政府投資項(xiàng)目代建模式激勵(lì)機(jī)制研究
[Abstract]:With the deepening reform of the investment system, the agent construction management mode has been gradually popularized in the government investment projects in China. In the current agent construction mode, the government investors and the agent constructors determine the principal-agent relationship by signing the agent construction contract. This is because the amount of information that the agent and the construction party have is not equal, so it is easy to produce the problem of moral hazard and adverse selection of the agent. Effective incentive mechanism can consider the interests of both government investors and agent builders at the same time, and make the behavior of agent builders more standardized, minimize the loss of benefits brought by the principal-agent problem to investment projects, better achieve the objectives that the government investors want to achieve, so that the agent construction system measures can be more efficient to meet the reality. The main research methods used in this paper are literature consulting method, analytic hierarchy process, system analysis method, etc. By using these methods, the problems existing in the agent construction system and the selection mode of the agent, the explicit incentive mechanism and implicit incentive mechanism of the agent construction system are discussed in depth. (1) The principal-agent in the agent modeling mode is discussed. Firstly, the principal-agent relationship between the two sides in the agent construction system of government investment projects is analyzed. Secondly, the content of agent performance evaluation is studied. Thirdly, the index system of agent performance evaluation is analyzed. Finally, the method of agent performance evaluation is discussed. (2) Analyze and study the incentive mechanism of agent modeling, and improve the design. Firstly, analyze the shortcomings of the current model and the particularity of the model. Secondly, study the effect of each factor of the incentive mechanism of agent modeling. Thirdly, advance the incentive model of agent from explicit incentive and implicit incentive respectively. Finally, in view of the current situation of the incentive mechanism of the agent construction system in various regions of China, the paper puts forward the improvement of the incentive mechanism of the agent construction system from the aspects of explicit incentive, implicit incentive, law and policy, agent market and so on. (3) Aiming at a middle school education building agent construction project in Xi'an, the paper analyzes the incentive mechanism of the agent construction system. First of all, the incentive content in the contract is analyzed and perfected. Secondly, the content of performance evaluation in the case is studied, problems are found and suggestions are put forward. Thirdly, other problems in the case are summarized and solved. Finally, we will observe the improved results, so that the incentive mechanism can give full play to its due role.
【學(xué)位授予單位】:重慶交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:F283
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 牛錚錚;;代建制項(xiàng)目管理模式下代建人的選擇[J];建筑設(shè)計(jì)管理;2006年05期
2 廖永利;;淺談項(xiàng)目代建人的風(fēng)險(xiǎn)管理機(jī)制[J];科技創(chuàng)新導(dǎo)報(bào);2009年16期
3 白俊峰;尹貽林;陳伯樂(lè);;基于委托代理理論的代建人取費(fèi)模型研究[J];統(tǒng)計(jì)與決策;2009年11期
4 王緩緩;胡斌;譚石海;;基于集成模擬的代建人的組織設(shè)計(jì)研究[J];工業(yè)工程與管理;2009年04期
5 林義鋒;張宏勝;張文平;;基于矩陣法的代建人在施工階段的風(fēng)險(xiǎn)管理[J];重慶工商大學(xué)學(xué)報(bào)(自然科學(xué)版);2010年03期
6 欒嵐;傅國(guó)忠;刁春榮;;基于信任機(jī)制的代建人選擇研究[J];沈陽(yáng)建筑大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2011年03期
7 鄧嬌嬌;鄧新位;嚴(yán)玲;;公共項(xiàng)目代建人激勵(lì)的關(guān)鍵治理因子:一個(gè)實(shí)證研究[J];預(yù)測(cè);2013年05期
8 張耐華;;試析代建人的激勵(lì)與約束[J];價(jià)值工程;2013年28期
9 李長(zhǎng)召;;各專業(yè)公司做好代建人的風(fēng)險(xiǎn)與對(duì)策分析[J];企業(yè)技術(shù)開(kāi)發(fā);2014年03期
10 蘭定筠;李世蓉;;政府委托人與代建人的風(fēng)險(xiǎn)分配研究[J];建筑經(jīng)濟(jì);2007年07期
相關(guān)會(huì)議論文 前2條
1 胡士星;王晶晶;高洋;;招標(biāo)選擇代建人現(xiàn)狀分析[A];跨越發(fā)展:七省市第十屆建筑市場(chǎng)與招標(biāo)投標(biāo)優(yōu)秀論文集[C];2010年
2 吳定遠(yuǎn);王亮;;基于系統(tǒng)動(dòng)力學(xué)的代建人合理利潤(rùn)研究[A];Proceedings of the 4th International Conference on Engineering and Business Management[C];2013年
相關(guān)重要報(bào)紙文章 前10條
1 記者 李媛 通訊員 宣永祥;“代建制”急需高素質(zhì)全方位的代建人[N];建筑時(shí)報(bào);2006年
2 楊東民;“代建人”:風(fēng)險(xiǎn)大于收益?[N];建筑時(shí)報(bào);2006年
3 本報(bào)記者 劉魁;代建人為何叫苦不迭[N];中華建筑報(bào);2008年
4 本報(bào)記者 張子麟;風(fēng)險(xiǎn)大于收益“代建制”推行中的一道坎[N];中國(guó)經(jīng)濟(jì)導(dǎo)報(bào);2005年
5 本報(bào)記者 陳靜思;代建制:帶著希冀上路[N];中華建筑報(bào);2006年
6 北京國(guó)金管理咨詢有限公司 劉占鳳;從工體場(chǎng)、館奧運(yùn)改造工程代建的經(jīng)歷談對(duì)“代建制”的體會(huì)[N];中華建筑報(bào);2008年
7 陳硯祥;“代建制”模式須破四大難題[N];建筑時(shí)報(bào);2008年
8 浦東新區(qū)檢察院預(yù)防處 徐建華;“代建制”:預(yù)防職務(wù)犯罪的良藥[N];建筑時(shí)報(bào);2004年
9 本版編輯 錦雯 向觀 中國(guó)經(jīng)濟(jì)技術(shù)投資擔(dān)保有限公司 詹倫波;實(shí)施四年成效斐然 存在問(wèn)題亟待紓解[N];廣東建設(shè)報(bào);2008年
10 楊青山;公路建設(shè)首施“代建制”[N];建筑時(shí)報(bào);2007年
相關(guān)博士學(xué)位論文 前1條
1 蘭定筠;政府投資項(xiàng)目代建制制度設(shè)計(jì)研究[D];重慶大學(xué);2008年
相關(guān)碩士學(xué)位論文 前10條
1 路浩;基于績(jī)效預(yù)測(cè)的公共工程代建人選擇研究[D];西南交通大學(xué);2015年
2 吳量;企業(yè)型代建模式下代建人特征要素對(duì)項(xiàng)目控制權(quán)配置的影響研究[D];天津理工大學(xué);2015年
3 程琳;涉鐵項(xiàng)目代建人風(fēng)險(xiǎn)管理研究[D];山東大學(xué);2015年
4 戚慧嬌;政府投資項(xiàng)目代建模式激勵(lì)機(jī)制研究[D];重慶交通大學(xué);2014年
5 杜紹玲;企業(yè)代建模式下非經(jīng)營(yíng)性公共項(xiàng)目代建人激勵(lì)研究[D];天津理工大學(xué);2009年
6 鄧嬌嬌;政府投資項(xiàng)目代建人的激勵(lì)機(jī)制研究[D];天津理工大學(xué);2007年
7 張碩;政府投資項(xiàng)目代建人激勵(lì)模型及管理機(jī)制研究[D];華北電力大學(xué);2014年
8 趙華;政府投資項(xiàng)目投資人與代建人風(fēng)險(xiǎn)分擔(dān)機(jī)制研究[D];天津理工大學(xué);2009年
9 張傳棟;大型項(xiàng)目的代建人風(fēng)險(xiǎn)管理研究[D];天津理工大學(xué);2007年
10 柯琪;代建制在新區(qū)建設(shè)中的應(yīng)用研究[D];西安建筑科技大學(xué);2008年
,本文編號(hào):2208118
本文鏈接:http://sikaile.net/jingjilunwen/jingjiguanlilunwen/2208118.html