巖溶地區(qū)橋梁樁基成孔處理方案研究
[Abstract]:With the development of economy and the progress of science and technology, the demand of freeway is more and more. With the rapid increase of highway mileage, it is inevitable to increase the construction of highway in karst area. This paper mainly aims at the bridge foundation construction in karst development area, how to reasonably solve the serious difficulties of pile foundation construction in karst cave area during the construction process, and ensure the construction safety and construction quality of pile foundation. Because the pile foundation construction of the karst cave is unpredictable and dangerous, this paper mainly analyzes the characteristics of the karst cave in the construction process of the karst cave pile foundation, and probes into the karst area with the means of high density electrical karst exploration. The geological and geomorphological characteristics of karst area are obtained intuitively and analyzed in detail. Based on the investigation and analysis of the problems in construction, this paper summarizes the common problems in the field construction in karst area, and probes into the rationality of effective measures taken in the construction process of the karst cave pile foundation. In order to achieve the maximum economic value of the karst cave pile foundation, the construction technicians first carefully read the design drawings and survey materials before the construction of the karst cave pile foundation, so as to find out the basic conditions of the karst cave and the earth tunnel of the pile foundation. To optimize the construction technology of bridge foundation in karst area, at the same time, to strengthen the monitoring of geological change in the construction process, to monitor the consistency of mud, the number of layers of cavern and the shape of fillers, etc., and to make detailed borehole records. It provides the basis for analyzing the cause and choosing the appropriate treatment plan when the abnormal situation occurs. According to different geological anomalies, different treatment schemes can be chosen to avoid inclined pile, drill jam, hole collapse, hole enlargement, burying drill and even broken pile during construction in karst area, which can provide experience for later construction. This paper takes the foundation design and construction of a bridge of Erguang Expressway in Guangdong Province as the object, through the analysis of the present situation of karst development at home and abroad and its influence on engineering design and construction, referring to the previous foundation construction technology and equipment. Based on the successful experience of quality management, combined with the samples and records of punched rock on the spot, the experience of pile foundation treatment of karst cave has been summarized, and the suitability of the treatment measures adopted is analyzed. It provides a reference for the foundation construction in complex karst areas, and provides a new hint for the research and application of the technicians in this field in the field of engineering and the combination of theory and practice.
【學(xué)位授予單位】:湖北工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:U445.551
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 姚金水;王玉良;;溶洞樁基處理[J];科技與企業(yè);2015年18期
2 宋曉容;;巖溶地區(qū)深水大直徑樁基施工技術(shù)[J];鐵道建筑技術(shù);2013年05期
3 張文;;巖溶地區(qū)樁基施工技術(shù)及異常情況的處理工作內(nèi)容[J];中國高新技術(shù)企業(yè);2013年11期
4 王巖;;巖溶地區(qū)樁基施工技術(shù)[J];科技傳播;2012年24期
5 項(xiàng)川;袁勇;胡艷軍;;鐵路路基巖溶病害的探測與處理[J];路基工程;2012年06期
6 羅科進(jìn);;橋梁樁基施工技術(shù)在巖溶地質(zhì)區(qū)的應(yīng)用[J];山西建筑;2010年27期
7 錢斌;張格飛;;巖溶地區(qū)樁基礎(chǔ)選型的實(shí)例分析[J];土工基礎(chǔ);2010年01期
8 黃紹逵;歐陽玉飛;;高密度電法在巖溶勘察中的應(yīng)用[J];工程地球物理學(xué)報(bào);2009年06期
9 羅元明;;淺談橋梁溶洞樁基處理方法[J];山西建筑;2009年09期
10 鄧超文;;高密度電法的原理及工程應(yīng)用[J];韶關(guān)學(xué)院學(xué)報(bào);2007年06期
相關(guān)碩士學(xué)位論文 前2條
1 尹國榮;巖溶區(qū)勘察方法及橋梁樁基施工技術(shù)[D];中南大學(xué);2009年
2 鄧家喜;廣西典型巖溶發(fā)育區(qū)路基基底勘察及處治技術(shù)的研究[D];廣西大學(xué);2006年
,本文編號(hào):2258450
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2258450.html