超大斷面淺埋巖層隧道施工方案優(yōu)化及穩(wěn)定性評價研究
[Abstract]:Railway is one of the most important basic transportation facilities in China and plays a very important role in the transportation system. Due to the rapid development of China's economic system in recent years, high-speed railway has entered a period of rapid construction. The use of large-section and super-section tunnels in the mountain and high-speed railway section is particularly prominent. Due to its large excavation span, complex construction procedure, multiple disturbances to surrounding rock and complex stress on rock and soil, reasonable excavation method and real-time monitoring of lining deformation are the key to ensure tunnel safe construction. In this paper, based on the construction of Duli tunnel of Xi'an Chengdu railway passenger dedicated line, through theoretical analysis, numerical simulation and field monitoring, the construction scheme of Deli tunnel is determined and its stability is evaluated. On the basis of consulting relevant documents, this paper analyzes the research progress of large-section tunnel and super-section tunnel at home and abroad, and grasps the relationship between the stress, deformation and settlement of surrounding rock of large-section tunnel under different working conditions. In view of the actual situation of Deli tunnel project, two kinds of construction schemes are preliminarily selected, and a two-dimensional numerical model is established, and two different construction schemes are numerically analyzed and calculated. Based on the results of two-dimensional numerical calculation, three-dimensional numerical simulation analysis is carried out for different construction methods. By comparing the stress, deformation, settlement, economy and timeliness of the tunnel surrounding rock and supporting structure under various working conditions, the construction scheme of shallow buried tunnel with super large section is optimized. Field monitoring is carried out on the construction of Deli tunnel, which includes stress monitoring of steel arch frame, axial force monitoring of anchor rod, monitoring of surrounding rock pressure, monitoring of deep displacement of surrounding rock, monitoring of pressure between lining and settlement of tunnel, etc. Through the analysis of monitoring data and three-dimensional numerical simulation data, the stability of tunnel is evaluated and analyzed. This paper provides a theoretical basis for the safe construction of Deli tunnel, and the research method of this paper can be used for reference in the selection of construction scheme and the evaluation of stability of super-large section tunnel.
【學(xué)位授予單位】:西安科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:U455.4
【相似文獻】
相關(guān)期刊論文 前10條
1 黃靈強;;水下超大斷面隧道襯砌施工新技術(shù)[J];隧道建設(shè);2013年01期
2 歐孝奪;吳紅營;黃頌揚;唐迎春;;超大斷面箱形明挖隧道施工監(jiān)測與力學(xué)特性分析[J];土木工程學(xué)報;2013年07期
3 閆峻;李迎軍;張婉;;超大斷面隧道施工實踐[J];山東交通科技;2007年04期
4 辜建軍;;超大斷面隧道開挖方法[J];科技風(fēng);2010年05期
5 陳秋南;王勤榮;謝小魚;李松;;扁坦超大斷面小凈距隧道支護結(jié)構(gòu)的力學(xué)性狀[J];公路交通科技;2012年09期
6 李豐果;;大瑤山隧道超大斷面順穿斷層導(dǎo)流洞施工技術(shù)[J];巖土工程界;2006年05期
7 張慧玲;;高速鐵路超大斷面隧道支護參數(shù)研究[J];四川建筑;2010年03期
8 ;世界首座濕陷性黃土超大斷面鐵路隧道在河南貫通[J];隧道建設(shè);2008年02期
9 張慧玲;;高速鐵路超大斷面隧道支護參數(shù)及施工方法研究[J];鐵道建筑技術(shù);2009年08期
10 劉湛省;;超大斷面暗挖車站修建技術(shù)[J];山西建筑;2010年13期
相關(guān)會議論文 前6條
1 李豐果;;大瑤山一號隧道九峰河超大斷面導(dǎo)流洞順穿斷層施工技術(shù)[A];中鐵隧道集團2006年客運專線專題技術(shù)交流大會論文集[C];2006年
2 蘇江川;唐穎;繆圓冰;;超大斷面多孔隧道群體施工工序模擬分析[A];中國土木工程學(xué)會第十二屆年會暨隧道及地下工程分會第十四屆年會論文集[C];2006年
3 楊明哲;高文學(xué);畢強;;超大斷面隧道開挖過程數(shù)值模擬分析[A];第2屆全國工程安全與防護學(xué)術(shù)會議論文集(上冊)[C];2010年
4 袁勇;王勝輝;;超大斷面低扁平率公路隧洞新型支護體系研究[A];盛世歲月——祝賀孫鈞院士八秩華誕論文選集[C];2006年
5 何川;蘇宗賢;;大型跨江海隧道整體化設(shè)計的基本思路[A];中國土木工程學(xué)會第十三屆年會暨隧道及地下工程分會第十五屆年會論文集[C];2008年
6 李建軍;包燁明;;超大斷面干燥粉細砂層隧道旋噴樁施工技術(shù)[A];中國土木工程學(xué)會第十五屆年會暨隧道及地下工程分會第十七屆年會論文集[C];2012年
相關(guān)重要報紙文章 前8條
1 陸婭楠;世界首座超大斷面鐵路隧道貫通[N];人民日報;2008年
2 陳云 江耀明;世界首條超大斷面鐵路隧道貫通[N];建筑時報;2008年
3 特約通訊員 王懷堯;超大斷面隧道施工破紀錄[N];中國鐵道建筑報;2000年
4 本報記者 于祥明邋王堯 王文清;世界首座鐵路超大斷面黃土隧道貫通[N];上海證券報;2008年
5 通訊員 曲寶臻 孔祥文;二十二局集團實現(xiàn)三步走戰(zhàn)略[N];中國鐵道建筑報;2007年
6 文雄 郭宗華 王海蓬;挺進西南 創(chuàng)譽巴蜀[N];中國鐵道建筑報;2011年
7 通訊員 張亮術(shù);地下水回灌技術(shù):讓隧道“環(huán)保穿越”[N];中國鐵道建筑報;2014年
8 記者 劉招 通訊員 劉燦;鄭州研發(fā)世界最大矩形盾構(gòu)下線[N];鄭州日報;2013年
相關(guān)碩士學(xué)位論文 前8條
1 王明明;超大斷面淺埋巖層隧道施工方案優(yōu)化及穩(wěn)定性評價研究[D];西安科技大學(xué);2015年
2 周云鵬;超大斷面黃土公路隧道襯砌受力變形特性研究[D];西安科技大學(xué);2014年
3 劉宗建;超大斷面突變小斷面施工技術(shù)研究[D];重慶交通大學(xué);2013年
4 孫兟;淺埋偏壓超大斷面地鐵車站工法選擇研究[D];重慶大學(xué);2012年
5 原小帥;超大斷面軟弱破碎圍巖隧道施工過程優(yōu)化及其應(yīng)用研究[D];山東大學(xué);2011年
6 曾慶元;超大斷面淺埋暗挖地鐵車站施工技術(shù)研究[D];西安科技大學(xué);2014年
7 劉云亮;北京超大斷面隧道近距離下穿地鐵高架橋影響與控制研究[D];北京交通大學(xué);2015年
8 楊泉;超大斷面完全嵌巖樁(墩)基礎(chǔ)在軟巖地基中受荷性狀的研究[D];西南交通大學(xué);2014年
,本文編號:2261925
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2261925.html