天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 科技論文 > 路橋論文 >

分體式沉井水平荷載作用下長期力學(xué)行為分析

發(fā)布時(shí)間:2018-01-12 22:16

  本文關(guān)鍵詞:分體式沉井水平荷載作用下長期力學(xué)行為分析 出處:《東南大學(xué)》2015年碩士論文 論文類型:學(xué)位論文


  更多相關(guān)文章: 分體式沉井 土體蠕變 長期力學(xué)行為 PIV技術(shù) P-Y曲線 數(shù)值擬合 LPILE


【摘要】:分體式沉井是一種新型的基礎(chǔ)形式,本課題依托國家973計(jì)劃課題“特大跨橋梁全壽命災(zāi)變控制與性能設(shè)計(jì)的基礎(chǔ)研究”子課題“復(fù)雜環(huán)境下深水基礎(chǔ)承載行為演化與長期性能設(shè)計(jì)”,以室內(nèi)模型試驗(yàn)為基礎(chǔ),研究了分體式沉井在水平荷載作用下的長期力學(xué)行為,開展的主要內(nèi)容和成果如下:1、分體式沉井由于前、后兩個(gè)沉井的協(xié)同作用,相比于等體積的單體沉井大大提高了基礎(chǔ)的抗傾覆能力,在相同的水平荷載作用下,基礎(chǔ)的轉(zhuǎn)動(dòng)中心下移,使得分體式沉井以平動(dòng)為主伴隨有輕微轉(zhuǎn)動(dòng),而普通單體沉井有較明顯的傾覆;2、設(shè)計(jì)并進(jìn)行了砂土中分體式沉井前、后沉井之間合理間距選擇的室內(nèi)模型試驗(yàn),發(fā)現(xiàn)前、后兩個(gè)沉井之間的合理間距約為荷載作用方向單體小沉井邊長的2倍;3、通過室內(nèi)飽和粘土中的全模型試驗(yàn),發(fā)現(xiàn)分體式沉井水平荷載的影響范圍約為荷載作用方向基礎(chǔ)長度(該長度包含兩個(gè)沉井之間的土體長度)的2倍;4、設(shè)計(jì)并進(jìn)行了重塑飽和粘土中分體式沉井的全模型和半模型試驗(yàn),采用傳統(tǒng)與薄膜壓力傳感器相結(jié)合的試驗(yàn)方法以及PIV技術(shù),研究并分析了水平荷載長期作用下,分體式沉井的水平位移、前后兩個(gè)沉井側(cè)壁與底部的土壓力分布情況以及它們隨時(shí)間的演變規(guī)律,為建立分體式沉井水平荷載長期作用下考慮土體蠕變效應(yīng)的設(shè)計(jì)理論提供參考;5、通過對水平長期試驗(yàn)數(shù)據(jù)的擬合,得出考慮土體蠕變效應(yīng),分體式沉井計(jì)算理論中涉及到的與水平荷載大小、荷載作用時(shí)間、沉井深度有關(guān)的P-Y曲線;6、建立了分體式沉井的簡化計(jì)算理論,通過對水平荷載和約束彎矩的分配將分體式沉井拆分為兩個(gè)單體沉井,對單體沉井考慮沉井的計(jì)算寬度,利用上述擬合得到P-Y曲線并結(jié)合Lpile軟件和Matlab編程,對荷載作用不同時(shí)間后,分體式沉井的水平承載性能進(jìn)行計(jì)算;7、運(yùn)用該理論計(jì)算方法對一工程算例進(jìn)行計(jì)算,以適應(yīng)工程的需要,表明本文提出的解決方法有一定的實(shí)用意義。
[Abstract]:Split caisson is a new basic form. This subject relies on the national 973 project "the basic research of the catastrophic control and performance design for the whole life of large span bridge". The sub-project "the evolution of bearing behavior and long-term performance design of deep water foundation under complex environment". Based on the laboratory model test, the long-term mechanical behavior of the split caisson under horizontal load is studied. The main contents and results are as follows: 1. Compared with the single caisson of equal volume, the anti-overturning ability of the foundation is greatly improved. Under the same horizontal load, the rotation center of the foundation moves down, which makes the split caisson mainly with the translational motion accompanied by slight rotation. The common single caisson has obvious overturn. 2. The laboratory model test of the reasonable distance between the split caisson and the rear caisson in sand is designed and carried out. The reasonable distance between the latter two caisson is about 2 times as long as the side length of the small caisson in the direction of load action. 3. Through the whole model test in saturated clay in laboratory, it is found that the influence range of horizontal load in split caisson is about 2 times as long as the foundation length in the direction of load action (including the soil length between two caisson wells). 4. The full-model and semi-model tests of split caisson in remolded saturated clay were designed and carried out. The traditional test method combined with membrane pressure sensor and PIV technology were adopted. This paper studies and analyzes the horizontal displacement of the split caisson, the distribution of the earth pressure on the side wall and the bottom of the two caisson wells and their evolution with time under the long-term action of horizontal load. It provides a reference for the design theory of considering the creep effect of soil under the horizontal load of split caisson for a long time. 5. By fitting the long-term horizontal test data, the P-Y curves related to horizontal load, loading time and depth of caisson are obtained considering the creep effect of soil mass and the calculation theory of split caisson. 6. The simplified calculation theory of split caisson is established. Through the distribution of horizontal load and constrained bending moment, the split caisson is divided into two single caisson, and the calculation width of single caisson is considered. The P-Y curve is obtained by the above fitting and combined with Lpile software and Matlab programming, the horizontal load-bearing performance of the split caisson is calculated after different loading time. 7. The method is used to calculate an engineering example in order to meet the needs of the project, which shows that the proposed method has certain practical significance.
【學(xué)位授予單位】:東南大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:U443.131

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 趙瑞軒;;工程施工沉井技術(shù)工藝[J];黑龍江科技信息;2012年19期

2 ;沉井糾偏實(shí)例二則[J];橋梁建設(shè);1974年04期

3 ;空氣幕沉井試驗(yàn)工程概況[J];橋梁建設(shè);1977年04期

4 高鐵宸;輕型淺沉井用空氣幕法下沉的設(shè)計(jì)與實(shí)踐[J];橋梁建設(shè);1983年02期

5 楊運(yùn)堂,伊?xí)?泵房沉井基礎(chǔ)的施工[J];鐵道建筑;2000年08期

6 陳春月;試析沉井基礎(chǔ)的施工[J];廣東水利水電;2001年06期

7 劉方治;大型沉井的糾偏[J];鐵道建筑技術(shù);2002年02期

8 王威;沉井基礎(chǔ)工程的施工[J];水利科技與經(jīng)濟(jì);2004年01期

9 范澤雄;;沉井的設(shè)計(jì)與施工要點(diǎn)[J];科技咨詢導(dǎo)報(bào);2007年25期

10 虞毅;石常青;;大型矩形沉井制作控制施工[J];吉林水利;2007年12期

相關(guān)會(huì)議論文 前10條

1 陳漢仁;;某大橋沉井基礎(chǔ)的設(shè)計(jì)施工實(shí)錄[A];高層建筑與橋梁基礎(chǔ)工程學(xué)術(shù)會(huì)議論文集[C];1989年

2 胡玉林;;鐵路沉井基礎(chǔ)糾偏預(yù)案分析及工藝[A];高速重載與普通鐵路橋隧運(yùn)營管理與檢測修理技術(shù)論文集(上冊)[C];2010年

3 劉建波;肖文福;劉鵬;楊炎華;張平;;泰州大橋中塔沉井基礎(chǔ)定位系統(tǒng)與監(jiān)控技術(shù)[A];第十九屆全國橋梁學(xué)術(shù)會(huì)議論文集(上冊)[C];2010年

4 李家法;高永芹;;灘海地區(qū)沉井封底的一種新方法[A];礦井建設(shè)與巖土工程技術(shù)新發(fā)展[C];1997年

5 朱海濤;孔凡坤;;對大橋深水基礎(chǔ)采用沉井方案之淺見[A];第二十屆全國橋梁學(xué)術(shù)會(huì)議論文集(上冊)[C];2012年

6 喬冠東;樓夢麟;;大型沉井基礎(chǔ)地震反應(yīng)分析中側(cè)向邊界的影響[A];第20屆全國結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集(第Ⅰ冊)[C];2011年

7 朱建民;龔維明;穆保崗;米長江;;馬鞍山長江大橋南錨碇沉井鋼殼底板應(yīng)力監(jiān)測[A];第十一屆全國土力學(xué)及巖土工程學(xué)術(shù)會(huì)議論文集[C];2011年

8 劉艷芬;;吉林市臨江門大橋主墩沉井基礎(chǔ)設(shè)計(jì)[A];'95預(yù)應(yīng)力混凝土連續(xù)梁和剛構(gòu)橋?qū)W術(shù)會(huì)議論文集[C];1995年

9 朱群峰;劉勝松;張凌;馮小忠;高長勝;楊守華;;大型沉井原位監(jiān)測試驗(yàn)研究[A];工程排水與加固技術(shù)理論與實(shí)踐——第七屆全國工程排水與加固技術(shù)研討會(huì)論文集[C];2008年

10 劉建波;張永濤;楊炎華;牛照;;泰州長江公路大橋深水沉井基礎(chǔ)定位下沉與控制技術(shù)研究[A];湖北省公路學(xué)會(huì)自然科學(xué)優(yōu)秀學(xué)術(shù)論文匯編(2008年——2013年)[C];2014年

相關(guān)碩士學(xué)位論文 前9條

1 朱智榮;分體式沉井水平荷載作用下長期力學(xué)行為分析[D];東南大學(xué);2015年

2 施文龍;沉井基礎(chǔ)的空間有限元數(shù)值模擬分析[D];蘭州交通大學(xué);2013年

3 薛宇開;特殊地質(zhì)條件下橋梁沉井基礎(chǔ)施工方法的研究[D];西南交通大學(xué);2004年

4 劉寧;軟土深基坑大型沉井支護(hù)結(jié)構(gòu)的數(shù)值分析研究[D];福州大學(xué);2011年

5 茍聯(lián)盟;大型沉井基礎(chǔ)與地基土共同作用研究[D];河海大學(xué);2001年

6 王明甫;根式錨碇基礎(chǔ)的非線性分析研究[D];西北農(nóng)林科技大學(xué);2010年

7 邵帥;局部沖刷影響下水中沉井基礎(chǔ)的承載性能研究[D];西南交通大學(xué);2013年

8 朱福春;根式基礎(chǔ)力學(xué)行為分析[D];合肥工業(yè)大學(xué);2006年

9 高紀(jì)兵;泰州長江公路大橋中塔深水大型沉井基礎(chǔ)施工技術(shù)[D];重慶交通大學(xué);2011年

,

本文編號(hào):1416209

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/1416209.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶e552f***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請E-mail郵箱bigeng88@qq.com