井工煤礦目標(biāo)作業(yè)成本管理模式的構(gòu)建
[Abstract]:The coal mine is facing the enterprise organization way brought by the rapid development of high technology and the challenge of the change of management mode. The activity based cost management method emerges as the times require to adapt to the development of the society, but also has the shortcomings of the lack of analysis of the operational relevance between the systems and the high cost of implementation. The combination of cost method to make up the shortcoming of activity-based costing. The combination of activity-based cost management and target cost management, guided by target cost, based on the activity based costing, improved the cost calculation method, improved the effectiveness of cost control and the decision of cost information, and catered to the actual demand of the cost management of the well coal mine.
【作者單位】: 中國礦業(yè)大學(xué)(北京)力學(xué)與建筑工程學(xué)院;冀中能源張家口礦業(yè)集團(tuán)有限公司;
【分類號(hào)】:F406.72;F426.21
【參考文獻(xiàn)】
相關(guān)期刊論文 前5條
1 胡元木,祝建鑫;作業(yè)成本制的實(shí)施及啟示[J];中國煤炭經(jīng)濟(jì)學(xué)院學(xué)報(bào);1999年02期
2 余雷;淺析作業(yè)成本法的局限性[J];經(jīng)濟(jì)師;2002年01期
3 寧高峰;目標(biāo)成本在煤炭企業(yè)成本管理中的應(yīng)用[J];機(jī)械管理開發(fā);2004年04期
4 高文贊;;淺談煤炭企業(yè)的作業(yè)成本預(yù)算控制[J];煤炭經(jīng)濟(jì)研究;2009年02期
5 王吉文,李明富;煤炭基建企業(yè)目標(biāo)成本的管理與控制[J];中國煤炭;2001年11期
【共引文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王友貴;論質(zhì)量成本[J];安慶師范學(xué)院學(xué)報(bào)(社會(huì)科學(xué)版);2000年05期
2 俞靜,錢省三;半導(dǎo)體晶圓車間的成本控制方法[J];半導(dǎo)體技術(shù);2003年08期
3 李健生;;目標(biāo)成本法在房地產(chǎn)開發(fā)項(xiàng)目成本管理中的應(yīng)用[J];北方經(jīng)濟(jì);2009年20期
4 左興睿,張志鳳;淺析作業(yè)成本管理與成本策劃[J];北京機(jī)械工業(yè)學(xué)院學(xué)報(bào);2001年04期
5 駱s,
本文編號(hào):2159248
本文鏈接:http://sikaile.net/jingjilunwen/kuaiji/2159248.html