鋼—混凝土組合連續(xù)梁橋預應力施加方法研究
[Abstract]:The steel concrete composite beam bridge is an important branch of the current bridge engineering. It combines the upper concrete bridge deck with the lower steel beam through the shear connector, and can give full play to the tensile strength of the steel and the compressive strength of the concrete. For the multi span composite beam bridge with a span of more than 25m, the structure of continuous beam is generally adopted. However, there is a negative moment zone near the middle fulcrum of the steel concrete composite continuous beam bridge, which leads to the tension of the concrete bridge deck in the upper part and the compression of the steel beam in the lower part. Therefore, some construction measures should be taken to improve the mechanical properties of the negative bending moment zone structure of the steel concrete composite continuous beam bridge. The commonly used prestressed steel concrete composite continuous beam bridge prestressing force is applied, and the calculation theory of the composite structure is expounded. A three span steel concrete composite continuous beam bridge in the South West Lake riverside road bridge in Lanzhou city is studied, and the real bridge finite element model is set up by Midas Civil software, and the construction of the bridge is built. The whole process is calculated. Through the analysis of the calculation results, the stress situation of the upper and lower edge of the steel box girder, the stress situation of the bridge deck and the deformation of the whole structure are understood under each design construction step, and the changes of the stress and displacement of the structure during the whole construction stage are explained. In this paper, the variable parameters of the finite element model of the background engineering are analyzed. By changing the size of the top force and the position of the top force in the finite element model, the size of the tensile force of the prestressed steel beam, the one-off and staging construction of the bridge deck, and the filling of the steel box girder in the negative moment zone of the middle branch are filled in. Concrete is filled with concrete and other parameters which are not considered in the negative bending moment zone of the middle fulcrum. The calculation results of stress and displacement of the structure are compared with the stress and displacement calculation results under the design parameters. The following main conclusions are obtained. 1, the effect of the applied force on the stress and displacement in the construction process is greater, and the top force is applied. The stress of steel box girder at point is more unfavorable.2. The layout of prestressed steel beam can increase the compressive stress of the bridge deck and improve the stress.3 of the concrete bridge deck in the negative moment zone. The stage placement of the bridge panel can significantly reduce the tensile stress of the bridge deck during the construction process, but the division of the staging section should be combined with the layout of the prestressed steel beam to determine.4 and negative in the middle fulcrum. Concrete filled with steel box girder bottom and pier top in bending area can significantly reduce the compressive stress value of steel box girder.
【學位授予單位】:蘭州交通大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:U445.57
【相似文獻】
相關期刊論文 前10條
1 李貴美;提高澆筑混凝土質(zhì)量的六個環(huán)節(jié)[J];安徽建筑;2002年03期
2 楊志;;痊愈吧,混凝土[J];中國房地產(chǎn)業(yè);2013年04期
3 楊俊生;;混凝土裂縫的預防和處理[J];科學之友;2013年07期
4 司道明;新舊混凝土的結(jié)合措施[J];安徽建筑;1999年02期
5 余瓊,胡克旭,朱伯龍;舊混凝土與新混凝土結(jié)合的抗剪性能研究[J];四川建筑科學研究;2000年04期
6 買買提吐遜;;耐抗磨混凝土在阿合布隆渠首工程中的應用[J];新疆水利;2003年03期
7 劉亞南;;混凝土超聲無損檢測技術的應用[J];土工基礎;2007年04期
8 劉智;;水利建筑物混凝土的破壞及防治[J];中小企業(yè)管理與科技(下旬刊);2009年11期
9 閻文秀;;混凝土U形渠道產(chǎn)生裂縫原因及防治措施的探討[J];山西水利科技;2010年01期
10 王健;王永逵;趙銀花;;對混凝土表面起粉、露砂的幾點看法[J];商品混凝土;2011年09期
相關會議論文 前6條
1 買淑芳;;混凝土裂縫修補方法[A];混凝土工程質(zhì)量控制適用技術交流會論文匯編[C];1991年
2 洪定海;丁建彤;;混凝土抗氯化物侵入性標準測試方法的適用性[A];第五屆混凝土結(jié)構耐久性科技論壇論文集[C];2006年
3 顧寅;;雙圈環(huán)繞無粘結(jié)預應力混凝土村砌施工技術及數(shù)據(jù)統(tǒng)計[A];第十一屆全國混凝土及預應力混凝土學術交流會論文集[C];2001年
4 孟憲虎;劉新鵬;于廣林;程天奎;;C_(70)膠乳改性混凝土在新疆石河子紅山嘴水力發(fā)電廠的應用[A];中國管理科學文獻[C];2008年
5 孫塘根;;紫坪鋪堆石壩混凝土面板防裂綜合方法[A];土石壩技術——2008年論文集[C];2008年
6 藺鵬臻;劉鳳奎;劉炎海;;三主桁斜拉橋鋼—混凝土結(jié)合橋面的局部受力研究[A];第二十屆全國橋梁學術會議論文集(上冊)[C];2012年
相關重要報紙文章 前7條
1 胡東杰;預防混凝土侵蝕的措施[N];中國建材報;2005年
2 袁蘭;巴斯夫智能動力混凝土登陸中國[N];中國建材報;2009年
3 本報記者 吳林;巴斯夫“智能動力混凝土”面市[N];中國房地產(chǎn)報;2009年
4 ;混凝土耐久性的抗凍和碳化[N];中國建材報;2004年
5 記者 張培鐵;新老砼如何結(jié)合?[N];湖北日報;2007年
6 本報記者 楊亞非 胡志剛;欲與天公試比高[N];人民長江報;2007年
7 本報記者 周獻恩;開出“耐久花” 結(jié)滿“優(yōu)質(zhì)果”[N];中國交通報;2012年
相關博士學位論文 前4條
1 李雁;海洋腐蝕與凍融環(huán)境下?lián)胶狭匣炷廖锢砹W性能及損傷機理研究[D];中國礦業(yè)大學;2015年
2 范亮;鋼箱—混凝土組合拱截面受力行為與設計原理研究[D];西南交通大學;2010年
3 李朝紅;基于損傷斷裂理論的混凝土破壞行為研究[D];西南交通大學;2012年
4 張石波;考慮滑移效應的鋼—混凝土組合梁橋力學行為研究[D];華南理工大學;2012年
相關碩士學位論文 前8條
1 鄧志剛;鋼—混凝土組合連續(xù)梁橋預應力施加方法研究[D];蘭州交通大學;2015年
2 賈海深;氣送式混凝土螺旋濕噴機的性能分析與參數(shù)計算[D];太原理工大學;2012年
3 王棟;80m鋼—混凝土組合桁架梁橋聯(lián)結(jié)節(jié)點的力學性能分析[D];蘭州交通大學;2012年
4 孔敏;傾斜型預壓式鋼—混凝土結(jié)合段受力性能研究[D];長安大學;2011年
5 譚智軍;海洋生物膜對海洋混凝土抗氯離子滲透性的影響[D];哈爾濱工業(yè)大學;2008年
6 齊廣政;海洋大氣環(huán)境下混凝土氯離子侵蝕性能的試驗研究[D];西安建筑科技大學;2012年
7 崔玲;海洋環(huán)境下混凝土結(jié)構中氯離子的侵入機理與分布發(fā)展[D];青島理工大學;2010年
8 郝海明;爆破振動對巖巷混凝土噴層影響數(shù)值模擬研究[D];安徽理工大學;2013年
,本文編號:2132744
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2132744.html