印度XX電站工程主機(jī)島開(kāi)發(fā)控制研究
[Abstract]:With the continuous development of science and technology and construction, the scale of construction projects is becoming larger and larger, technical, systematic and complex degree is more and more high, especially in recent years, the single installed capacity of thermal power construction projects is increasing. Domestic and foreign scholars and general contracting enterprises have deeply discussed and studied the control and implementation of general contracting projects of electric power engineering and accumulated some experience. In the execution of domestic thermal power general contract project, the practice for many years and the instruction of national standard and regulation have laid a solid foundation for the relatively complete project control system of domestic general contracting enterprise. However, in the implementation of overseas engineering projects, due to the influence of foreign engineering practices, the practices formed by local owners over the years, as well as the legal system, social and political, economic development, finance and taxation, cultural differences, geography and humanities, The restriction of custom and custom, and the influence of owner's identity and understanding, make the function of the system greatly restricted. Through the in-depth analysis of the scope, characteristics and standards of the XX power station project in India, this paper takes the three main aspects of quality, schedule and cost as the main line to design, purchase, produce, ship, install and debug instruction. Risk analysis and budget management are used to find out the characteristics and difficulties of the project implementation. Then, by using the project management method of American Project Management Association, that is, 9 knowledge systems, the control scheme suitable for project execution is established from three aspects: quality, schedule and cost. Finally, through the concrete measures, the implementation of the project is guaranteed and the goal of the project is preliminarily realized after the completion of the supply of the project, and good results are obtained.
【學(xué)位授予單位】:哈爾濱工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類(lèi)號(hào)】:TM621
【共引文獻(xiàn)】
相關(guān)博士學(xué)位論文 前10條
1 孫德棟;基于網(wǎng)絡(luò)特性分析的時(shí)間費(fèi)用權(quán)衡問(wèn)題研究[D];華北電力大學(xué);2013年
2 鄭華偉;農(nóng)村土地整理項(xiàng)目績(jī)效的形成、測(cè)度與改善[D];南京農(nóng)業(yè)大學(xué);2012年
3 王華;房地產(chǎn)開(kāi)發(fā)企業(yè)項(xiàng)目開(kāi)發(fā)決策中機(jī)會(huì)識(shí)別研究[D];中國(guó)社會(huì)科學(xué)院研究生院;2013年
4 邢睿;新疆高校大學(xué)生控?zé)煶珜?dǎo)促動(dòng)能力建設(shè)的評(píng)價(jià)研究[D];新疆醫(yī)科大學(xué);2013年
5 方建;建設(shè)項(xiàng)目業(yè)主方組織文化、知識(shí)共享對(duì)項(xiàng)目績(jī)效的影響研究[D];同濟(jì)大學(xué);2013年
6 王中華;房地產(chǎn)開(kāi)發(fā)企業(yè)項(xiàng)目開(kāi)發(fā)決策中機(jī)會(huì)識(shí)別研究[D];中國(guó)社會(huì)科學(xué)院研究生院;2013年
7 常金明;煤炭企業(yè)信息化項(xiàng)目成功與用戶參與的關(guān)聯(lián)性研究[D];中國(guó)礦業(yè)大學(xué)(北京);2014年
8 吳斌平;水利水電工程施工控制學(xué)[D];天津大學(xué);2013年
9 鄧嬌嬌;公共項(xiàng)目契約治理與關(guān)系治理的整合及其治理機(jī)理研究[D];天津大學(xué);2013年
10 潘菲菲;水利水電工程網(wǎng)絡(luò)進(jìn)度計(jì)劃輔助生成理論與方法研究[D];天津大學(xué);2013年
本文編號(hào):2375807
本文鏈接:http://sikaile.net/jingjilunwen/zhengzhijingjixuelunwen/2375807.html