公路工程新舊估算指標(biāo)對比分析
發(fā)布時間:2018-12-18 14:05
【摘要】:該文通過西藏國道317線崗?fù)兄两_(dá)段某隧道新建工程工可估算編制案例,使用新估算編制辦法及配套指標(biāo)對其進(jìn)行測算,對比新舊估算,分析兩者主要差異,測算及驗(yàn)證新估算指標(biāo)的調(diào)整幅度和指標(biāo)水平的合理性。
[Abstract]:In this paper, a case study on the estimation of a new tunnel built in Jiangda section from Gangtuo to Jiangda section of Tibet National Road 317 is carried out, and the new method and supporting indexes are used to calculate it. The main differences between the two are analyzed by comparing the new and old estimates. Calculate and verify the adjustment range of the new estimate index and the rationality of the index level.
【作者單位】: 中交第二公路勘察設(shè)計(jì)研究院有限公司;
【分類號】:U415.13;U455.1
本文編號:2385956
[Abstract]:In this paper, a case study on the estimation of a new tunnel built in Jiangda section from Gangtuo to Jiangda section of Tibet National Road 317 is carried out, and the new method and supporting indexes are used to calculate it. The main differences between the two are analyzed by comparing the new and old estimates. Calculate and verify the adjustment range of the new estimate index and the rationality of the index level.
【作者單位】: 中交第二公路勘察設(shè)計(jì)研究院有限公司;
【分類號】:U415.13;U455.1
【相似文獻(xiàn)】
相關(guān)期刊論文 前1條
1 杜穩(wěn)平;;估算指標(biāo)的編制程序及有關(guān)問題的探討[J];中國公路;2002年21期