【摘要】:熱電聯(lián)產(chǎn)作為一種高效利用能源的生產(chǎn)方式,已經(jīng)得到國內(nèi)的外廣泛認可和大力發(fā)展。但目前,供熱機組大多采用“以熱定電”的方式運行,隨著電力峰谷差逐年增長,熱電廠調(diào)峰能力不足的問題日益顯著,如何解除機組熱電負荷的耦合關(guān)系,使熱電機組在保證供熱質(zhì)量的同時,為電網(wǎng)提供更多的調(diào)峰容量,成為亟待解決的問題。從質(zhì)量及能守恒出發(fā),假設(shè)管網(wǎng)已經(jīng)處于水力平衡狀態(tài),建立了供熱系統(tǒng)中主要設(shè)備的能量流動模型,并根據(jù)實際系統(tǒng)運行特點對模型進行適當簡化,著重考慮了影響系統(tǒng)熱動態(tài)特性方面的參數(shù)。以數(shù)學模型為基礎(chǔ),建立了完整的一、二次網(wǎng)供熱系統(tǒng)仿真模型,以間接連接供熱系統(tǒng)為研究對象,對系統(tǒng)的輸送延遲和蓄熱特性進行了仿真分析,并利用該特性,結(jié)合熱電負荷變化特點,提出了可以使熱電機組參與電力調(diào)峰的系統(tǒng)運行調(diào)節(jié)方式,以及有效提高供熱機組電力調(diào)峰能力的方法。對所建立的一次管網(wǎng)進行了動態(tài)仿真,通過改變熱源供熱量,定量分析了一次管網(wǎng)的輸送延遲及蓄熱特性。分析結(jié)果發(fā)現(xiàn),熱水在管道中的流動是導致輸送延遲的主要原因;在熱源供熱量發(fā)生變化時,管壁溫度與熱水溫度相比變化較慢,此時管壁可以作為蓄熱體發(fā)生蓄熱或放熱,減緩水溫及輸送熱量的變化,從而影響用戶最終所得的熱負荷。對用戶室內(nèi)熱環(huán)境進行了動態(tài)仿真,分析了建筑圍護結(jié)構(gòu)和內(nèi)蓄熱體與室內(nèi)空氣的換熱過程,研究發(fā)現(xiàn),兩者都可以減緩室外溫度變化以及供熱負荷變化等因素對室內(nèi)溫度的影響。以一、二次供熱系統(tǒng)的動態(tài)特性分析為依據(jù),在供熱系統(tǒng)質(zhì)調(diào)節(jié)方法的基礎(chǔ)上,提出了可以使熱電機組參與電力調(diào)峰的兩種系統(tǒng)運行調(diào)節(jié)方案,該方案采用分時段改變供熱量的調(diào)節(jié)方法,根據(jù)不同時段負荷特點和供熱機組熱、電負荷耦合關(guān)系,確定不同時段的供熱量。仿真模型模擬運行結(jié)果表明,兩種方案均可以有效提高供熱機組調(diào)峰能力,且對熱用戶室溫影響較小,在分時電價制度下,調(diào)峰運行方式還可以提高熱電廠的發(fā)電收益,驗證了兩種方案的有效性和經(jīng)濟性。
[Abstract]:As an efficient energy production mode, cogeneration has been widely recognized and developed in China. But at present, most heat supply units are operated by "heat fixed power" mode. With the increase of power peak and valley difference year by year, the problem of insufficient peak-shaving capacity of thermal power plant is becoming more and more obvious. It is an urgent problem to ensure the heating quality and provide more peak-shaving capacity for the power grid. Starting from the conservation of mass and energy, the energy flow model of the main equipment in the heating system is established, and the model is appropriately simplified according to the operating characteristics of the actual system, assuming that the pipe network is already in the state of hydraulic balance. The parameters affecting the thermal dynamic characteristics of the system are emphatically considered. Based on the mathematical model, a complete simulation model of primary and secondary network heating system is established. The transmission delay and heat storage characteristics of the system are simulated and analyzed. Based on the characteristics of thermoelectric load variation, this paper puts forward the system operation regulation mode which can make thermoelectric units participate in power peak shaving, and the method to effectively improve the power peak shaving ability of heat supply units. The dynamic simulation of the primary pipe network is carried out. By changing the heat supply from the heat source, the transportation delay and heat storage characteristics of the primary pipe network are quantitatively analyzed. The results show that the flow of hot water in the pipeline is the main reason for the delay of transportation. When the heat supply of the heat source changes, the tube wall temperature changes more slowly than the hot water temperature. In this case, the tube wall can be used as a regenerator to store or release heat, slow down the change of water temperature and heat transfer, and thus affect the final heat load of the user. The dynamic simulation of the indoor thermal environment of the user is carried out, and the heat transfer process of the building enclosure structure and the inner heat storage body and indoor air is analyzed, and the results show that, Both of them can slow down the influence of outdoor temperature change and heating load change on indoor temperature. Based on the analysis of the dynamic characteristics of the primary and secondary heating systems, and on the basis of the quality regulation methods of the heating systems, two kinds of system operation and regulation schemes which can enable the thermal power units to participate in the power peak shaving are put forward. According to the load characteristics of different time periods and the coupling relationship between heat and electricity load of heating units, the heat supply in different periods is determined. The simulation results show that both schemes can effectively improve the peak-shaving capacity of heating units, and have little effect on the room temperature of heat users. Under the time-sharing price system, the peak-shaving operation mode can also increase the power generation income of the thermal power plant. The effectiveness and economy of the two schemes are verified.
【學位授予單位】:山東大學
【學位級別】:碩士
【學位授予年份】:2016
【分類號】:TU995;TM73

【相似文獻】

相關(guān)期刊論文 前10條

1 謝俊;白興忠;甘德強;;水電/火電機組調(diào)峰能力的評估與激勵[J];浙江大學學報(工學版);2009年11期

2 周小娟;;水電廠的發(fā)電和調(diào)峰能力研究[J];黑龍江科技信息;2011年16期

3 王曉玲;;全蘇科技大會討論調(diào)峰問題[J];華北電力技術(shù);1984年11期

4 郭靖濤;快速啟動:提高機組調(diào)峰能力[J];華北電業(yè);1995年08期

5 胡嶸;;淺析2006年天然氣主干網(wǎng)調(diào)峰及其影響因素[J];上海煤氣;2007年06期

6 朱紀憲;靳鳳蘭;;不同天然氣調(diào)峰方式經(jīng)濟比選研究[J];石油規(guī)劃設(shè)計;2011年01期

7 尹蘇;;200MW機組擴大調(diào)峰能力可行性試驗簡介[J];黑龍江電力技術(shù);1992年06期

8 萬俊,潘錉,楊小冬,周傳和,糜建芳,黎桂珍;鳳灘擴機調(diào)峰效益評估[J];科技進步與對策;2001年04期

9 熊家英,熊飛;水電站擴建增容是加速改善電源結(jié)構(gòu)增強調(diào)峰能力的有效舉措[J];貴州水力發(fā)電;2001年01期

10 王財友,曹衛(wèi)杰;上海東海天然氣引射調(diào)峰試驗[J];上海節(jié)能;2003年06期

相關(guān)會議論文 前5條

1 謝俊;白興忠;甘德強;;機組調(diào)峰能力的評估與激勵[A];中國高等學校電力系統(tǒng)及其自動化專業(yè)第二十四屆學術(shù)年會論文集(中冊)[C];2008年

2 金毓軍;張振宇;張明理;黃旭;劉波;;基于經(jīng)濟調(diào)峰平衡的區(qū)域電網(wǎng)風電接納能力研究[A];2009年風電場接入電網(wǎng)技術(shù)專題研討會論文集[C];2009年

3 張少華;言茂松;;抽水蓄能電站調(diào)峰效益的經(jīng)濟評價[A];1995中國控制與決策學術(shù)年會論文集[C];1995年

4 王懷忠;;西氣東輸與燃氣輪機調(diào)峰發(fā)電[A];江蘇省天然氣利用學術(shù)研討會論文集(上)[C];2002年

5 白雪飛;王麗宏;蔡舒;;內(nèi)蒙古西部地區(qū)電網(wǎng)風電接納能力的研究[A];2009年風電場接入電網(wǎng)技術(shù)專題研討會論文集[C];2009年

相關(guān)重要報紙文章 前10條

1 本報記者 趙博;從源頭解決調(diào)峰能力不足[N];中國電力報;2013年

2 本報記者 張楠;誰應為天然氣調(diào)峰建設(shè)埋單[N];中國證券報;2009年

3 記者 陳其玨;“氣荒”再現(xiàn)調(diào)峰能力不足 專家稱天然氣價改窗口臨近[N];上海證券報;2012年

4 國網(wǎng)能源研究院副總經(jīng)濟師 能源戰(zhàn)略與規(guī)劃所所長 白建華;充分發(fā)揮水能的調(diào)峰作用[N];經(jīng)濟日報;2010年

5 本報記者 黃杰;調(diào)峰能力銳減誘發(fā)假性電荒 限電潮悄然涌現(xiàn)[N];中國經(jīng)營報;2010年

6 本報記者 張一鳴;破題調(diào)峰困境需理順價格[N];中國經(jīng)濟時報;2012年

7 桑學勇 白雪松 李潮;國網(wǎng)黑龍江電力安排供熱期電網(wǎng)運行方式[N];國家電網(wǎng)報;2013年

8 本報記者 段貴恒;核電是促進中部崛起的重要條件[N];中國電力報;2013年

9 記者 邢軍 通訊員 羅銘;東北公司全力調(diào)峰保障運行安全[N];國家電網(wǎng)報;2008年

10 記者 彭小萍;讓城市不因氣“受氣”[N];湖北日報;2013年

相關(guān)碩士學位論文 前10條

1 朱昊凌;大型CFB機組調(diào)峰性能優(yōu)化技術(shù)研究[D];昆明理工大學;2015年

2 李玲;熱電廠蓄熱消納風電的經(jīng)濟性與調(diào)峰定價研究[D];大連理工大學;2015年

3 潘歡;大規(guī)模風電接入后電力系統(tǒng)的魯棒調(diào)峰研究[D];長沙理工大學;2014年

4 劉上嘉;調(diào)峰約束條件下的陽江電網(wǎng)風電接納能力研究[D];華南理工大學;2015年

5 楊超;高壓燃氣管網(wǎng)儲氣能力計算及調(diào)峰研究[D];重慶大學;2015年

6 王赫;供熱系統(tǒng)動態(tài)特性的模擬研究及在電力調(diào)峰中的應用[D];山東大學;2016年

7 封圓;廣域源荷互動調(diào)峰模式研究[D];華北電力大學;2013年

8 曹年林;與大規(guī)模新能源發(fā)電相適應的用戶側(cè)聯(lián)合調(diào)峰技術(shù)研究[D];北京交通大學;2015年

9 張嘉東;天然氣調(diào)峰方式工藝研究與工程化設(shè)計[D];華南理工大學;2013年

10 李海軍;天然氣吸附儲運技術(shù)在城市調(diào)峰中的應用研究[D];華南理工大學;2013年



本文編號:2422439

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2422439.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶f1c53***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com