【摘要】:征地拆遷項目關(guān)系錯綜復(fù)雜,關(guān)系到廣大人民群眾的切身利益和地區(qū)的和平穩(wěn)定發(fā)展,征地拆遷項目風(fēng)險管理問題已經(jīng)成為學(xué)術(shù)界和實業(yè)界關(guān)注的焦點問題。本文以項目風(fēng)險管理理論為基礎(chǔ),分析了征地拆遷項目風(fēng)險管理的相關(guān)內(nèi)容。作者根據(jù)項目風(fēng)險管理的目標(biāo)和原則,在正確識別風(fēng)險和分析風(fēng)險的基礎(chǔ)上,合理制定應(yīng)對濱江新區(qū)征地拆遷項目風(fēng)險的措施及方案,以規(guī)避和減少征地拆遷項目風(fēng)險損失。通過對濱江新區(qū)征地拆遷項目風(fēng)險的研究,得到以下結(jié)論:(1)通過工作分解法,找出了濱江新區(qū)征地拆遷項目各工作階段可能的風(fēng)險因素,并進(jìn)行分類分析。通過對項目潛在的可能風(fēng)險進(jìn)行識別、歸納,將復(fù)雜的征地拆遷項目工程風(fēng)險分解為簡單的風(fēng)險因素,并建立了濱江新區(qū)征地拆遷項目風(fēng)險評價指標(biāo)。濱江新區(qū)征地拆遷項目風(fēng)險主要包括四類風(fēng)險:社會風(fēng)險、管理風(fēng)險、成本風(fēng)險和環(huán)境風(fēng)險。(2)利用層次分析法對濱江新區(qū)征地拆遷項目風(fēng)險進(jìn)行了綜合評價,并對其評價步驟與分析進(jìn)行了詳細(xì)研究,最后確定了濱江新區(qū)征地拆遷項目風(fēng)險的總體水平為“中等”的結(jié)論。(3)通過對濱江新區(qū)征地拆遷項目風(fēng)險的識別、分析和綜合評價,在此基礎(chǔ)上提出了濱江新區(qū)征地拆遷項目風(fēng)險的應(yīng)對措施。其應(yīng)對措施主要包括:建立和完善濱江新區(qū)征地拆遷項目風(fēng)險評估機制;建立和完善濱江新區(qū)征地拆遷項目風(fēng)險管理機制;建立和完善濱江新區(qū)征地拆遷項目風(fēng)險的處置機制。本文綜合分析了濱江新區(qū)征地拆遷項目風(fēng)險,有針對性的提出了應(yīng)對該項目風(fēng)險的措施,對加強濱江新區(qū)征地拆遷項目的風(fēng)險管理起到了積極的作用,同時也可以為衡陽市或其他省市征地拆遷項目風(fēng)險管理提供借鑒和指導(dǎo)。
[Abstract]:The relationship between land acquisition and demolition project is complex, which is related to the vital interests of the broad masses and the peaceful and stable development of the region. The risk management of the land acquisition and demolition project has become the focus of attention of academia and industry. Based on the theory of project risk management, this paper analyzes the related contents of risk management of land requisition and demolition project. According to the objectives and principles of project risk management, on the basis of correctly identifying risks and analyzing risks, the author reasonably formulates the measures and schemes to deal with the risks of land expropriation and relocation projects in Binjiang New District, in order to avoid and reduce the risk loss of land requisition and removal projects. Through the study of the risk of the land acquisition and removal project in Binjiang New area, the following conclusions are obtained: (1) through the method of work decomposition, the possible risk factors in each stage of the project are found out and classified and analyzed. By identifying the potential risks of the project, the risk of the complex land requisition and removal project is decomposed into simple risk factors, and the risk evaluation index of the land acquisition and relocation project in Binjiang New District is established. The risk of land acquisition and removal project in Binjiang New area mainly includes four kinds of risks: social risk, management risk, cost risk and environmental risk. Finally, the conclusion that the overall risk level of land acquisition and relocation project in Binjiang New District is "medium" is determined. (3) through the identification, analysis and comprehensive evaluation of the risk of land requisition and relocation project in Binjiang New area, the paper makes a detailed study on its evaluation steps and analysis. On this basis, the paper puts forward the measures to deal with the risk of land expropriation and relocation project in Binjiang New District. The countermeasures include: establishing and perfecting the risk assessment mechanism of the land requisition and removal project in Binjiang New District; establishing and perfecting the risk management mechanism of the land requisition and demolition project in Binjiang New area; establishing and perfecting the disposal mechanism of the risk of the land acquisition and removal project in Binjiang New area. This paper comprehensively analyzes the risk of land acquisition and relocation project in Binjiang New District, and puts forward some measures to deal with the project risk, which plays a positive role in strengthening the risk management of the land acquisition and relocation project in Binjiang New area. At the same time, it can also provide reference and guidance for risk management of land requisition and relocation projects in Hengyang or other provinces and cities.
【學(xué)位授予單位】:南華大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:F301.3

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 李永忠;;R&D項目風(fēng)險管理的實證研究[J];技術(shù)經(jīng)濟(jì)與管理研究;2014年06期

2 劉慶斌;;當(dāng)前城市征地拆遷存在的主要問題及對策[J];城市;2012年04期

3 曹元坤;王光俊;;企業(yè)風(fēng)險管理發(fā)展歷程及其研究趨勢的新認(rèn)識[J];當(dāng)代財經(jīng);2011年01期

4 孔駿;;基于城鄉(xiāng)征地拆遷補償政策一體化的區(qū)位價補償政策研究[J];南京工業(yè)大學(xué)學(xué)報(社會科學(xué)版);2007年01期

5 郭愛請;王輝;;城鄉(xiāng)結(jié)合部被征地農(nóng)民利益保護(hù)研究[J];安徽農(nóng)業(yè)科學(xué);2007年04期

6 羅世榮,黃璐,張曉華;城市房屋拆遷中政府角色的法律分析[J];重慶建筑大學(xué)學(xué)報;2005年02期

7 朱東愷,施國慶;城市建設(shè)拆遷中的利益沖突及其調(diào)整[J];思想戰(zhàn)線;2005年01期

8 楊靜,潘承仕;農(nóng)村土地征用與農(nóng)民權(quán)益保護(hù)[J];小城鎮(zhèn)建設(shè);2004年11期

9 朱啟超,匡興華,沈永平;風(fēng)險矩陣方法與應(yīng)用述評[J];中國工程科學(xué);2003年01期

10 斯蒂格利茨;宋華琳;;自由、知情權(quán)和公共話語——透明化在公共生活中的作用[J];環(huán)球法律評論;2002年03期

相關(guān)博士學(xué)位論文 前1條

1 唐麗敏;當(dāng)前我國城市化進(jìn)程中征地拆遷矛盾研究[D];吉林大學(xué);2009年

相關(guān)碩士學(xué)位論文 前4條

1 劉琴;基于模糊故障樹模型的農(nóng)村BOT項目風(fēng)險評估[D];中國科學(xué)技術(shù)大學(xué);2014年

2 劉靜;市政建設(shè)中征地拆遷的社會風(fēng)險管理研究[D];廣西民族大學(xué);2010年

3 周中華;城市房屋拆遷中的公共利益研究[D];復(fù)旦大學(xué);2008年

4 談臨凌;城郊征地拆遷問題研究[D];重慶大學(xué);2008年



本文編號:2146088

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jingjilunwen/nongyejingjilunwen/2146088.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶3435f***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com