天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 科技論文 > 路橋論文 >

矮塔斜拉橋施工控制及受力分析研究

發(fā)布時(shí)間:2018-02-27 23:03

  本文關(guān)鍵詞: 矮塔斜拉橋 有限元 應(yīng)力 線形 索力 出處:《合肥工業(yè)大學(xué)》2017年碩士論文 論文類型:學(xué)位論文


【摘要】:矮塔斜拉橋是由主梁、拉索和索塔組合而成的體系橋梁,從結(jié)構(gòu)特性上來(lái)看矮塔斜拉橋是介于連續(xù)梁橋與斜拉橋之間的一種橋型,兼具連續(xù)梁橋的剛性和斜拉橋的柔性,在工程中具有很大的應(yīng)用潛力。本文以某在建矮塔斜拉橋?yàn)檠芯勘尘?利用MIDAS CIVIL建立全橋有限元模型對(duì)其整體分析,利用MIDAS FEA進(jìn)行局部分析。具體研究?jī)?nèi)容可以概括為以下幾點(diǎn):(1)用MIDAS CIVIL建立矮塔斜拉橋全橋模型,重點(diǎn)分析該矮塔斜拉橋在幾個(gè)重要工況下的受力狀況,為今后施工監(jiān)控工作提供理論數(shù)據(jù)。(2)建立全橋完整模型與不包含下部結(jié)構(gòu)的全橋簡(jiǎn)化模型,通過(guò)比較兩種模型在最大懸臂狀態(tài)下以及成橋狀態(tài)下的主梁撓度、主梁應(yīng)力,判斷簡(jiǎn)化全橋模型的可行性與精準(zhǔn)度。(3)對(duì)結(jié)構(gòu)進(jìn)行參數(shù)敏感性分析,為施工過(guò)程中采取的針對(duì)性措施并完成施工控制提供理論依據(jù)。(4)對(duì)提前拆除邊跨滿堂支架以及推遲拆除墩梁臨時(shí)錨固工況進(jìn)行有限元模擬,通過(guò)對(duì)比主梁豎向位移、主梁應(yīng)力以及斜拉索索力的變化,確定提前拆除邊跨滿堂支架和推遲拆除墩梁臨時(shí)錨固對(duì)整個(gè)橋梁受力狀態(tài)以及線形的影響,為優(yōu)化施工方案提供理論依據(jù)。(5)用MIDAS FEA軟件建立托架有限元模型,計(jì)算0#塊第一層混凝土硬化后承受自重荷載能力和已硬化成型的0#塊第一層在澆筑0#塊第二層過(guò)程中承擔(dān)荷載能力,為托架優(yōu)化設(shè)計(jì)提供理論依據(jù)。(6)用MIDAS FEA軟件分別建立主塔J1索鞍區(qū)與J9索鞍區(qū)的有限元模型,研究索鞍區(qū)混凝土應(yīng)力分布狀態(tài),分析出薄弱區(qū)。通過(guò)對(duì)比J9索鞍區(qū)簡(jiǎn)化模型與J9索鞍基準(zhǔn)模型計(jì)算結(jié)果,驗(yàn)證了簡(jiǎn)化模型的可靠性和合理性。
[Abstract]:Low tower cable-stayed bridge is a system bridge composed of main beam, cable and cable tower. In terms of structural characteristics, the low tower cable-stayed bridge is a bridge type between continuous girder bridge and cable-stayed bridge. It has the rigidity of continuous beam bridge and the flexibility of cable-stayed bridge. It has great application potential in engineering. In this paper, the finite element model of the whole bridge is established by using MIDAS CIVIL to analyze the whole structure of a short tower cable-stayed bridge under construction. Using MIDAS FEA to carry out local analysis. The specific research contents can be summarized as follows: 1) using MIDAS CIVIL to establish the full bridge model of the cable-stayed bridge with low tower, the stress condition of the cable-stayed bridge with low tower under several important working conditions is analyzed emphatically. To provide theoretical data for construction monitoring and control work in the future, the complete model of the whole bridge and the simplified model of the whole bridge without the substructure are established. The deflection of the main beam and the stress of the main beam under the maximum cantilever state and the completed state of the bridge are compared between the two models. To determine the feasibility and accuracy of the simplified full-bridge model. In order to provide theoretical basis for the targeted measures taken in the construction process and complete the construction control, the finite element simulation is carried out on the condition of removing the side span full hall support in advance and delaying the removal of temporary anchoring of the pier beam, and the vertical displacement of the main beam is compared. The stress of the main beam and the change of the cable force are determined to determine the influence of removing the side span full hall support in advance and the temporary anchoring of the pier beam on the stress state and the linear shape of the whole bridge. The finite element model of bracket is established with MIDAS FEA software. The capacity of the first story concrete of 0# block to bear self-weight load after hardening and the loading capacity of the first story of the hardened block to bear the load in the process of pouring the second floor of the block of 0# are calculated. The finite element models of J1 cable saddle region and J9 cable saddle zone of main tower are established by MIDAS FEA software, and the stress distribution of concrete in cable saddle region is studied. The weak zone is analyzed and the reliability and rationality of the simplified model are verified by comparing the results of the simplified model of J9 cable saddle region with that of the reference model of J9 cable saddle.
【學(xué)位授予單位】:合肥工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:U445.4

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 劉傲;吳旭彪;宋軍;;矮塔斜拉橋索塔錨固區(qū)局部受力性能[J];山西建筑;2016年20期

2 鄧國(guó)良;陳靜;鄧文琴;梁志雯;;波形鋼腹板組合結(jié)構(gòu)矮塔斜拉橋的發(fā)展與應(yīng)用[J];中外公路;2016年03期

3 李連生;;現(xiàn)澆箱梁0~#塊三角托架的有限元分析[J];低溫建筑技術(shù);2014年09期

4 杜耀輝;;淺析懸臂現(xiàn)澆連續(xù)剛構(gòu)橋施工監(jiān)控和施工控制有機(jī)結(jié)合的重要性[J];公路;2014年09期

5 田小路;;大體積0~#塊二次澆筑托架法應(yīng)用研究[J];鐵道建筑;2014年01期

6 曹愛(ài)虎;胡成;殷濤;李輝;;施工工藝變化對(duì)斜拉橋施工監(jiān)控的影響分析[J];安徽建筑工業(yè)學(xué)院學(xué)報(bào)(自然科學(xué)版);2013年01期

7 蘇衛(wèi)國(guó);劉劍;;現(xiàn)澆箱梁高支模滿堂支架的有限元分析[J];華南理工大學(xué)學(xué)報(bào)(自然科學(xué)版);2013年02期

8 陳域;涂光亞;;四塔高墩PC斜拉橋施工控制中的參數(shù)敏感性分析[J];中外公路;2012年03期

9 李年維;;矮塔斜拉橋索塔拉索區(qū)局部應(yīng)力分析[J];煤炭技術(shù);2011年11期

10 廖子平;;從Sunniberg橋梁看矮塔斜拉橋的設(shè)計(jì)[J];企業(yè)技術(shù)開(kāi)發(fā);2010年07期

相關(guān)會(huì)議論文 前2條

1 陳從春;肖汝誠(chéng);;矮塔斜拉橋幾個(gè)問(wèn)題的探討及發(fā)展展望[A];中國(guó)公路學(xué)會(huì)橋梁和結(jié)構(gòu)工程分會(huì)2005年全國(guó)橋梁學(xué)術(shù)會(huì)議論文集[C];2005年

2 嚴(yán)國(guó)敏;;論“部分斜拉橋”的特性與應(yīng)用[A];中國(guó)土木工程學(xué)會(huì)橋梁及結(jié)構(gòu)工程學(xué)會(huì)第十二屆年會(huì)論文集(上冊(cè))[C];1996年

相關(guān)博士學(xué)位論文 前1條

1 黃燦;基于幾何控制法的大跨度斜拉橋自適應(yīng)施工控制體系研究[D];西南交通大學(xué);2011年

相關(guān)碩士學(xué)位論文 前10條

1 朱坦;矮塔斜拉橋施工監(jiān)控計(jì)算及分析[D];合肥工業(yè)大學(xué);2016年

2 姜洪偉;波形鋼腹板部分斜拉橋靜力與參數(shù)敏感性分析[D];東北林業(yè)大學(xué);2016年

3 張力;PC斜拉橋施工控制與分析[D];合肥工業(yè)大學(xué);2016年

4 徐大鵬;矮塔斜拉橋靜動(dòng)力特性及橋塔局部分析[D];合肥工業(yè)大學(xué);2016年

5 米良;連續(xù)剛構(gòu)橋施工監(jiān)控分析研究[D];重慶交通大學(xué);2015年

6 楊帥;三塔鋼箱梁斜拉橋施工控制關(guān)鍵技術(shù)及其參數(shù)敏感性研究[D];華南理工大學(xué);2015年

7 雷忠偉;矮塔斜拉橋結(jié)構(gòu)參數(shù)敏感性分析[D];東北林業(yè)大學(xué);2015年

8 陳新培;矮塔斜拉橋施工控制技術(shù)研究[D];東北林業(yè)大學(xué);2015年

9 馮冠杰;預(yù)應(yīng)力混凝土連續(xù)梁橋的施工監(jiān)控[D];鄭州大學(xué);2013年

10 于可鑫;大跨連續(xù)梁橋懸臂施工空間應(yīng)力分析[D];東北林業(yè)大學(xué);2013年

,

本文編號(hào):1544698

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/1544698.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶760ad***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com