基于GO法的配電網(wǎng)繼電保護(hù)系統(tǒng)可靠性研究
[Abstract]:At present, as the master of the national economy, the importance of the reliability of power grid is self-evident. Distribution network is the most fluctuating network in the power system, how to ensure its reliability will be a difficult task. As there are more primary circuit equipments, which is the focus of the system reliability research, with the increase of relay protection equipment in the secondary system, the maloperation or failure of the relay protection equipment will cause a chain reaction of faults, so its reliability is gradually becoming more and more important. Equipment failure rate is also high, but its reliability is easy to be ignored. At present, the reliability analysis of relay protection device is not mature enough. In this paper, the main factors that affect the equipment are highlighted, and the reliability modeling method is adopted, and a successful oriented reliability analysis method, GO method, is used. It is applied to reliability analysis of relay protection system in Jinjialing 110kV substation in Huainan. According to the actual data of Huainan local substation, the whole process risk assessment and management system of relay protection is designed, so as to improve the management level of reliable operation of power network. In this paper, the reliability evaluation methods of distribution network are summarized firstly, and the advantages of GO reliability analysis are highlighted by comparing several commonly used reliability algorithms. In this paper, the GO method is put forward. Firstly, the basic principle of GO method is introduced. The GO method is applied to the reliability evaluation of the relaying equipment of Jinjialing 110kV substation in Huainan through an example. By collecting the original and basic data of the equipment during the operation of the protection system and drawing the corresponding GO model according to the characteristics of the schematic diagram of the relay protection device, the calculation formula is listed through the analysis of the model, and the output results of the system are calculated by using the collected data. Display the status of the equipment and evaluate the quality of the system; The feasibility and uniqueness of GO method in the reliability analysis of relay protection system are obtained by comparing the statistical data of previous years with the calculated data. According to the above analysis, aiming at the defects of the traditional relay protection system in equipment evaluation and maintenance, a relay protection reliability evaluation management system is developed, which can be used for real-time on-line monitoring. Reducing overrepair and underrepair caused by insufficient judgment of equipment integrity; The test of Huainan local substation shows that the software is fast, convenient and effective in analysis and use. Therefore, it can bring long-term development for the practical application of system reliability and play an important role in local economic development.
【學(xué)位授予單位】:安徽理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM77
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;《工程系統(tǒng)可靠性分析基礎(chǔ)》簡(jiǎn)介[J];湖南大學(xué)學(xué)報(bào)(自然科學(xué)版);1988年02期
2 黃洪鐘;機(jī)械系統(tǒng)可靠性分析的模糊故障樹(shù)方法[J];四川工業(yè)學(xué)院學(xué)報(bào);1994年02期
3 曾亮;立方體表示方法及其在多狀態(tài)系統(tǒng)可靠性分析中的應(yīng)用[J];質(zhì)量與可靠性;2000年06期
4 蔡琦,陳文振,孫豐瑞;熱力系統(tǒng)可靠性分析的問(wèn)題與對(duì)策[J];熱能動(dòng)力工程;2001年06期
5 辛開(kāi)遠(yuǎn);系統(tǒng)可靠性分析講座(續(xù)一)[J];水利電力機(jī)械;2002年06期
6 李巖;王社偉;;一種新型的多階段任務(wù)系統(tǒng)可靠性分析方法[J];計(jì)算機(jī)仿真;2008年01期
7 宋冬利;張衛(wèi)華;何平;周寧;;多狀態(tài)多模式機(jī)械系統(tǒng)可靠性分析模型[J];鐵道學(xué)報(bào);2012年09期
8 莫毓昌;趙建民;韓建民;鐘發(fā)榮;;階段任務(wù)系統(tǒng)可靠性分析30a研究進(jìn)展[J];浙江師范大學(xué)學(xué)報(bào)(自然科學(xué)版);2013年03期
9 李桂青,王東煒;基于系統(tǒng)可靠性分析的區(qū)域震后功能預(yù)測(cè)研究[J];土木工程學(xué)報(bào);1992年06期
10 陳國(guó)華;金國(guó)梁;;超靜定復(fù)雜結(jié)構(gòu)系統(tǒng)可靠性分析方法新探[J];機(jī)械設(shè)計(jì)與制造;1993年01期
相關(guān)會(huì)議論文 前10條
1 周虹伯;郭建英;丁喜波;;可修系統(tǒng)可靠性分析[A];2009年全國(guó)機(jī)械可靠性技術(shù)學(xué)術(shù)交流會(huì)暨第四屆可靠性工程分會(huì)成立大會(huì)論文集[C];2009年
2 王宇;王保國(guó);;汽車人-機(jī)-環(huán)境系統(tǒng)可靠性分析[A];人-機(jī)-環(huán)境系統(tǒng)工程研究進(jìn)展(第七卷)[C];2005年
3 曹起風(fēng);;結(jié)構(gòu)系統(tǒng)可靠性分析與設(shè)計(jì)方法的改革[A];工程結(jié)構(gòu)可靠性——中國(guó)土木工程學(xué)會(huì)橋梁及結(jié)構(gòu)工程學(xué)會(huì)結(jié)構(gòu)可靠度委員會(huì)全國(guó)第二屆學(xué)術(shù)交流會(huì)議論文集[C];1989年
4 劉剛;鄭云龍;;非線性剛架系統(tǒng)可靠性分析[A];第八屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集(第Ⅱ卷)[C];1999年
5 白影春;韓旭;姜潮;;基于證據(jù)理論的結(jié)構(gòu)系統(tǒng)可靠性分析[A];中國(guó)力學(xué)大會(huì)——2013論文摘要集[C];2013年
6 許春明;陳虹;夏勇;錢(qián)勇;;不同測(cè)試模式下典型系統(tǒng)可靠性分析[A];第十九屆測(cè)控、計(jì)量、儀器儀表學(xué)術(shù)年會(huì)(MCMI'2009)論文集[C];2009年
7 武小悅;;多階段任務(wù)系統(tǒng)可靠性分析研究綜述[A];2010年全國(guó)機(jī)械行業(yè)可靠性技術(shù)學(xué)術(shù)交流會(huì)暨第四屆可靠性工程分會(huì)第二次全體委員大會(huì)論文集[C];2010年
8 陶友瑞;韓旭;;基于隨機(jī)與認(rèn)知不確定性的多學(xué)科系統(tǒng)可靠性分析[A];中國(guó)力學(xué)大會(huì)——2013論文摘要集[C];2013年
9 王明星;林少芬;江小霞;;基于故障樹(shù)的攪拌站控制系統(tǒng)可靠性分析及應(yīng)用[A];2011年全國(guó)機(jī)械行業(yè)可靠性技術(shù)學(xué)術(shù)交流會(huì)暨第四屆可靠性工程分會(huì)第三次全體委員大會(huì)論文集[C];2011年
10 邵國(guó)湘;;DCS系統(tǒng)可靠性分析[A];2004電站自動(dòng)化信息化學(xué)術(shù)技術(shù)交流會(huì)議論文集[C];2004年
相關(guān)博士學(xué)位論文 前8條
1 何俐萍;基于可能性度量的機(jī)械系統(tǒng)可靠性分析和評(píng)價(jià)[D];大連理工大學(xué);2010年
2 龐煜;基于可能性理論和格論的系統(tǒng)可靠性分析[D];電子科技大學(xué);2013年
3 李建操;結(jié)構(gòu)系統(tǒng)可靠性分析的若干問(wèn)題研究[D];哈爾濱工程大學(xué);2013年
4 莫毓昌;高可靠實(shí)時(shí)多階段系統(tǒng)可靠性分析[D];哈爾濱工業(yè)大學(xué);2008年
5 安海;桁架結(jié)構(gòu)系統(tǒng)可靠性分析方法的研究[D];哈爾濱工程大學(xué);2009年
6 楊建平;證據(jù)理論及其復(fù)雜系統(tǒng)可靠性分析方法與應(yīng)用研究[D];電子科技大學(xué);2012年
7 顧永維;綜合考慮靜強(qiáng)度、疲勞和穩(wěn)定的結(jié)構(gòu)系統(tǒng)可靠性分析[D];哈爾濱工程大學(xué);2008年
8 包洪兵;結(jié)構(gòu)系統(tǒng)可靠性分析的傳力路線方法[D];南京航空航天大學(xué);2010年
相關(guān)碩士學(xué)位論文 前10條
1 張?chǎng)?模糊環(huán)境下的系統(tǒng)可靠性分析[D];安徽工業(yè)大學(xué);2015年
2 馬秀蕊;含風(fēng)力發(fā)電的電力系統(tǒng)可靠性分析[D];燕山大學(xué);2015年
3 姜明明;轉(zhuǎn)換開(kāi)關(guān)不可靠的貯備系統(tǒng)可靠性分析[D];蘭州理工大學(xué);2016年
4 路艷君;RAMI方法在中子監(jiān)測(cè)系統(tǒng)可靠性分析中的實(shí)施與優(yōu)化研究[D];西南交通大學(xué);2015年
5 劉駿;基于GO法的配電網(wǎng)繼電保護(hù)系統(tǒng)可靠性研究[D];安徽理工大學(xué);2017年
6 王展;多狀態(tài)多階段任務(wù)系統(tǒng)可靠性分析方法研究[D];電子科技大學(xué);2012年
7 雷鵬;考慮不能覆蓋失效的模糊多狀態(tài)系統(tǒng)可靠性分析[D];電子科技大學(xué);2010年
8 張旭方;隨機(jī)非線性滯回系統(tǒng)可靠性分析[D];東北大學(xué);2008年
9 王雨;基于馬爾科夫過(guò)程的可修復(fù)機(jī)械系統(tǒng)可靠性分析[D];東北大學(xué);2012年
10 高狄;具有常規(guī)錯(cuò)誤的簡(jiǎn)單混聯(lián)可修復(fù)系統(tǒng)可靠性分析[D];延邊大學(xué);2012年
,本文編號(hào):2297717
本文鏈接:http://sikaile.net/jingjilunwen/jiliangjingjilunwen/2297717.html