復(fù)雜地質(zhì)條件下隧道涌水量預(yù)測(cè)中集水面積的研究
[Abstract]:In the complex geological area, in order to scientifically determine the water catchment area under different tunnel crossing modes, this paper constructs different geological structures based on three factors: topography, lithology and geological structure. Combined with the change of tunnel spatial distribution, the catchment area is studied. Three types of main catchment topography and four types of geological structures and two types of tunnel crossing modes are summarized and summarized. Based on the above factors, four types of water catchment area variation models are summarized, such as burial syncline, burial anticline, burial monocline and exposed monoclinal, and the methods of determining the catchment area in different models are obtained. Taking Qiantuowan tunnel of Yu-Li railway as an example, it is concluded that the water catchment area in tunnel inflow calculation belongs to the second type model. Tunnel passes through buried strata, and it is easy to ignore part area when judging tunnel water gathering area, which should be paid more attention to.
【作者單位】: 成都理工大學(xué)地質(zhì)災(zāi)害防治與地質(zhì)環(huán)境保護(hù)國(guó)家重點(diǎn)實(shí)驗(yàn)室;中國(guó)電建集團(tuán)成都勘測(cè)設(shè)計(jì)研究院有限公司;四川省地質(zhì)工程集團(tuán)公司;
【基金】:地質(zhì)災(zāi)害防治與地質(zhì)環(huán)境保護(hù)國(guó)家重點(diǎn)實(shí)驗(yàn)室自主研究課題(SKLGP2015Z013)
【分類號(hào)】:U456.32
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 彭輝才;徐衛(wèi)東;付青;熊燕娜;;貴州綠塘煤礦涌水量預(yù)測(cè)研究[J];南水北調(diào)與水利科技;2013年02期
2 劉廣濤;;穩(wěn)定流單井抽水實(shí)驗(yàn)水文地質(zhì)參數(shù)確定及涌水量預(yù)測(cè)[J];廣東科技;2006年02期
3 李興高,劉維寧,張昀青;隧道滲涌水量的隨機(jī)模型預(yù)測(cè)[J];中國(guó)安全科學(xué)學(xué)報(bào);2002年04期
4 張航泊;范軍峰;石衛(wèi);;柞水縣大西溝鐵礦露天采場(chǎng)涌水量預(yù)測(cè)探討[J];地下水;2012年05期
5 張海英;;黃坪上塘礦區(qū)水文地質(zhì)條件及涌水量預(yù)測(cè)分析[J];地下水;2014年02期
6 高明久;程微;程靜;;遼寧本溪某鐵礦水文地質(zhì)條件與井巷涌水量預(yù)測(cè)[J];地下水;2012年05期
7 蘇文智,鄭書信;四川省永川煤礦礦井涌水量預(yù)測(cè)[J];西北建筑工程學(xué)院學(xué)報(bào);1996年01期
8 雷明信;徐強(qiáng);;Visual MODFLOW在某礦山防治水研究中的應(yīng)用[J];鈾礦冶;2011年01期
9 楊超;;隧道涌水量預(yù)測(cè)計(jì)算方法探討[J];科技與企業(yè);2013年07期
10 鄧小鵬;;寶塔山特長(zhǎng)隧道水文地質(zhì)特征及涌水量預(yù)測(cè)[J];華東公路;2014年03期
相關(guān)會(huì)議論文 前9條
1 劉其興;賽云秀;劉健勤;;礦井建設(shè)中涌水量預(yù)測(cè)理論研究[A];礦井建設(shè)與巖土工程技術(shù)新發(fā)展[C];1997年
2 劉曉麗;王恩志;;某井田水體下開采過程中地下水滲流模擬及涌水量預(yù)測(cè)[A];第九屆全國(guó)滲流力學(xué)學(xué)術(shù)討論會(huì)論文集(二)[C];2007年
3 雷明信;;鈾礦山設(shè)計(jì)預(yù)測(cè)涌水量修正方法研究[A];中國(guó)核科學(xué)技術(shù)進(jìn)展報(bào)告(第二卷)——中國(guó)核學(xué)會(huì)2011年學(xué)術(shù)年會(huì)論文集第2冊(cè)(鈾礦冶分卷、核能動(dòng)力分卷(上))[C];2011年
4 李偉;徐栓祥;劉善勇;;龍固礦深立井穿多含水層井筒涌水量預(yù)測(cè)方法的研究[A];煤礦安全高效開采理論技術(shù)與實(shí)踐[C];2010年
5 車志強(qiáng);韓國(guó)童;李學(xué)問;張富有;;王河煤礦礦井涌水量預(yù)測(cè)方法對(duì)比研究[A];經(jīng)濟(jì)策論(上)[C];2011年
6 車志強(qiáng);韓國(guó)童;李學(xué)問;張富有;;王河煤礦礦井涌水量預(yù)測(cè)方法對(duì)比研究[A];河南地球科學(xué)通報(bào)2011年卷(下冊(cè))[C];2011年
7 陳書客;匡偉;時(shí)代;劉立忠;;基于FEFLOW的林南倉(cāng)礦滲流場(chǎng)模擬及涌水量預(yù)測(cè)[A];2011全國(guó)礦山測(cè)量新技術(shù)學(xué)術(shù)會(huì)議論文集[C];2011年
8 李洪亮;李文平;官云章;張志勇;;綜采放頂煤開采頂板涌水量分析預(yù)測(cè)[A];第七屆全國(guó)工程地質(zhì)大會(huì)論文集[C];2004年
9 廖紅梅;郭西進(jìn);;礦井順?biāo)鬯蛔詣?dòng)檢測(cè)新方法[A];第十六屆全國(guó)煤炭自動(dòng)化學(xué)術(shù)年會(huì)、中國(guó)煤炭學(xué)會(huì)自動(dòng)化專業(yè)委員會(huì)學(xué)術(shù)會(huì)議論文集[C];2006年
相關(guān)博士學(xué)位論文 前2條
1 劉文劍;基于滲流場(chǎng)—損傷場(chǎng)耦合理論的隧道涌水量預(yù)測(cè)研究[D];中南大學(xué);2008年
2 程盼;基于生態(tài)平衡的隧道地下水滲控方法及限排水標(biāo)準(zhǔn)研究[D];中南大學(xué);2014年
相關(guān)碩士學(xué)位論文 前10條
1 郭思良;盾構(gòu)施工煤礦斜井涌水量預(yù)測(cè)與襯砌泄水壓?jiǎn)栴}研究[D];西南交通大學(xué);2015年
2 南力輝;雙碑隧道涌水量預(yù)測(cè)及運(yùn)營(yíng)預(yù)警措施研究[D];西南交通大學(xué);2015年
3 王玉蕊;基于解析法的巖溶隧道涌水量計(jì)算改進(jìn)探析[D];成都理工大學(xué);2015年
4 謝婷婷;Visual MODFLOW對(duì)某磷礦開采礦坑涌水量的預(yù)測(cè)研究[D];西南交通大學(xué);2016年
5 曹云云;巖溶地區(qū)基坑涌水量數(shù)值模擬分析[D];貴州大學(xué);2016年
6 馬凱;檸條塔煤礦S1224工作面涌水量動(dòng)態(tài)數(shù)值模擬研究[D];西安科技大學(xué);2016年
7 代金鑫;巖溶富水隧道多場(chǎng)耦合分析及涌水量預(yù)測(cè)研究[D];重慶大學(xué);2016年
8 劉汝學(xué);紗嶺金礦涌水量分析與預(yù)測(cè)[D];山東農(nóng)業(yè)大學(xué);2016年
9 陳利娟;魚田堡煤礦礦坑水動(dòng)態(tài)分析及涌水量預(yù)測(cè)[D];成都理工大學(xué);2009年
10 趙雯雯;程潮鐵礦大氣降水—涌水量統(tǒng)計(jì)預(yù)測(cè)分析[D];武漢科技大學(xué);2011年
,本文編號(hào):2243572
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2243572.html