大型復(fù)雜橋梁施工過程動(dòng)態(tài)控制與管理技術(shù)研究
[Abstract]:With the acceleration of the construction of national transportation infrastructure, the number and scale of large and complex bridges are increasing day by day. However, the problems in the construction of large bridges are also gradually emerging. In the process of bridge construction, the line shape of the structure is changing in every construction stage, and the stress on each part of the structure is also changing. The construction control of large complex bridges is an important link in connection design and construction, and it is also a difficult task in the construction of large complex bridges. The construction process control quality of large complex bridges plays a decisive role in the state of bridge construction and the quality of construction. In this paper, the project background is the cable-stayed bridge with the prestressed concrete tower, which is the largest span in China, which is called "the cable-stayed bridge of the South-to-North Water transfer Project", which spans the main trunk canal of the main channel of the South-to-North Water transfer Project (hereinafter referred to as the "South-to-North Water transfer Cable-Stayed Bridge"). Tracking the whole construction process of the bridge, aiming at the construction quality of the main pier cap, girder, stay cable and cable tower of the bridge, so as to guide the construction of the bridge. The main research contents are as follows: (1) the significance of construction process control of large and complex bridges is expounded, and the development of cable-stayed bridges and low-tower cable-stayed bridges and their representative bridges are summarized and summarized respectively. This paper also analyzes the present situation of the research on the quality control of mass concrete construction and the superstructure control theory of large and complex bridges, especially cable-stayed bridges. (2) the size of the main pier cap and the concrete mix ratio of the cable-stayed bridge of South-to-North Water transfer Project are analyzed. Based on the proposed construction method and cold pipe location, a finite element model based on hydration heat analysis is established, and the distribution of temperature field and stress field in different periods is analyzed. At the same time, the representative nodes are selected to investigate the temperature difference between inside and outside, the stress and the allowable tensile stress intensity development trend of special position after the completion of mass concrete cap construction, and to judge the development of cracks. The sensitivity of mass concrete temperature field and stress field distribution to pouring temperature, convection boundary condition and cooling water velocity of cold pipe is studied and analyzed. (3) the finite element simulation model of South-to-North Water transfer Cable-Stayed Bridge is established. According to the proposed construction organization design, the maximum cantilever state, the side span closure, the middle span closure and so on are selected. The simulation results of the internal force, stress, deformation, displacement of the cable tower and cable force of the cable are emphatically analyzed. According to the results of finite element simulation analysis, the vertical formwork elevation of each section of main girder is provided, which provides theoretical basis and guidance for construction control. (4) the adaptive control theory is applied to the construction control of the upper structure of the cable-stayed bridge of South-to-North Water transfer Project. The specific monitoring program is established and implemented, including linear monitoring, stress monitoring, temperature monitoring and so on. The specific implementation methods for each monitoring content are given. (5) according to the parameter identification part of the adaptive construction control theory, the different identification methods and their principles are introduced, and the comparison is made. Finally, the neural network is selected as the parameter identification method in the adaptive construction control of the bridge, and a three-layer BP neural network model is designed, which is trained and verified by the training sample data and the identification sample data. The results show that the error result of parameter identification of the cable-stayed bridge of South-to-North Water transfer using BP neural network is within the acceptable range, which indicates the feasibility of using the designed BP neural network.
【學(xué)位授予單位】:鄭州大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:U445
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 傅卯生;;汾河矮塔斜拉橋模型設(shè)計(jì)與試驗(yàn)[J];山西交通科技;2006年02期
2 袁鈺;吳京;;高塔型矮塔斜拉橋初探[J];公路;2008年01期
3 李雁;;矮塔斜拉橋無索區(qū)優(yōu)化[J];山西建筑;2009年10期
4 朱保華;李亞東;;矮塔斜拉橋結(jié)構(gòu)參數(shù)研究[J];四川建筑;2009年02期
5 陸林祥;張山榮;鄭漢;;矮塔斜拉橋綜述[J];山西建筑;2009年34期
6 韓振勇;田仲超;周國華;;淺談矮塔斜拉橋的起源與發(fā)展[J];山西建筑;2010年01期
7 劉文會(huì);李雁;;矮塔斜拉橋無索區(qū)長度優(yōu)化分析[J];中外公路;2010年01期
8 汪學(xué)著;孫勇;許志英;;柔性矮塔斜拉橋的設(shè)計(jì)實(shí)踐與優(yōu)化分析[J];浙江科技學(xué)院學(xué)報(bào);2011年01期
9 陳星燁;王平;;矮塔斜拉橋靜載作用下的參數(shù)分析[J];公路與汽運(yùn);2011年03期
10 劉秀芝;;矮塔斜拉橋靜力性能的有限元分析[J];西南公路;2011年03期
相關(guān)會(huì)議論文 前10條
1 王勝;;矮塔斜拉橋在橋梁建設(shè)中的應(yīng)用分析[A];第九屆后張預(yù)應(yīng)力學(xué)術(shù)交流會(huì)論文集[C];2006年
2 潘穎;鄧宇;;某矮塔斜拉橋0#塊局部受力分析[A];重慶力學(xué)學(xué)會(huì)2009年學(xué)術(shù)年會(huì)論文集[C];2009年
3 顧安邦;徐君蘭;;矮塔斜拉橋[A];中國公路學(xué)會(huì)橋梁和結(jié)構(gòu)工程學(xué)會(huì)2001年橋梁學(xué)術(shù)討論會(huì)論文集[C];2001年
4 陳從春;肖汝誠;;矮塔斜拉橋幾個(gè)問題的探討及發(fā)展展望[A];中國公路學(xué)會(huì)橋梁和結(jié)構(gòu)工程分會(huì)2005年全國橋梁學(xué)術(shù)會(huì)議論文集[C];2005年
5 劉昊蘇;董軍;楊昀;;不同設(shè)計(jì)參數(shù)下曲線矮塔斜拉橋地震響應(yīng)分析[A];第21屆全國結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅱ冊[C];2012年
6 谷音;鐘華;卓衛(wèi)東;;基于性能的矮塔斜拉橋結(jié)構(gòu)地震易損性分析[A];第六屆全國防震減災(zāi)工程學(xué)術(shù)研討會(huì)論文集(Ⅰ)[C];2012年
7 韓鳳真;孔衛(wèi)強(qiáng);;大體積混凝土施工在實(shí)際工程中的技術(shù)應(yīng)用[A];河南省土木建筑學(xué)會(huì)2010年學(xué)術(shù)大會(huì)論文集[C];2010年
8 孔德友;楊俊偉;;大體積混凝土施工中裂縫的產(chǎn)生原因及防治措施[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2006)[C];2006年
9 邱永展;秦翔;;大體積混凝土澆筑類施工方案審查的幾點(diǎn)建議[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2010)[C];2010年
10 耿娟;;大體積混凝土裂縫的控制[A];鐵道工務(wù)(鐵路房建管理專集)[C];2007年
相關(guān)重要報(bào)紙文章 前10條
1 記者 王丹;省內(nèi)最大矮塔斜拉橋合龍[N];吉林日報(bào);2012年
2 記者 達(dá)娃;拉薩納金大橋昨日正式開通[N];拉薩晚報(bào);2013年
3 本報(bào)通訊員 張同飛;闖難關(guān)宵旰攻堅(jiān) 橋梁人百煉成鋼[N];人民鐵道;2011年
4 新疆油田公司采油二廠工藝研究所 尹建江 新疆克拉瑪依石油局設(shè)計(jì)院監(jiān)理公司 王宗昌 尹金生;預(yù)拌混凝土質(zhì)量問題及大體積混凝土施工控制(下)[N];中國建材報(bào);2007年
5 山西潞安工程有限公司 楊勇;淺析控制大體積混凝土裂縫的措施[N];科學(xué)導(dǎo)報(bào);2010年
6 王林波 陳建江 博樂市九洲建筑安裝有限責(zé)任公司;論建筑施工中的大體積混凝土澆筑技術(shù)[N];博爾塔拉報(bào);2008年
7 韓利兵;大體積混凝土施工技術(shù)研究[N];晉中日報(bào);2012年
8 浙江紹興 馮春華 顧素玲 陳迪偉;高層建筑承臺(tái)大體積混凝土施工[N];建筑時(shí)報(bào);2013年
9 水電顧問集團(tuán) 常作維;大體積混凝土的溫度控制[N];中國能源報(bào);2013年
10 裘寶華;大體積混凝土施工中溫度裂縫的分析和預(yù)防控制[N];建筑時(shí)報(bào);2006年
相關(guān)博士學(xué)位論文 前10條
1 宋濤;矮塔斜拉橋近似分析方法研究[D];長安大學(xué);2016年
2 孫向東;四塔單索面寬幅脊梁矮塔斜拉橋設(shè)計(jì)關(guān)鍵技術(shù)研究[D];武漢理工大學(xué);2010年
3 陳從春;矮塔斜拉橋設(shè)計(jì)理論核心問題研究[D];同濟(jì)大學(xué);2006年
4 左正;混凝土壩水管尺度級別溫度場模擬研究[D];清華大學(xué);2015年
5 李潘武;大體積混凝土非荷載應(yīng)力的施工系統(tǒng)控制[D];西安建筑科技大學(xué);2004年
6 江昔平;大體積混凝土溫度裂縫控制機(jī)理與應(yīng)用方法研究[D];西安建筑科技大學(xué);2013年
7 楊和禮;原材料對基礎(chǔ)大體積混凝土裂縫的影響與控制[D];武漢大學(xué);2004年
8 劉昀;部分預(yù)應(yīng)力混凝土斜拉橋非線性性能與設(shè)計(jì)方法研究[D];長沙理工大學(xué);2015年
9 王新岐;斜拉橋破損診斷技術(shù)的研究[D];天津大學(xué);2003年
10 王建平;復(fù)合材料斜拉橋設(shè)計(jì)理論研究[D];武漢理工大學(xué);2002年
相關(guān)碩士學(xué)位論文 前10條
1 任高杰;大型復(fù)雜橋梁施工過程動(dòng)態(tài)控制與管理技術(shù)研究[D];鄭州大學(xué);2017年
2 田鵬;組合梁矮塔斜拉橋結(jié)構(gòu)優(yōu)化[D];吉林建筑工程學(xué)院;2009年
3 劉偉;矮塔斜拉橋施工控制及其相關(guān)技術(shù)問題研究[D];華南理工大學(xué);2015年
4 陳新培;矮塔斜拉橋施工控制技術(shù)研究[D];東北林業(yè)大學(xué);2015年
5 郭如意;矮塔斜拉橋合理施工狀態(tài)索力研究[D];東北林業(yè)大學(xué);2015年
6 雷忠偉;矮塔斜拉橋結(jié)構(gòu)參數(shù)敏感性分析[D];東北林業(yè)大學(xué);2015年
7 耿君君;矮塔斜拉橋拉索和預(yù)應(yīng)力筋的相互影響及配置優(yōu)化研究[D];長安大學(xué);2015年
8 朱強(qiáng);矮塔斜拉橋的動(dòng)力特性分析及地震響應(yīng)研究[D];西南交通大學(xué);2015年
9 熊飛;矮塔斜拉橋的設(shè)計(jì)理論若干問題研究[D];上海應(yīng)用技術(shù)學(xué)院;2015年
10 黃德春;矮塔斜拉橋設(shè)計(jì)參數(shù)的優(yōu)化[D];重慶交通大學(xué);2015年
,本文編號:2326887
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2326887.html