某下承式鋼管拱肋鋼箱梁系桿拱橋拱梁接合部設計
發(fā)布時間:2018-12-17 06:31
【摘要】:某下承式鋼管拱肋鋼箱梁系桿拱橋主橋為不等跨三連拱橋,跨徑布置為(60+136+208+136+60)m。結構體系為墩梁分離、拱梁固結,拱肋由外傾式鋼管主拱和空間曲線的鋼管副拱組成。邊跨60m主梁采用混凝土箱梁,拱跨主梁為鋼箱梁。下部結構采用Y形混凝土橋墩。鋼管拱肋與鋼箱梁連接處采用了一種新型的連接構造形式,在鋼箱梁頂面對應縱腹板及橫隔板的位置熔透焊一個矩形結構,將鋼管拱肋伸入到矩形結構中,拱肋與鋼箱梁通過矩形結構連接成整體,內力通過矩形結構順利傳遞。利用有限元程序ANSYS建立拱梁接合部局部模型進行分析,結果表明,整體受力性能良好、傳力可靠,是一種合理的構造設計。
[Abstract]:The main bridge of a through steel box girder arch bridge with steel arch rib is three continuous arch bridge with unequal span, and the span arrangement is (60 136 208 136 60) m. The structure system is composed of pier-beam separation, arch beam consolidation, arch rib is composed of extroverted steel pipe main arch and space curve steel pipe auxiliary arch. The side span 60 m main girder adopts concrete box girder, and the arch span main girder is steel box girder. The lower structure adopts Y-shaped concrete pier. A new type of connection structure is adopted in the connection between steel pipe arch rib and steel box girder. The steel tube arch rib is inserted into the rectangular structure by melting through a rectangular structure at the position corresponding to the longitudinal web and transverse diaphragm on the top surface of the steel box girder. Arch rib and steel box girder are connected as a whole through rectangular structure, and internal force is transferred smoothly through rectangular structure. The finite element program ANSYS is used to establish the local model of the arch beam joint. The results show that the overall stress performance is good, the force transfer is reliable, and it is a reasonable structural design.
【作者單位】: 中鐵大橋勘測設計院集團有限公司;
【分類號】:U448.225
[Abstract]:The main bridge of a through steel box girder arch bridge with steel arch rib is three continuous arch bridge with unequal span, and the span arrangement is (60 136 208 136 60) m. The structure system is composed of pier-beam separation, arch beam consolidation, arch rib is composed of extroverted steel pipe main arch and space curve steel pipe auxiliary arch. The side span 60 m main girder adopts concrete box girder, and the arch span main girder is steel box girder. The lower structure adopts Y-shaped concrete pier. A new type of connection structure is adopted in the connection between steel pipe arch rib and steel box girder. The steel tube arch rib is inserted into the rectangular structure by melting through a rectangular structure at the position corresponding to the longitudinal web and transverse diaphragm on the top surface of the steel box girder. Arch rib and steel box girder are connected as a whole through rectangular structure, and internal force is transferred smoothly through rectangular structure. The finite element program ANSYS is used to establish the local model of the arch beam joint. The results show that the overall stress performance is good, the force transfer is reliable, and it is a reasonable structural design.
【作者單位】: 中鐵大橋勘測設計院集團有限公司;
【分類號】:U448.225
【相似文獻】
相關期刊論文 前10條
1 劉貴江;洛陽市洛浦大橋鋼管拱肋生產工藝[J];山西建筑;2002年02期
2 王小敏;青干河大橋鋼管拱肋的制作工藝與質量控制[J];中外公路;2003年03期
3 鄭永昌;隆海健;;鋼管拱肋加工制作工藝[J];西部交通科技;2009年11期
4 唐新銘,肖娟;邵陽市西湖大橋鋼管拱肋的吊裝方法[J];中外建筑;2004年04期
5 陳勇,羅萍,張輝;茅草街大橋368m跨鋼管拱肋制作與安裝工藝介紹[J];中南公路工程;2005年02期
6 盧建常;;大跨度鋼管砼拱橋鋼管拱肋制作的監(jiān)控要點[J];廣東建材;2006年03期
7 何華;駱琴;王R莢,
本文編號:2383811
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2383811.html