多哈新港超大面積基坑滲透特性現(xiàn)場試驗(yàn)研究
本文選題:港口 + 基坑; 參考:《施工技術(shù)》2017年S1期
【摘要】:卡塔爾多哈新港地處卡塔爾MASAEED工業(yè)城內(nèi)為內(nèi)挖式港口,包括集裝箱碼頭、散貨碼頭、汽車碼頭、牲畜碼頭、海事碼頭等。港池開挖施工后基坑止降水成為該工程面臨的較大的問題之一。為了探明多哈新港挖入式港池開挖區(qū)域的地層滲透性,依據(jù)井點(diǎn)降水理論結(jié)合現(xiàn)場抽水試驗(yàn)數(shù)據(jù),并建立滲透計(jì)算模型計(jì)算地層滲透系數(shù);通過壓水試驗(yàn)進(jìn)一步分析該地區(qū)的地層滲透特性,為基坑止降水提供充分的數(shù)據(jù)。
[Abstract]:The new port of Doha, Qatar, is located in the MASAEED industrial city of Qatar. It is an internally excavated port, including container terminal, bulk terminal, automobile terminal, livestock terminal, maritime terminal and so on. One of the major problems of this project is to prevent the foundation pit from dewatering after the excavation of the harbor pool. In order to find out the formation permeability of the excavated reservoir in Doha Newport, according to well point precipitation theory and field pumping test data, the formation permeability coefficient is calculated by establishing a permeability calculation model. In order to provide sufficient data for foundation pit dewatering, the permeation characteristics of stratum in this area are further analyzed by water pressure test.
【作者單位】: 中交四航局第二工程有限公司;中國交通建設(shè)股份有限公司;
【分類號】:U655.54
【相似文獻(xiàn)】
相關(guān)期刊論文 前8條
1 章榮國;梅奇;;緬甸船廠抽水試驗(yàn)井壁坍塌原因分析及處理措施[J];上海地質(zhì);2006年02期
2 何建友;盛初根;田敏娟;;抽水試驗(yàn)確定隧道巖層滲透系數(shù)[J];勘察科學(xué)技術(shù);2007年06期
3 王首智;;某高速公路工程地質(zhì)勘察抽水試驗(yàn)探討[J];山西建筑;2010年31期
4 章榮國;王愿;劉擎;孟軍;;緬甸某船塢工程現(xiàn)場抽水試驗(yàn)及基坑降水方案[J];淮陰工學(xué)院學(xué)報(bào);2006年03期
5 黎藝明;韋文慧;李才;;群井抽水試驗(yàn)及地面沉降分析在天津某地鐵車站中的應(yīng)用[J];鐵道建筑;2011年11期
6 段衍偉;李守德;王保田;;二元地基基坑抽水試驗(yàn)及數(shù)值分析[J];水利與建筑工程學(xué)報(bào);2014年01期
7 張瑩;張明紅;李東;;抽水試驗(yàn)在某二級公路隧道工程地質(zhì)勘察中的應(yīng)用[J];地質(zhì)災(zāi)害與環(huán)境保護(hù);2013年02期
8 郭立華;;南京長江過江隧道明挖段深基坑降水抽水試驗(yàn)技術(shù)[J];山東交通科技;2010年02期
相關(guān)碩士學(xué)位論文 前1條
1 宋楠;橋梁墩臺施工對既有鐵路穩(wěn)定性影響的研究[D];河北工業(yè)大學(xué);2015年
,本文編號:1911849
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/1911849.html