基于風險分析和模糊專家系統(tǒng)的超高壓基建工程不可預見費估算
發(fā)布時間:2018-03-19 21:06
本文選題:風險分析 切入點:模糊專家系統(tǒng) 出處:《水電能源科學》2013年01期 論文類型:期刊論文
【摘要】:針對工程項目投資中采用現(xiàn)有的方法估算不可預見費存在的不足,以超高壓基建工程為例,構(gòu)建了不可預見費估算理論模型,分析了超高壓基建工程實施過程中存在的風險,并對各風險進行分類篩選,進而確定風險等級,再利用模糊專家系統(tǒng)估算工程的不可預見費。算例應用結(jié)果表明,基于風險分析和模糊專家系統(tǒng)來估算超高壓基建工程不可預見費用的方法可行、有效,且估算誤差均在10%以內(nèi)。
[Abstract]:In view of the shortcomings of using the existing methods to estimate the unforeseen cost in the investment of the project, taking the UHV capital construction project as an example, the theoretical model of the unforeseeable cost estimation is constructed, and the risks in the implementation process of the UHV capital construction project are analyzed. The risk is classified and screened, and the risk grade is determined, and then the unpredictable cost of the project is estimated by using the fuzzy expert system. The application results show that, Based on the risk analysis and fuzzy expert system, the method of estimating the unforeseen cost of UHV infrastructure project is feasible and effective, and the estimation error is less than 10%.
【作者單位】: 中國南方電網(wǎng)超高壓輸電公司廣州局;華北電力大學能源與電力經(jīng)濟研究咨詢中心;
【分類號】:TU271.1;F285
【參考文獻】
相關(guān)期刊論文 前4條
1 鄭亞林,黃德隆,郭健;Fuzzy推理的Mamdani算法[J];寶雞文理學院學報(自然科學版);2001年03期
2 蘇羽,趙海,蘇威積,張曉丹;基于模糊專家系統(tǒng)的評估診斷方法[J];東北大學學報;2004年07期
3 張道國;耿慶申;王寧寧;;電網(wǎng)建設(shè)全過程造價變動的原因及控制措施[J];能源技術(shù)經(jīng)濟;2011年10期
4 吳釗,尹朝慶;模糊專家系統(tǒng)推理機設(shè)計[J];武漢化工學院學報;2003年01期
相關(guān)碩士學位論文 前1條
1 胡白雪;超高壓及特高壓輸電線路的電磁環(huán)境研究[D];浙江大學;2006年
【共引文獻】
相關(guān)期刊論文 前10條
1 牛榮;;基于.NET技術(shù)的棉花種植專家系統(tǒng)的設(shè)計[J];安徽農(nóng)業(yè)科學;2008年08期
2 吳希讓,吳國s,
本文編號:1636000
本文鏈接:http://sikaile.net/jingjilunwen/kuaiji/1636000.html
最近更新
教材專著