旅游職業(yè)學(xué)院2#學(xué)生公寓建設(shè)工程造價(jià)管理研究
[Abstract]:At present, the number of college students is increasing year by year, and the increase of the number of college students puts forward higher requirements for the conditions of running schools, which makes colleges and universities constantly improve the construction of infrastructure in order to meet their own development needs. The construction of infrastructure is a work of great investment and long-term benefit for colleges and universities, which is very important to the development of colleges and universities. Therefore, how to manage and control the investment of infrastructure construction effectively, reasonably manage the cost and maximize the benefit under the premise of safety, economy, applicability and energy saving is the key to the project construction in colleges and universities, and it is also an important problem in the development of colleges and universities. In this paper, the construction of 2 # student apartment in tourism vocational college is effectively controlled by using the principles of system science, management, (WBS), operational research, project management and the basic theory of engineering cost management, and aiming at the feasibility study and investment estimation in the early planning stage of the engineering project construction of tourism college. The scheme optimization and the application of value engineering principle in the investigation and design stage, the bill of quantities valuation and reasonable bid evaluation in the bidding stage, the construction progress and cost in the project implementation stage, and the settlement review in the completion and settlement stage are deeply analyzed, and the basic theory of the whole process cost management is explained in detail. In the whole process of cost management, relying on the actual situation of each stage of the project cost, this paper analyzes the causes of the project cost, analyzes and evaluates the risks existing in the current construction project cost management, and further puts forward the corresponding solutions in order to effectively control the project cost.
【學(xué)位授予單位】:哈爾濱理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TU723.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 馬桂芬;陸世巖;;工程竣工結(jié)算階段造價(jià)管理措施研究[J];紅水河;2013年04期
2 尹中立;;解讀新一輪房地產(chǎn)調(diào)控[J];當(dāng)代經(jīng)濟(jì)管理;2013年04期
3 何永恒;李進(jìn);;項(xiàng)目的敏感性分析[J];交通科技與經(jīng)濟(jì);2012年04期
4 李巖;;決策階段投資估算的策略與方法探討[J];山西建筑;2012年07期
5 鄭忠哲;;建設(shè)項(xiàng)目全過(guò)程工程造價(jià)控制[J];科技創(chuàng)新與應(yīng)用;2012年01期
6 李欣;查京民;李豪杰;莊洪濤;;基于案例推理的港口工程建設(shè)風(fēng)險(xiǎn)評(píng)價(jià)研究[J];港工技術(shù);2011年05期
7 李曉寧;宋妤;;基礎(chǔ)設(shè)施建設(shè)項(xiàng)目投資估算編制方法與問(wèn)題探討[J];鐵路工程造價(jià)管理;2011年04期
8 柳志慧;熊周蘭;;談工程造價(jià)管理的必要性[J];中國(guó)招標(biāo);2011年10期
9 李磊;;建設(shè)項(xiàng)目技術(shù)經(jīng)濟(jì)評(píng)價(jià)敏感性分析[J];改革與開(kāi)放;2010年24期
10 唐林鳳;;建筑工程造價(jià)快速估算的研究[J];價(jià)值工程;2010年30期
相關(guān)碩士學(xué)位論文 前9條
1 查富軍;房地產(chǎn)項(xiàng)目工程造價(jià)的控制[D];天津大學(xué);2012年
2 李紅菊;工程項(xiàng)目造價(jià)管理與實(shí)證研究[D];西安建筑科技大學(xué);2012年
3 馮仕靜;學(xué)生宿舍建設(shè)工程造價(jià)管理研究[D];長(zhǎng)沙理工大學(xué);2012年
4 劉瀟;珠三角大學(xué)生宿舍整合生態(tài)設(shè)計(jì)[D];華南理工大學(xué);2011年
5 孫傳菲;現(xiàn)代高校學(xué)生公寓優(yōu)化設(shè)計(jì)研究[D];東華大學(xué);2011年
6 胡波;對(duì)建筑工程全過(guò)程造價(jià)管理的研究[D];天津大學(xué);2010年
7 鄧瓊;高等學(xué)校學(xué)生公寓投資模式研究[D];湘潭大學(xué);2010年
8 陳蔚;建設(shè)項(xiàng)目設(shè)計(jì)階段工程造價(jià)的控制研究[D];西安建筑科技大學(xué);2007年
9 華荷鋒;高校學(xué)生社區(qū)建設(shè)研究[D];河海大學(xué);2006年
,本文編號(hào):2498554
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2498554.html