頂推法施工自錨式懸索橋關(guān)鍵技術(shù)與控制
本文選題:自錨式懸索橋 + 頂推法施工 ; 參考:《沈陽(yáng)建筑大學(xué)》2015年碩士論文
【摘要】:近幾年來(lái),隨著自錨式懸索橋越來(lái)越廣泛地應(yīng)用,特別是在我國(guó),自錨式懸索橋更是受到了許多工程師的青睞。自錨式懸索橋之所以得到了大力推廣,主要是因?yàn)樵擃悩蚓哂忻烙^的橋型;在其適用的跨徑范圍內(nèi),建造的工程費(fèi)用相對(duì)其他橋型而言更低廉。然而,自錨式懸索橋的施工控制理論和技術(shù)相對(duì)比較薄弱,有關(guān)這方面的研究在國(guó)內(nèi)外還比較少,現(xiàn)有的理論、設(shè)計(jì)方法和施工都還有待在實(shí)踐工程中去檢驗(yàn)、提取、歸納與總結(jié),從事這方面的研究工作無(wú)疑是很有意義的。本文結(jié)合潮白河自錨式懸索橋的施工過(guò)程,對(duì)其施工中的關(guān)鍵技術(shù)和施工控制進(jìn)行了研究,取得了具有實(shí)用價(jià)值的研究成果,為潮白河自錨式懸索橋的順利建成提供了技術(shù)支持。(1)詳細(xì)介紹了頂推法施工的分類,頂推施工過(guò)程中的臨時(shí)設(shè)施以及頂推法施工的優(yōu)缺點(diǎn)。潮白河大橋的鋼箱梁采用頂推法施工,鋼箱梁在頂推過(guò)程中的動(dòng)態(tài)應(yīng)力監(jiān)控結(jié)果與理論值較為吻合,應(yīng)力沒(méi)有超過(guò)設(shè)定預(yù)警值。鋼箱梁頂推就位后,鋼箱梁靜態(tài)應(yīng)力監(jiān)測(cè)結(jié)果顯示,頂推到位后鋼箱梁應(yīng)力較小,在安全范圍內(nèi)。臨時(shí)墩及頂推平臺(tái)位移監(jiān)測(cè)結(jié)果顯示,4#臨時(shí)墩存在頂推過(guò)程中位移超出預(yù)警值情況,經(jīng)調(diào)整能夠滿足安全要求。臨時(shí)墩應(yīng)力監(jiān)測(cè)結(jié)果顯示,臨時(shí)墩處于壓力狀態(tài)。(2)詳細(xì)介紹了自錨式懸索橋的受力特性、計(jì)算理論及施工控制方法。通過(guò)對(duì)潮白河大橋的上部結(jié)構(gòu)施工監(jiān)控,得出以下結(jié)論:橋塔下橫梁受頂推施工影響較小,在后期監(jiān)控中可適當(dāng)放松對(duì)其監(jiān)測(cè)力度。通過(guò)對(duì)潮白河自錨式懸索橋監(jiān)測(cè)工況的加勁梁、橋塔下橫梁等構(gòu)件的施工控制方法以及應(yīng)力、變形測(cè)試數(shù)據(jù)。結(jié)果表明潮白頂推法施工河自錨式懸索鋼橋各部分在整個(gè)施工過(guò)程中狀態(tài)控制良好,達(dá)到了預(yù)想的設(shè)計(jì)效果。
[Abstract]:In recent years, with the application of self-anchored suspension bridge more and more widely, especially in China, self-anchored suspension bridge is favored by many engineers. The reason why self-anchored suspension bridge is popularized is mainly because it has beautiful bridge type and the construction cost is lower than other bridges in the suitable span range. However, the construction control theory and technology of self-anchored suspension bridge are relatively weak, and the research on this aspect is still relatively few at home and abroad. The existing theories, design methods and construction have yet to be tested and extracted in practical engineering. Induction and summary, engaged in this area of research is undoubtedly very meaningful. Combined with the construction process of Chaobai River self-anchored suspension bridge, the key technology and construction control in its construction are studied in this paper, and the research results with practical value are obtained. This paper provides technical support for the successful construction of Chaobai River self-anchored suspension bridge. It introduces in detail the classification of jacking construction, the temporary facilities in the construction process and the advantages and disadvantages of the jacking construction. The steel box girder of Chaobaihe Bridge is constructed by pushing method. The dynamic stress monitoring results of the steel box girder in the process of pushing are in good agreement with the theoretical value, and the stress does not exceed the pre-warning value. The static stress monitoring results of the steel box girder show that the stress of the steel box girder is small and within the safe range. The displacement monitoring results of temporary pier and jacking platform show that the displacement of temporary pier exceeds the warning value in the process of pushing, and the adjustment can meet the safety requirements. The stress monitoring results of temporary pier show that the temporary pier is in the state of pressure.) the stress characteristics, calculation theory and construction control method of self-anchored suspension bridge are introduced in detail. By monitoring and controlling the superstructure of Chaobaihe Bridge, the following conclusions are drawn: the beam under the bridge tower is less affected by the jacking and pushing construction, and the monitoring intensity can be relaxed properly in the later period of monitoring. Through the construction control method and the test data of stress and deformation of the self-anchored suspension bridge in Chaobai River, such as stiffened beam, bridge tower beam and so on. The results show that every part of river self-anchored suspension steel bridge is well controlled in the whole construction process, which achieves the desired design effect.
【學(xué)位授予單位】:沈陽(yáng)建筑大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:U445.462
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 舒曉文,祁軍強(qiáng);伊萊·福爾肯大橋的頂推設(shè)計(jì)與施工[J];國(guó)外公路;2001年02期
2 徐化軒;頂推梁橋施工中可能出現(xiàn)的技術(shù)問(wèn)題及對(duì)策[J];鐵道工程學(xué)報(bào);2002年02期
3 徐華軒;;頂推梁橋施工中可能出現(xiàn)的技術(shù)問(wèn)題及對(duì)策[J];OVM通訊;2002年06期
4 趙如東;連續(xù)梁頂推技術(shù)的新發(fā)展[J];水運(yùn)工程;2004年03期
5 劉大洋;;頂推法施工工藝的探討[J];四川建材;2007年03期
6 陳繼光;;頂推法施工關(guān)鍵工藝改進(jìn)[J];筑路機(jī)械與施工機(jī)械化;2008年03期
7 何杰;于雪梅;;多點(diǎn)頂推在鋼筋混凝土連續(xù)箱梁中的具體應(yīng)用[J];中國(guó)建設(shè)信息;2008年08期
8 曹航;;采用頂推法施工的西德維納大橋[J];黑龍江交通科技;2011年09期
9 閔祥濤;劉濤;;橋梁頂推法施工工藝控制分析[J];現(xiàn)代商貿(mào)工業(yè);2011年23期
10 張連海;;頂推法施工橋梁[J];北方交通;2012年07期
相關(guān)會(huì)議論文 前3條
1 石毅生;;錢塘江第二大橋鐵路引橋預(yù)應(yīng)力鋼筋混凝土梁新穎單點(diǎn)頂推法[A];中國(guó)土木工程學(xué)會(huì)橋梁及結(jié)構(gòu)工程學(xué)會(huì)第九屆年會(huì)論文集[C];1990年
2 金偉;彭錦;;預(yù)應(yīng)力混凝土橋梁頂推法施工技術(shù)的理論與實(shí)踐[A];2014年4月建筑科技與管理學(xué)術(shù)交流會(huì)論文集[C];2014年
3 馬春生;李江山;郭范圍;彭向榮;;廣東省九江大橋設(shè)計(jì)[A];'95預(yù)應(yīng)力混凝土連續(xù)梁和剛構(gòu)橋?qū)W術(shù)會(huì)議論文集[C];1995年
相關(guān)重要報(bào)紙文章 前2條
1 劉三琴;一橋飛架 天塹變通途[N];南方日?qǐng)?bào);2006年
2 本報(bào)記者 沈剛 李瑾 本報(bào)特約通訊員 彭倫理 劉健 唐博學(xué);工人設(shè)計(jì)師王海[N];工人日?qǐng)?bào);2004年
相關(guān)博士學(xué)位論文 前1條
1 牛輝;空間拱肋組合橋梁頂推施工技術(shù)研究[D];浙江大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 劉承啟;三拱肋下承式鋼拱橋頂推施工關(guān)鍵技術(shù)研究[D];西南交通大學(xué);2015年
2 姚永鶴;大跨徑預(yù)應(yīng)力混凝土連續(xù)梁橋無(wú)跨中臨時(shí)墩頂推施工技術(shù)研究[D];浙江工業(yè)大學(xué);2014年
3 楊興華;頂推法施工自錨式懸索橋關(guān)鍵技術(shù)與控制[D];沈陽(yáng)建筑大學(xué);2015年
4 李洪明;跨鐵路鋼箱梁橋頂推法施工關(guān)鍵技術(shù)研究[D];西南交通大學(xué);2013年
5 楊輝;鋼箱梁步履式平移頂推受力特性與施工技術(shù)[D];南昌大學(xué);2010年
6 楊磊;混凝土斜連續(xù)梁頂推施工期風(fēng)險(xiǎn)評(píng)估與預(yù)防措施[D];長(zhǎng)沙理工大學(xué);2012年
7 徐甜;大跨度鋼箱梁頂推受力特性及監(jiān)測(cè)控制研究[D];長(zhǎng)沙理工大學(xué);2011年
8 龍煈;長(zhǎng)沙市福元路湘江大橋提籃式拱橋拼裝與頂推的控制技術(shù)[D];長(zhǎng)沙理工大學(xué);2012年
9 王鶴;下塢薊運(yùn)河特大橋7跨連續(xù)梁頂推施工技術(shù)研究[D];中南大學(xué);2012年
10 付書(shū)林;超重車超長(zhǎng)連續(xù)梁橋組拼頂推新技術(shù)研究[D];華東交通大學(xué);2011年
,本文編號(hào):1978401
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/1978401.html