天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當前位置:主頁 > 科技論文 > 路橋論文 >

隧道軟弱圍巖強度特性及支護結構穩(wěn)定性研究

發(fā)布時間:2018-06-20 00:09

  本文選題:隧道 + 軟弱圍巖。 參考:《遼寧工程技術大學》2015年博士論文


【摘要】:軟弱巖體的存在給大斷面隧道支護結構設計及圍巖穩(wěn)定性計算等帶來一系列棘手的問題。由于軟弱巖體中節(jié)理、裂隙的存在,其力學行為受巖石強度、結構面狀況及應力狀態(tài)等多方面影響,存在節(jié)理的硬巖在高應力作用下仍會表現(xiàn)出明顯的大變形特性及應變軟化特性,巖體的擴容現(xiàn)象突出,巖體變形具有不連續(xù)性。所以,對于軟弱巖體強度特性及峰后力學行為等問題值得深入研究與討論。論文針對以上問題,從隧道軟弱圍巖的變形破壞機制出發(fā),通過室內(nèi)巖石三軸試驗及現(xiàn)場超前地質(zhì)探測技術相結合的方法,探討軟弱圍巖的強度特征,確定圍巖結構特性,分析深埋隧道軟弱圍巖在卸載過程中的應變軟化行為及強度損傷演化規(guī)律,研究圍巖在二次應力作用下的應力場、位移場分布規(guī)律;采用收斂-約束法確定圍巖及支護結構安全系數(shù),并對支護結構及隧道開挖方法進行優(yōu)化設計,通過現(xiàn)場監(jiān)測及數(shù)值計算驗證優(yōu)化結構的安全穩(wěn)定性。論文得出具體結論如下:(1)基于量化GSI圍巖評級系統(tǒng),確定隧道軟弱圍巖在峰值及峰后殘余狀態(tài)的強度參數(shù),結合Hoek-Brown準則及巖體連續(xù)介質(zhì)應變軟化理論,構建深埋軟弱圍巖峰值及峰后殘余強度參數(shù)的函數(shù)關系式。(2)通過巖石室內(nèi)三軸試驗,確定峰后軟化模量與圍壓關系,構建完整巖石峰后應變軟化模型,結合超前地質(zhì)預報方法,確定深埋隧道軟弱圍巖力學參數(shù),指導隧道開挖方案優(yōu)化及支護結構設計。(3)通過數(shù)值計算與現(xiàn)場監(jiān)測數(shù)據(jù)可知,收斂-約束法適用于大斷面軟弱隧道圍巖支護結構設計,通過FLAC3D有限差分軟件構建隧道三維數(shù)值模型,得出不同開挖方法的圍巖-支護結構相互作用關系,提出各開挖方案的圍巖安全系數(shù),并對現(xiàn)有支護方案及開挖方法進行優(yōu)化設計,通過現(xiàn)場監(jiān)測數(shù)據(jù)驗證優(yōu)化設計的可靠性。(4)提出進化神經(jīng)元算法與BP神經(jīng)網(wǎng)絡算法耦合的GA-BP神經(jīng)元算法,應用于鋪子山隧道施工圍巖大變形預測,對隧道圍巖變形監(jiān)測數(shù)據(jù)進行多步滾動預測,通過實測數(shù)據(jù)與預測結果相比較,表明該算法具有極高的預測精度,可對類似工程提供借鑒。
[Abstract]:The existence of weak rock mass brings a series of thorny problems to the design of large section tunnel support structure and the calculation of surrounding rock stability. Because of the existence of joints and fissures in weak rock mass, its mechanical behavior is affected by rock strength, structural plane condition and stress state, etc. The jointed hard rock will still exhibit large deformation and strain softening characteristics under the action of high stress. The expansion of rock mass is prominent and the deformation of rock mass is discontinuous. Therefore, the strength characteristics and post-peak mechanical behavior of weak rock mass are worthy of further study and discussion. Aiming at the above problems, starting from the mechanism of deformation and failure of soft surrounding rock in tunnel, this paper discusses the strength characteristics of soft surrounding rock and determines the structural characteristics of surrounding rock through the combination of indoor triaxial test of rock and advance geological exploration technology. The strain softening behavior and strength damage evolution law of soft surrounding rock in deep buried tunnel during unloading are analyzed, and the stress field and displacement field distribution law of surrounding rock under secondary stress are studied. The safety factor of surrounding rock and supporting structure is determined by convergence-constraint method, and the optimum design of supporting structure and tunnel excavation method is carried out. The safety and stability of the optimized structure are verified by field monitoring and numerical calculation. The concrete conclusions are as follows: (1) based on the quantitative GSI surrounding rock rating system, the strength parameters of the peak and post-peak residual state of the soft surrounding rock in tunnel are determined, combined with the Hoek-Brown criterion and the strain softening theory of rock mass continuum. The relationship between post-peak softening modulus and confining pressure is determined through laboratory triaxial tests of rock, and a complete post-peak strain softening model is constructed, combined with advanced geological prediction method. To determine the mechanical parameters of soft surrounding rock of deep buried tunnel, to guide the optimization of excavation scheme and the design of supporting structure. (3) through numerical calculation and field monitoring data, we can know that the convergence-constraint method is suitable for the design of surrounding rock supporting structure of large section weak tunnel. The 3D numerical model of tunnel is constructed by FLAC3D finite difference software, and the interaction relationship between surrounding rock and supporting structure of different excavation methods is obtained, and the safety factor of surrounding rock of each excavation scheme is put forward. The existing support schemes and excavation methods are optimized, and the reliability of the optimization design is verified by field monitoring data. A GA-BP neuronal algorithm coupled with the BP neural network algorithm is proposed, which is coupled with the evolutionary neuron algorithm (ENA) and the BP neural network algorithm (BP neural network algorithm). The method is applied to the prediction of large deformation of surrounding rock in the construction of Pu Zishan Tunnel. The multi-step rolling prediction of the monitoring data of surrounding rock deformation of the tunnel is carried out. The comparison between the measured data and the prediction results shows that the algorithm has a very high prediction accuracy. It can be used for reference for similar projects.
【學位授予單位】:遼寧工程技術大學
【學位級別】:博士
【學位授予年份】:2015
【分類號】:U451.2

【相似文獻】

相關期刊論文 前10條

1 李松;;關于磨槽石隧道軟弱圍巖變形分析及應對措施[J];中國水運(下半月);2014年02期

2 任利華;;軟弱圍巖大跨度扁坦隧道修筑關鍵技術探討[J];內(nèi)蒙古公路與運輸;2005年04期

3 楊文平;郁存正;張根法;;自進式中空注漿錨桿在軟弱圍巖中的應用[J];四川建筑;2006年06期

4 臧應雨;董祥均;;隧道軟弱圍巖處理技術探討[J];山西建筑;2009年29期

5 朱君敏;劉志軍;;歌樂隧道軟弱圍巖初支變形成因分析及對策[J];科技資訊;2010年11期

6 杜小軍;;論軟弱圍巖的施工方法[J];市政技術;2010年S1期

7 陳偉;;軟弱圍巖在富水情況下塌方的預防和處理[J];科技傳播;2011年08期

8 孫生波;;淺談隧道軟弱圍巖施工[J];科技情報開發(fā)與經(jīng)濟;2011年20期

9 林福地;;淺談軟弱圍巖深孔鉆鑿技術[J];施工技術;2011年S2期

10 趙國棟;;軟弱圍巖隧洞施工的安全問題研究[J];科技信息;2013年03期

相關會議論文 前10條

1 鄒樹梅;王勝勇;;軟弱圍巖控制爆破設計與施工[A];第九屆全國結構工程學術會議論文集第Ⅲ卷[C];2000年

2 陶波;伍法權;郭啟良;郭改梅;;高地應力作用下烏鞘嶺深埋長隧道軟弱圍巖流變規(guī)律研究[A];中國地質(zhì)學會工程地質(zhì)專業(yè)委員會、貴州省巖石力學與工程學會2005年學術年會暨“巖溶·工程·環(huán)境”學術論壇論文集[C];2005年

3 張金星;;祁連山隧道富水軟弱圍巖防坍塌施工技術[A];中國土木工程學會第十五屆年會暨隧道及地下工程分會第十七屆年會論文集[C];2012年

4 孫鈞;潘曉明;;隧道軟弱圍巖擠壓大變形非線性流變力學特性研究[A];第十二次全國巖石力學與工程學術大會會議論文摘要集[C];2012年

5 宋政文;;管棚支護技術在武廣客運專線隧道軟弱圍巖開挖中的應用[A];客運專線工程技術學術研討會論文集(上)[C];2008年

6 周運祥;;淺談高地應力軟弱圍巖施工的關鍵技術[A];鐵路長大隧道設計施工技術研討會論文集[C];2004年

7 嚴伊莎;林永貴;段正君;;初始地應力對軟弱圍巖隧道襯砌力學行為的影響分析[A];中國土木工程學會第十二屆年會暨隧道及地下工程分會第十四屆年會論文集[C];2006年

8 王航;徐雨平;盧鋒;;軟弱圍巖地段隧道施工方案優(yōu)選研究[A];第十二屆海峽兩岸隧道與地下工程學術與技術研討會論文集[C];2013年

9 王曉睿;賈曉鳳;黃至全;;云嶺隧道軟弱圍巖黏彈塑性數(shù)值模擬及參數(shù)反演[A];巖石力學與工程的創(chuàng)新和實踐:第十一次全國巖石力學與工程學術大會論文集[C];2010年

10 朱慶文;;大保高速公路四角田隧道軟弱圍巖設計與施工[A];2001年全國公路隧道學術會議論文集[C];2001年

相關重要報紙文章 前10條

1 武久玉;淺談隧道軟弱圍巖地段病害整治方法[N];大眾科技報;2008年

2 通訊員 周廣寬 黃存才;黔貴鐵路大村隧道提前貫通[N];中國鐵道建筑報;2006年

3 張榮文 桑勝文 王佳友;創(chuàng)新有路勤為徑[N];中國鐵道建筑報;2006年

4 通訊員 周廣寬 陳慶亮;十二局集團二公司釜山隧洞提前報捷[N];中國鐵道建筑報;2006年

5 伍振 曹建忠 楊三柱;我國首次操作TBM施工[N];中華建筑報;2002年

6 姜書范 矣成輝 伍振;通天達海辟坦途[N];中國鐵道建筑報;2007年

7 鄭平良;亞洲山嶺第一長隧道行山隧道左線進口提前貫通[N];山西日報;2007年

8 龍艷 伍振;國企內(nèi)的“包工隊”[N];中華建筑報;2005年

9 記者 王立武 曾正賢;長梁山隧道榮獲優(yōu)質(zhì)樣板工程稱號[N];中國鐵道建筑報;2000年

10 記者 江耀明;“冠軍”贏在起跑線[N];中國鐵道建筑報;2008年

相關博士學位論文 前4條

1 李旭;隧道軟弱圍巖強度特性及支護結構穩(wěn)定性研究[D];遼寧工程技術大學;2015年

2 趙勇;隧道軟弱圍巖變形機制與控制技術研究[D];北京交通大學;2012年

3 王樹棟;復雜地應力區(qū)隧道軟弱圍巖大變形控制技術研究[D];北京交通大學;2010年

4 肖同剛;隧道軟弱圍巖—支護系統(tǒng)安全性分析評價及其工程應用[D];同濟大學;2007年

相關碩士學位論文 前10條

1 曾宏飛;軟弱圍巖淺埋偏壓四車道公路隧道安全施工技術研究[D];西南交通大學;2015年

2 鄭海珍;小寨隧道軟弱圍巖段特征及施工方案比選研究[D];西南交通大學;2015年

3 趙亢;極高地應力軟弱圍巖變形特征及控制技術研究[D];西南交通大學;2015年

4 程玉強;軟弱圍巖枿道施工階段力學性能分析[D];蘭州交通大學;2015年

5 高攀科;斑竹林隧道軟弱圍巖變形特征與控制措施研究[D];重慶交通大學;2009年

6 張洋;隧道工程軟弱圍巖大變形控制體系研究[D];西南交通大學;2006年

7 李瑞強;河北西部山區(qū)土石混合體公路隧道軟弱圍巖變形控制研究[D];石家莊鐵道大學;2013年

8 單士軍;軟弱圍巖公路隧道開挖支護施工過程研究[D];西南交通大學;2005年

9 王渭;烏鞘嶺公路隧道軟弱圍巖荷載作用特性與變形規(guī)律研究[D];長安大學;2012年

10 陽長江;淺埋軟弱圍巖大跨度扁平隧道快速施工研究[D];重慶交通大學;2012年



本文編號:2041969

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2041969.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權申明:資料由用戶c9138***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com