公路機械化施工動態(tài)管理信息化系統(tǒng)研究
[Abstract]:In recent years, highway construction in China has been booming, reaching 130000 km by the end of 2016. In order to ensure the engineering quality, in 2010, the Ministry of Communications put forward the "five modes" of highway construction management: "humanization of development concept, specialization of project management, standardization of engineering construction, informationization of management means, refinement of daily management". In particular, the informationization of management means has developed rapidly in the highway construction in recent years, but the contents of the management information system of the highway construction in various places are very different, and the management projects are not complete. Especially, the dynamic management of construction schedule and construction cost is not well developed. Therefore, the development of practical engineering management information system has a wide range of engineering practical significance. Based on the investigation of the existing management information system and according to the needs of the construction enterprises, this paper develops an information system with the dynamic management function of the construction schedule and cost. First of all, the reasonable selection and configuration of construction machinery for highway asphalt pavement engineering are studied, and the machinery with asphalt mixture mixing station and paver as the main machinery, and other transportation and rolling machinery as the matching cluster, are selected. The model, specification and quantity of the selected machinery are obtained. Secondly, the construction progress and cost budget, project quantity and capital investment management are studied, and the dynamic management mode of construction schedule and cost is determined. Thirdly, based on the software architecture of B / S and database technology, this system is developed by using Visual Studio 2010 with C # language, Win Form,. The system mainly includes system management, construction machinery selection and configuration. The five parts of construction schedule control, construction cost control and system help can realize the dynamic control and mechanical management of the construction schedule and construction cost in the construction process of asphalt concrete pavement.
【學位授予單位】:長安大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:U415.1;TP311.52
【參考文獻】
相關期刊論文 前10條
1 張海龍;康笠;;高速公路項目施工進度影響因素與控制措施[J];中國建材;2016年08期
2 宋蔓蔓;王凱艷;;圖書館期刊管理系統(tǒng)的設計與實現(xiàn)——以河北金融學院圖書館為例[J];中國市場;2015年26期
3 翁春榮;;數(shù)據(jù)庫構建與管理維護[J];開封教育學院學報;2015年06期
4 郭向東;;現(xiàn)代公路施工質(zhì)量控制管理研究[J];科技創(chuàng)新與應用;2013年28期
5 蔡學倫;劉曉宇;;鋼制光輪靜作用壓路機與振動壓路機的特點[J];中國公路;2013年15期
6 范立軍;;對施工機械選擇問題的探討[J];民營科技;2013年05期
7 董海波;;高速公路瀝青混凝土路面機械化施工技術與質(zhì)量控制[J];黑龍江科技信息;2013年05期
8 劉鑫;;施工企業(yè)工程項目成本控制分析[J];科技創(chuàng)新與應用;2012年02期
9 杜鵑;;瀝青路面機械化施工質(zhì)量控制[J];交通世界(建養(yǎng).機械);2011年07期
10 鄧小芳;;公路工程施工進度控制[J];交通世界(建養(yǎng).機械);2011年01期
相關碩士學位論文 前10條
1 趙曉蕾;工程機械應急救援管理系統(tǒng)研究與開發(fā)[D];長安大學;2016年
2 汪青;BIM技術在A項目中成本控制管理及數(shù)據(jù)分析研究[D];華東理工大學;2015年
3 付紅霞;公路工程機械化施工成本管理研究[D];河北工業(yè)大學;2015年
4 張合川;廣南高速公路路面施工質(zhì)量控制技術研究[D];重慶交通大學;2013年
5 王坤;基于工作流的公路工程施工管理信息系統(tǒng)的設計與實現(xiàn)[D];天津大學;2014年
6 袁光輝;高?蒲行畔⒐芾硐到y(tǒng)的設計與實現(xiàn)[D];安徽大學;2013年
7 羅丹婷;高等級瀝青路面機械化施工質(zhì)量管理系統(tǒng)研究[D];長安大學;2010年
8 薛金林;基于Web的施工總承包企業(yè)進度管理系統(tǒng)研究[D];武漢理工大學;2010年
9 王睿;瀝青混凝土路面機械化施工管理[D];長安大學;2009年
10 徐喜平;基于WEBGIS的公路工程施工管理信息系統(tǒng)的設計與開發(fā)[D];長安大學;2007年
,本文編號:2430060
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2430060.html