天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 科技論文 > 路橋論文 >

拉林鐵路澤當(dāng)隧道提前順利貫通

發(fā)布時(shí)間:2018-01-09 06:20

  本文關(guān)鍵詞:拉林鐵路澤當(dāng)隧道提前順利貫通 出處:《施工技術(shù)》2017年23期  論文類型:期刊論文


  更多相關(guān)文章: 澤當(dāng) 圍巖條件 高壓旋噴樁 軟弱圍巖 明洞 洞口 風(fēng)積砂 西藏自治區(qū) 乃東 項(xiàng)目施工方


【摘要】:正拉林鐵路澤當(dāng)隧道全長(zhǎng)1 378m,包括37m明洞、1 341m暗洞,位于西藏自治區(qū)山南市乃東區(qū)澤當(dāng)鎮(zhèn)境內(nèi)。由于澤當(dāng)隧道出口有接近30m的風(fēng)積砂層,圍巖條件極差,多次小范圍坍塌,現(xiàn)場(chǎng)圍巖與原設(shè)計(jì)相差甚多,導(dǎo)致變更頻繁,造成軟弱圍巖占比大。洞口地表、隧底均須采用高壓旋噴樁處理,直至2016年
[Abstract]:The Zedang tunnel of Zhenglalin railway has a total length of 1378m, including a 37m open tunnel with a dark tunnel of 1341 m. It is located in Zedang Town, Naidong District, Shannan City, Tibet Autonomous region. Because there is nearly 30 m aeolian sand layer at the exit of Zedang Tunnel, the surrounding rock condition is extremely poor, and many small areas collapse, so the surrounding rock on site is quite different from the original design. Frequent changes lead to large proportion of weak surrounding rocks. The surface and bottom of tunnel must be treated by high pressure rotary jet pile until 2016.
【分類號(hào)】:U459.1
【正文快照】: 拉林鐵路澤當(dāng)隧道全長(zhǎng)1 378m,包括37m明洞、1 341m暗洞,位于西藏自治區(qū)山南市乃東區(qū)澤當(dāng)鎮(zhèn)境內(nèi)。由于澤當(dāng)隧道出口有接近30m的風(fēng)積砂層,圍巖條件極差,多次小范圍坍塌,現(xiàn)場(chǎng)圍巖與原設(shè)計(jì)相差甚多,導(dǎo)致變更頻繁,造成軟弱圍巖占比大。洞口地表、隧底均須采用高壓旋噴樁處理,直至20

【相似文獻(xiàn)】

相關(guān)期刊論文 前1條

1 閻繼玲,李學(xué)敏;八一至澤當(dāng)公路水土流失環(huán)境影響初步研究[J];銅業(yè)工程;2005年02期

相關(guān)重要報(bào)紙文章 前2條

1 記者 張輝 實(shí)習(xí)生 楊朔 通訊員 莊輝錦;山南湖北大道延伸工程通過(guò)招投標(biāo)[N];湖北日?qǐng)?bào);2011年

2 記者 張尚華 孫文娟;科學(xué)施工創(chuàng)新思路 確保工程早日完工[N];西藏日?qǐng)?bào)(漢);2014年

,

本文編號(hào):1400316

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/1400316.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶0bf3a***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com