新風(fēng)供冷在南京某劇場(chǎng)建筑中的應(yīng)用
發(fā)布時(shí)間:2019-02-16 06:34
【摘要】:介紹了新風(fēng)供冷量計(jì)算方法,得到該項(xiàng)目采用新風(fēng)供冷的全年可用時(shí)間達(dá)3 226h,超過(guò)了項(xiàng)目運(yùn)營(yíng)時(shí)間的一半;其節(jié)能率達(dá)到21%,每年節(jié)省用電約140萬(wàn)kW·h。對(duì)影響新風(fēng)供冷的因素進(jìn)行了分析,提出新風(fēng)供冷時(shí)應(yīng)盡量提高室內(nèi)空氣標(biāo)準(zhǔn)和全空氣系統(tǒng)的最大新風(fēng)比。
[Abstract]:This paper introduces the calculation method of fresh air cooling quantity, and obtains that the annual available time of adopting fresh air cooling in this project is 3 226h, which is more than half of the project operation time, and its energy saving rate is 21, and the power saving is about 1.4 million kW / h per year. The factors affecting fresh air cooling are analyzed. It is suggested that the indoor air standard and the maximum fresh air ratio of the whole air system should be raised as far as possible.
【作者單位】: 華東建筑設(shè)計(jì)研究總院;
【分類號(hào)】:TU831
[Abstract]:This paper introduces the calculation method of fresh air cooling quantity, and obtains that the annual available time of adopting fresh air cooling in this project is 3 226h, which is more than half of the project operation time, and its energy saving rate is 21, and the power saving is about 1.4 million kW / h per year. The factors affecting fresh air cooling are analyzed. It is suggested that the indoor air standard and the maximum fresh air ratio of the whole air system should be raised as far as possible.
【作者單位】: 華東建筑設(shè)計(jì)研究總院;
【分類號(hào)】:TU831
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 盧向東;;淺議我國(guó)劇場(chǎng)建筑的標(biāo)志性[J];城市建筑;2010年09期
2 劉娟;;北京地區(qū)京劇劇場(chǎng)建筑選址研究[J];建筑知識(shí);2012年07期
3 王仕杰;郭新;張松;葛為;;劇場(chǎng)建筑造型的個(gè)性與內(nèi)涵表達(dá)[J];后勤工程學(xué)院學(xué)報(bào);2013年05期
4 馬e,
本文編號(hào):2424142
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2424142.html
最近更新
教材專著