
【基金】:國(guó)家自然科學(xué)基金項(xiàng)目(51178279) 住房和城鄉(xiāng)建設(shè)部項(xiàng)目(2015-K5-021)
【分類號(hào)】:U445.4
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 孟亞武;;有關(guān)預(yù)應(yīng)力混凝土連續(xù)梁懸臂施工技術(shù)的探究[J];交通世界(建養(yǎng).機(jī)械);2012年11期
2 孫金,熊非,郭琦;現(xiàn)澆懸臂施工預(yù)應(yīng)力混凝土連續(xù)梁的合攏及力學(xué)淺析[J];交通標(biāo)準(zhǔn)化;2005年09期
3 李永清;連續(xù)橋梁懸臂施工的幾個(gè)關(guān)鍵問(wèn)題探討[J];西部探礦工程;2005年02期
4 王文耀;;對(duì)懸臂施工連續(xù)橋梁中的問(wèn)題分析及探討[J];廣東科技;2008年12期
5 侯曉晶;馬麗娜;張戎令;;砼容重對(duì)橋梁懸臂施工撓度的影響研究[J];科技資訊;2010年36期
6 張新星;;淺談?lì)A(yù)應(yīng)力混凝土連續(xù)剛橋的懸臂施工控制[J];中國(guó)新技術(shù)新產(chǎn)品;2011年04期
7 左印娟;王輝;;談橋梁懸臂施工方法[J];民營(yíng)科技;2012年07期
8 寧建根;柯賽華;;連續(xù)剛構(gòu)橋懸臂施工系統(tǒng)參數(shù)敏感性分析[J];交通科技;2012年S1期
9 許志強(qiáng);賀艷麗;李劍;;青島益佳碼頭大橋預(yù)應(yīng)力混凝土連續(xù)梁懸臂施工[J];山西建筑;2012年32期
10 張力;;預(yù)應(yīng)力混凝土箱梁懸臂施工現(xiàn)場(chǎng)質(zhì)量控制要點(diǎn)[J];山西建筑;2013年18期
相關(guān)會(huì)議論文 前10條
1 劉長(zhǎng)卿;林煌;;懸臂施工大跨梁橋運(yùn)營(yíng)后持續(xù)撓度優(yōu)化研究[A];結(jié)構(gòu)及多學(xué)科優(yōu)化工程應(yīng)用與理論研討會(huì)’2009(CSMO-2009)論文集[C];2009年
2 寧建根;柯賽華;;連續(xù)剛構(gòu)橋懸臂施工系統(tǒng)參數(shù)敏感性分析[A];全國(guó)城市公路學(xué)會(huì)第二十一次學(xué)術(shù)年會(huì)論文集[C];2012年
3 張煥新;劉剛亮;錢亮;張曄;;270m連續(xù)剛構(gòu)懸臂施工及控制[A];中國(guó)土木工程學(xué)會(huì)橋梁及結(jié)構(gòu)工程學(xué)會(huì)第十二屆年會(huì)論文集(上冊(cè))[C];1996年
4 孫學(xué)先;劉風(fēng)奎;周世軍;;預(yù)應(yīng)力混凝土彎梁橋懸臂施工線型控制[A];第八屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集(第Ⅲ卷)[C];1999年
5 袁愛(ài)民;戴航;吉伯海;聶利英;;高墩連續(xù)剛構(gòu)橋T構(gòu)懸臂施工穩(wěn)定性分析[A];第十八屆全國(guó)橋梁學(xué)術(shù)會(huì)議論文集(下冊(cè))[C];2008年
6 陳艾榮;林志興;項(xiàng)海帆;;懸臂施工中連續(xù)剛架橋的風(fēng)荷載計(jì)算方法[A];'95預(yù)應(yīng)力混凝土連續(xù)梁和剛構(gòu)橋?qū)W術(shù)會(huì)議論文集[C];1995年
7 王鈞利;賀拴海;;高墩大跨徑曲線連續(xù)剛構(gòu)橋懸臂施工階段墩梁位移的非線性分析[A];中國(guó)公路學(xué)會(huì)橋梁和結(jié)構(gòu)工程分會(huì)2005年全國(guó)橋梁學(xué)術(shù)會(huì)議論文集[C];2005年
8 周履;;從幾座已建的橋梁談懸臂施工長(zhǎng)跨度橋梁施工效率問(wèn)題[A];高效預(yù)應(yīng)力混凝土工程實(shí)踐[C];1993年
9 李亮亮;賀拴海;宋一凡;;高墩彎橋懸臂施工狀態(tài)實(shí)用分析[A];中國(guó)公路學(xué)會(huì)橋梁和結(jié)構(gòu)工程學(xué)會(huì)2003年全國(guó)橋梁學(xué)術(shù)會(huì)議論文集[C];2003年
10 劉桂生;;懸臂施工連續(xù)梁橋分階段預(yù)應(yīng)力設(shè)計(jì)[A];第九屆全國(guó)混凝土及預(yù)應(yīng)力混凝土學(xué)術(shù)交流會(huì)論文集[C];1996年
相關(guān)重要報(bào)紙文章 前2條
1 萬(wàn)俊義;蘇通大橋:拉開(kāi)千米跨越大決戰(zhàn)[N];中國(guó)交通報(bào);2007年
2 孔祥文 劉征 武新才;科技,讓高鐵建設(shè)更好更快[N];人民鐵道;2010年
相關(guān)碩士學(xué)位論文 前10條
1 高宇甲;基于材料時(shí)變特性的懸臂梁橋控制[D];華北水利水電大學(xué);2015年
2 劉森;自適應(yīng)懸臂施工控制[D];華北水利水電大學(xué);2015年
3 姬偉業(yè);龍葵路鐵路跨線橋連續(xù)梁懸臂施工控制技術(shù)研究[D];石家莊鐵道大學(xué);2015年
4 蔣小兵;南環(huán)河特大橋50m+3×70m+50m連續(xù)梁懸臂施工控制技術(shù)研究與實(shí)踐[D];石家莊鐵道大學(xué);2014年
5 王超;大跨度連續(xù)橋梁懸臂施工監(jiān)控與風(fēng)荷載效應(yīng)分析[D];蘭州交通大學(xué);2015年
6 張?jiān)椒?大跨度連續(xù)梁懸臂施工期日照溫度引起的應(yīng)力和變形研究[D];北京交通大學(xué);2016年
7 李丹;(48+80+80+48)m連續(xù)梁懸臂施工監(jiān)控技術(shù)研究[D];石家莊鐵道大學(xué);2016年
8 劉從軍;懸臂施工連續(xù)梁橋安全管理研究[D];長(zhǎng)安大學(xué);2016年
9 繆s欀,
本文編號(hào):2440545
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2440545.html