限電背景下光伏發(fā)電項目投資策略研究

發(fā)布時間:2019-05-24 00:17
【摘要】:光伏發(fā)電是一個新興的朝陽產(chǎn)業(yè),在綠色環(huán)保、節(jié)能減排已經(jīng)成為當(dāng)今社會可持續(xù)發(fā)展的大前提下,利用光伏發(fā)電已成為當(dāng)今世界開發(fā)新能源、緩解能源緊缺矛盾與改善生態(tài)環(huán)境的重要依托。依托豐富的太陽能資源,我國各地大力發(fā)展光伏產(chǎn)業(yè),初步形成了較為完整的光伏產(chǎn)業(yè)鏈,建成光伏電站裝機(jī)規(guī)模逐年創(chuàng)新高。然而光伏電源不同于傳統(tǒng)電源,它的輸出功率隨光照強(qiáng)度、溫度等環(huán)境因素的改變而變化,隨著光伏系統(tǒng)在電網(wǎng)中所占比例的不斷增大,其自身固有的間歇性、隨機(jī)波動性在電能質(zhì)量、系統(tǒng)安全可靠運(yùn)行、系統(tǒng)調(diào)峰及電力系統(tǒng)規(guī)劃等方面給電網(wǎng)帶來不容忽視的影響,阻礙了其在電網(wǎng)上的大規(guī)模應(yīng)用,嚴(yán)重影響了電站收益,近些年“棄光限發(fā)”尤為突出,造成了大量的資源浪費(fèi)。本文將以河北省陽原光伏發(fā)電項目為例,根據(jù)國家現(xiàn)行財稅制度和現(xiàn)行價格,按國家發(fā)改委和建設(shè)部頒發(fā)的《建設(shè)項目經(jīng)濟(jì)評價方法與參數(shù)》(第三版)等要求,并參考《風(fēng)力發(fā)電建設(shè)項目管理辦法》及《風(fēng)力發(fā)電場并網(wǎng)運(yùn)行暫行規(guī)定》進(jìn)行費(fèi)用和效益計算,考察其獲利能力、清償能力等財務(wù)狀況,以判斷其在財務(wù)上的可行性,并就限電背景下光伏發(fā)電項目投資策略展開討論。本文通過對河北省陽原光伏發(fā)電項目技術(shù)經(jīng)濟(jì)評價,并對不同限電情況下項目的投資收益率進(jìn)行分析,主要結(jié)論如下:(1)在限電背景下,可以采取對光伏組件布置進(jìn)行減裝的投資策略來有效提高項目收益率。(2)在光伏發(fā)電項目整個運(yùn)行期均限電的情況下,可采取減少光伏組件裝機(jī)容量的投資策略,當(dāng)光伏組件減裝的比例與當(dāng)?shù)叵揠姳壤喈?dāng)時,項目將達(dá)到最大的收益率。(3)在光伏發(fā)電項目運(yùn)行期頭3年均限電的情況下,可采取初期減少光伏項目的組件安裝容量,在較少的影響整體發(fā)電量的情況下,降低工程投資;待3年后取消限電時,完成組件的全部安裝工程。當(dāng)光伏組件減裝的比例與當(dāng)?shù)叵揠姳壤喈?dāng)時,項目將達(dá)到最大的收益率。
[Abstract]:Photovoltaic power generation is a new sunrise industry. Under the premise of green environmental protection, energy saving and emission reduction has become the premise of sustainable development in today's society, the use of photovoltaic power generation has become a new energy development in the world. It is an important support to alleviate the contradiction of energy shortage and improve the ecological environment. Relying on rich solar resources, the photovoltaic industry has been vigorously developed in various parts of China, and a relatively complete photovoltaic industrial chain has been initially formed, and the installed scale of photovoltaic power stations has reached a new high year by year. However, the output power of photovoltaic power supply is different from the traditional power supply, and its output power varies with the change of light intensity, temperature and other environmental factors. With the increasing proportion of photovoltaic system in the power grid, it is inherently intermittent. Random volatility can not be ignored in the aspects of power quality, safe and reliable operation of the system, system peak shaving and power system planning, which hinders its large-scale application in the power grid and seriously affects the income of the power station. In recent years, "abandoning light and limiting hair" is particularly prominent, resulting in a large number of waste of resources. This paper will take Yangyuan photovoltaic power generation project in Hebei Province as an example, according to the current fiscal and tax system and current price of the state, according to the requirements of the Economic Evaluation method and parameters of Construction Project issued by the State Development and Reform Commission and the Ministry of Construction (the third edition), etc. Referring to the measures for the Management of Wind Power Construction projects and the interim provisions on the Operation of Wind Power farms connected to the Grid, the costs and benefits are calculated, and their financial conditions, such as profitability and liquidity, are investigated in order to judge their financial feasibility. The investment strategy of photovoltaic power generation project under the background of power limitation is discussed. In this paper, based on the technical and economic evaluation of Yangyuan photovoltaic power generation project in Hebei Province, and the investment return rate of the project under different power limit conditions is analyzed, the main conclusions are as follows: (1) under the background of power limit, The investment strategy of reducing the layout of photovoltaic modules can be adopted to effectively improve the rate of return of the project. (2) under the condition that the power of photovoltaic power generation project is limited throughout the operation period, the investment strategy of reducing the installed capacity of photovoltaic modules can be adopted. When the proportion of photovoltaic module load reduction is equal to the local power limit ratio, the project will reach the maximum rate of return. (3) under the condition of power limit in the first three years of operation of photovoltaic power generation project, the installation capacity of photovoltaic project module can be reduced at an initial stage. In the case of less impact on the overall power generation, reduce the investment of the project; When the power limit is lifted after 3 years, all the installation works of the components will be completed. When the photovoltaic module is reduced by the same proportion as the local power limit, the project will achieve the maximum rate of return.
【學(xué)位授予單位】:上海交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:F406.7;F426.61

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 劉廣生;項目投資決策審計存在的問題與對策[J];石油企業(yè)管理;1996年09期

2 門寶輝,梁川;水利項目投資決策的指標(biāo)賦權(quán)模型[J];四川大學(xué)學(xué)報(工程科學(xué)版);2003年03期

3 柳邦展;大力發(fā)展咨詢中介機(jī)構(gòu),提高項目投資決策水平[J];經(jīng)濟(jì)師;2005年04期

4 宋春紅;蘇敬勤;;城建項目投資決策支持系統(tǒng)研究[J];基建優(yōu)化;2006年02期

5 馬詠梅;;農(nóng)業(yè)項目投資決策的財務(wù)與風(fēng)險分析[J];安徽科技;2006年07期

6 瞿焱;;大型項目投資決策的熵優(yōu)化模型[J];管理現(xiàn)代化;2006年05期

7 李英哲;郝桂艷;;淺談項目投資決策需要注意的幾點問題[J];農(nóng)場經(jīng)濟(jì)管理;2007年01期

8 馬立強(qiáng);高德華;;煤炭工程項目投資決策特征研究[J];中國礦業(yè);2007年08期

9 王京芳;王露;曲莎;;優(yōu)化企業(yè)環(huán)保項目投資決策的方法探析[J];科學(xué)學(xué)與科學(xué)技術(shù)管理;2008年01期

10 于文華;李遠(yuǎn)富;岳焱;;實物期權(quán)理論在項目投資決策中的應(yīng)用[J];商場現(xiàn)代化;2008年10期

相關(guān)會議論文 前10條

1 王昭文;;試論煤礦新上項目風(fēng)險防范[A];煤炭經(jīng)濟(jì)管理新論——第二屆中國煤炭經(jīng)濟(jì)管理論壇、第三屆中國煤炭經(jīng)濟(jì)管理論壇論文集(2002)[C];2002年

2 黃奇帆;盛明園;周祖根;鄭淑華;李毅華;張群芳;;上海市“七五”期間環(huán)保項目的投資決策[A];發(fā)展戰(zhàn)略與系統(tǒng)工程——第五屆系統(tǒng)工程學(xué)會年會論文集[C];1986年

3 田季員;安實;張少軍;于木林;;基于投資跳擴(kuò)散的研發(fā)項目投資決策研究[A];第十屆中國管理科學(xué)學(xué)術(shù)年會論文集[C];2008年

4 王京芳;;優(yōu)化企業(yè)環(huán)保項目投資決策的方法探析[A];2007年度中國總會計師優(yōu)秀論文選[C];2008年

5 仝允桓;萬萍;;CIMS項目多準(zhǔn)則綜合評價及財務(wù)效果后評估[A];管理科學(xué)與系統(tǒng)科學(xué)進(jìn)展——全國青年管理科學(xué)與系統(tǒng)科學(xué)論文集(第4卷)[C];1997年

6 戴大雙;;BOT項目特許決策管理[A];遼寧省哲學(xué)社會科學(xué)獲獎成果匯編[2009-2010年度][C];2013年

7 姜瓊;;巖土工程項目投資決策與經(jīng)濟(jì)效果計算[A];四川省巖石力學(xué)與工程學(xué)會首屆學(xué)術(shù)會議論文集[C];1994年

8 宋浩;楊愛國;;高速公路項目投資決策與融資框架分析[A];中國高速公路管理學(xué)術(shù)論文集(2009卷)[C];2009年

9 王桂生;岳新才;;最優(yōu)化資本預(yù)算在項目投資決策中的運(yùn)用[A];第五屆中國煤炭經(jīng)濟(jì)管理論壇暨2004年中國煤炭學(xué)會經(jīng)濟(jì)管理專業(yè)委員會年會論文集[C];2004年

10 孫瑩;竇森;;可行性研究在項目建設(shè)中的作用[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2006)[C];2006年

相關(guān)重要報紙文章 前10條

1 記者 解希民 通訊員 田進(jìn)國;從每個環(huán)節(jié)提高項目管理成效[N];中國財經(jīng)報;2011年

2 ;項目后評價 驗證城建項目之優(yōu)劣[N];中國建設(shè)報;2006年

3 林甸縣審計局 孫偉 省政府研究室 李清君;強(qiáng)化審計在產(chǎn)業(yè)項目建設(shè)中的作用[N];黑龍江日報;2012年

4 中國國土資源經(jīng)濟(jì)研究院 鄒永生;科學(xué)評價項目贏利能力和風(fēng)險[N];中國黃金報;2005年

5 王新鎖 劉娥;做好項目可行性研究[N];中國水利報;2001年

6 常國梁;大項目拉動又好又快發(fā)展[N];泰州日報;2006年

7 記者 李繼學(xué);項目決策管理廣東財政有更多聲音[N];中國財經(jīng)報;2010年

8 李武英;大型項目建設(shè)回歸本土化[N];建筑時報;2007年

9 ;項目投資決策階段的造價控制[N];中國信息報;2003年

10 本報記者 范映華 通訊員 肖彩華;探索營銷管理新模式[N];中國郵政報;2004年

相關(guān)博士學(xué)位論文 前6條

1 殷帥;我國光伏發(fā)電項目規(guī)模化發(fā)展研究[D];北京交通大學(xué);2012年

2 陳國棟;企業(yè)項目投資決策問題的不確定規(guī)劃模型及算法研究[D];北京理工大學(xué);2015年

3 夏志杰;基于組合權(quán)衡的IT項目投資決策模型及方法研究[D];同濟(jì)大學(xué);2008年

4 莊偉鋼;市場機(jī)制條件下電源項目投資決策與融資問題研究[D];東南大學(xué);2006年

5 殷愛貞;我國油氣勘探項目投資決策研究[D];中國石油大學(xué);2010年

6 陳龍;項目投資價值分析創(chuàng)新方法研究[D];廈門大學(xué);2002年

,

本文編號:2484379

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jingjilunwen/kuaiji/2484379.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶98451***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com