超大PC構(gòu)件起吊結(jié)構(gòu)分析
[Abstract]:Because of the large weight and size of prefabricated super-large shear wall, when the initial strength of concrete is not very high, the wall board is easy to be cracked or dangerous. Therefore, it is very important to ensure the integrity of the wall board and the safety of the hoisting. It is necessary to analyze the internal force of the lifting and use the mechanical calculation method to determine the location of the lifting point reasonably, so as to reduce the damage caused by the initial lifting to the wall board.
【作者單位】: 中國十七冶集團(tuán)有限公司;
【分類號(hào)】:TU37;TU756
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 姜鼎俊;;板、梁構(gòu)件合理吊點(diǎn)位置的選擇[J];建筑技術(shù);1986年03期
2 江正榮;;變截面柱兩點(diǎn)綁扎起吊吊點(diǎn)位置的計(jì)算[J];建筑工人;1996年03期
3 宋開爽;任廣平;趙青;侯旭魁;;變截面柱吊點(diǎn)位置選擇[J];工業(yè)建筑;2006年S1期
4 周澤來;工業(yè)廠房施工中吊裝柱子吊點(diǎn)位置確定與計(jì)算[J];甘肅科學(xué)學(xué)報(bào);2004年04期
5 江正榮;;變截面柱一點(diǎn)綁扎起吊吊點(diǎn)位置的計(jì)算[J];建筑工人;1996年04期
6 江正榮;;等截面預(yù)制構(gòu)件一點(diǎn)綁扎吊點(diǎn)位置的計(jì)算[J];建筑工人;1995年12期
7 傅鐘鵬;;確定預(yù)制柱吊點(diǎn)位置的計(jì)算[J];建筑技術(shù);1981年03期
8 艾宇光;;塔式起重機(jī)水平臂架吊點(diǎn)位置探討[J];建筑機(jī)械化;1984年05期
9 吳玉厚;宋國倉;張珂;吳杰;孫佳;;U型高處作業(yè)平臺(tái)提升吊點(diǎn)位置分布[J];沈陽建筑大學(xué)學(xué)報(bào)(自然科學(xué)版);2010年03期
10 畢永道;;按等彎矩法確定塔吊水平臂架單吊點(diǎn)位置的通用方程[J];建筑機(jī)械化;1987年01期
相關(guān)會(huì)議論文 前1條
1 齊朝暉;徐新生;曲牧;;吊掛結(jié)構(gòu)懸索吊點(diǎn)位置的優(yōu)化[A];第十屆全國結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅲ卷[C];2001年
,本文編號(hào):2378993
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2378993.html