大型垂直升船機(jī)鋼絲繩組件安裝技術(shù)
[Abstract]:Aiming at the characteristics and difficulties of wire rope assembly installation of large vertical ship lift and the deficiency of traditional installation method, a scientific and practical installation technique and operation method of wire rope assembly for ship lift are put forward. Some technical measures, such as precise location of wire rope exit point, full winding of multi-rope common groove combined with rope winding frame, are adopted to solve the problems of large installation quantity, large rope diameter, narrow construction site, long and short rope common groove winding. The technology has been applied in Jinghong, three Gorges and other ship lift projects, and the effect is remarkable.
【作者單位】: 中國葛洲壩集團(tuán)機(jī)電建設(shè)有限公司;
【分類號】:U642.61
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;世界首座全平衡鋼絲卷揚(yáng)垂直升船機(jī)在閩江水口電站投入試通航[J];水利科技;2005年02期
2 ;2,000噸卷揚(yáng)式垂直升船機(jī)[J];水運(yùn)工程;1976年03期
3 牛智仁;高壩大型濕運(yùn)垂直升船機(jī)的保安和升降平穩(wěn)問題[J];水運(yùn)工程;1992年05期
4 李波;大型垂直升船機(jī)制造成功[J];起重運(yùn)輸機(jī)械;1998年01期
5 ;兩院院士潘家錚副院長在巖灘垂直升船機(jī)新技術(shù)研究及應(yīng)用技術(shù)鑒定會上的講話[J];紅水河;2000年04期
6 禾;我國第一臺垂直升船機(jī)在巖灘樞紐試運(yùn)行成功[J];珠江水運(yùn);2000年04期
7 周貞;清江高壩洲垂直升船機(jī)方案比選[J];水力發(fā)電;2002年03期
8 彭雪松;夾江廠生產(chǎn)的巖灘垂直升船機(jī)獲獎[J];水力發(fā)電;2002年07期
9 龍文;吳偉;;陸水樞紐垂直升船機(jī)下降限位研究[J];長江工程職業(yè)技術(shù)學(xué)院學(xué)報;2005年04期
10 閔朝斌;浮筒式垂直升船機(jī)[J];水運(yùn)工程;2005年03期
相關(guān)會議論文 前5條
1 徐秋生;石端偉;鄒懷武;;基于虛擬樣機(jī)技術(shù)的大型垂直升船機(jī)機(jī)電耦合研究[A];制造業(yè)與未來中國——2002年中國機(jī)械工程學(xué)會年會論文集[C];2002年
2 黃文利;;向家壩水電站一級垂直升船機(jī)設(shè)計[A];水工機(jī)械技術(shù)2008年論文集[C];2007年
3 徐勛倩;吳勝興;殷鵬威;;龍灘垂直升船機(jī)設(shè)計風(fēng)壓的確定[A];第十屆全國結(jié)構(gòu)工程學(xué)術(shù)會議論文集第Ⅰ卷[C];2001年
4 譚守林;;思林水電站500t級垂直升船機(jī)設(shè)計布置[A];水工機(jī)械技術(shù)2008年論文集[C];2007年
5 汪云祥;扈曉雯;;水口水電站2×500t級垂直升船機(jī)總體設(shè)計[A];水工機(jī)械技術(shù)2008年論文集[C];2007年
相關(guān)重要報紙文章 前1條
1 記者 周呈思 通訊員 惠斌;三峽垂直升船機(jī)進(jìn)入全面建設(shè)[N];湖北日報;2013年
,本文編號:2394377
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2394377.html