檸條塔煤礦換熱站監(jiān)控系統(tǒng)的設(shè)計(jì)與研究
[Abstract]:Heat exchange station is an important part of heating system, it is the hub connecting heat source and heat load, and it undertakes the important task of efficient operation of the whole system. The monitoring technology of heat exchange station is studied to realize the intelligent control of heat exchange station, which has certain economic and social benefits. Based on the reconstruction project of heat exchange station in Caragana Tower Coal Mine, based on the theoretical study of the system connection mode, hydraulic and thermal conditions, and operation control regulation, this paper aims at the cold winter of Caragana Coal Mine. Based on the climatic characteristics of diurnal temperature difference, the operation and regulation mode of the heat exchange station system in this coal mine is put forward. On the one hand, according to the change of outdoor temperature, the heat exchange station system actively adjusts the quality of the secondary pipe network side, and the first grade pipe network side adjusts the opening degree of the electric valve by controlling the opening degree of the electric valve. On the other hand, the secondary pipe network of the heat exchange station adjusts the flow through the frequency conversion speed regulation of the circulating pump, in order to adapt to the load change of the secondary pipe network. According to the function requirement of the monitoring system, the control scheme of the heat exchange station and the centralized management of the monitoring center is adopted to control the water supply temperature of the secondary pipe network and the constant temperature difference control of the frequency conversion of the circulatory system. And the frequency conversion constant pressure difference control of water supply system. The structure of the control system takes Siemens S7-300PLC as the lower computer to collect the temperature and pressure signals of the heat exchange station and to control the pump and valve devices. The independent control of each heat exchange station of the system is realized by using the HMI of the local monitoring system based on MT6070iH and the monitoring software of the host computer by using the force control ForceControl configuration software, which realizes the management and monitoring of the whole system. The results of the whole system show that: stable operation, high adjusting precision, easy to control, high reliability, saving energy, reducing the working intensity of the staff, it has good application value.
【學(xué)位授予單位】:西安科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TU995;TP277
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 朱廣偉;;關(guān)于區(qū)域換熱站與樓宇換熱站的比較[J];黑龍江科技信息;2011年13期
2 李利文;;換熱站常見故障原因及消除方法[J];企業(yè)技術(shù)開發(fā);2011年07期
3 馬銀紅;曲舵;;淺談?chuàng)Q熱站設(shè)計(jì)[J];科技信息;2011年23期
4 宋熹;;區(qū)域換熱站與樓宇換熱站的技術(shù)經(jīng)濟(jì)比較[J];科技創(chuàng)新導(dǎo)報(bào);2011年26期
5 田紀(jì)體;;無人值守地下?lián)Q熱站的安全及防護(hù)[J];區(qū)域供熱;2012年02期
6 許傳軍;;換熱站自控與調(diào)節(jié)研究[J];科技創(chuàng)業(yè)家;2013年04期
7 吳大軍;;換熱站系統(tǒng)應(yīng)用問題對(duì)策研究[J];科技致富向?qū)?2012年11期
8 路廣 ,路金嶺;換熱站常見故障原因及消除方法[J];暖通空調(diào);2003年01期
9 高亞旭,路金嶺,李玲;應(yīng)用信息技術(shù)發(fā)展無人職守?fù)Q熱站[J];區(qū)域供熱;2004年06期
10 宋若生;陳維軍;馬吉濤;;關(guān)于換熱站相關(guān)問題的初探[J];建筑節(jié)能;2007年11期
相關(guān)會(huì)議論文 前9條
1 孫玉慶;孫毅;;關(guān)于換熱站規(guī)模的經(jīng)濟(jì)分析[A];新世紀(jì) 新機(jī)遇 新挑戰(zhàn)——知識(shí)創(chuàng)新和高新技術(shù)產(chǎn)業(yè)發(fā)展(下冊(cè))[C];2001年
2 吳鶯;王順利;;換熱站的設(shè)計(jì)[A];土木建筑學(xué)術(shù)文庫(第13卷)[C];2010年
3 牟林朋;王俊;;換熱站無線遠(yuǎn)程監(jiān)控系統(tǒng)[A];推進(jìn)供熱體制改革與節(jié)能改造新技術(shù)新設(shè)備應(yīng)用交流會(huì)論文集[C];2010年
4 董玉平;閻宇宏;武秉禮;張芫;;某工業(yè)廠區(qū)換熱站系統(tǒng)設(shè)計(jì)[A];全國暖通空調(diào)制冷2010年學(xué)術(shù)年會(huì)資料集[C];2010年
5 馮永華;;供熱系統(tǒng)換熱站主要設(shè)備選型應(yīng)注意的問題[A];2007年山東省制冷空調(diào)學(xué)術(shù)年會(huì)論文集[C];2007年
6 白海波;侯永亮;;利用高爐廢熱采暖存在問題的分析及處理[A];河北省冶金學(xué)會(huì)冶金設(shè)備學(xué)術(shù)年會(huì)會(huì)議論文集[C];2013年
7 付玉龍;;智能化板式換熱機(jī)組在集中供熱中的應(yīng)用[A];土木工程建造管理(6)[C];2011年
8 遲軍為;王俊;;無線射頻測(cè)溫系統(tǒng)在供暖溫度監(jiān)測(cè)中的應(yīng)用[A];推進(jìn)供熱體制改革與節(jié)能改造新技術(shù)新設(shè)備應(yīng)用交流會(huì)論文集[C];2010年
9 白海波;侯永亮;;利用高爐廢熱采暖存在問題的分析及處理[A];第七屆全國能源與熱工學(xué)術(shù)年會(huì)論文集[C];2013年
相關(guān)重要報(bào)紙文章 前10條
1 本報(bào)記者 王俊美 通訊員 李杰;建設(shè)新熱源 整合換熱站[N];淄博日?qǐng)?bào);2009年
2 楊湘營 劉俊偉;給換熱站戴上“緊箍” 規(guī)范山東青州供熱發(fā)展[N];中國建設(shè)報(bào);2010年
3 任永科;督導(dǎo)完成換熱站工程[N];中國航天報(bào);2011年
4 華南;市府領(lǐng)導(dǎo)分別與相關(guān)部門座談排查災(zāi)情進(jìn)一步部署抗災(zāi)工作[N];營口日?qǐng)?bào);2007年
5 地區(qū)糾風(fēng)辦供稿;年內(nèi)新建三座換熱站[N];塔城報(bào);2009年
6 沈河區(qū)太清宮街城中小區(qū) 王文良;換熱站是供暖好壞的關(guān)鍵點(diǎn)[N];沈陽日?qǐng)?bào);2009年
7 劉子昂 吳晶瑩;一場(chǎng)攻堅(jiān)戰(zhàn)的考驗(yàn)[N];經(jīng)理日?qǐng)?bào);2008年
8 李明旭 記者肖萌;丹麥新技術(shù)助熱電總公司節(jié)電48.25%[N];錦州日?qǐng)?bào);2009年
9 記者 曹雷 通訊員 王鑄;商河城區(qū)供熱新增5個(gè)換熱站[N];濟(jì)南日?qǐng)?bào);2011年
10 記者 王濤;切實(shí)加強(qiáng)領(lǐng)導(dǎo) 嚴(yán)格工作流程 確保如期供熱[N];呂梁日?qǐng)?bào);2013年
相關(guān)博士學(xué)位論文 前1條
1 楊先亮;集中供熱系統(tǒng)運(yùn)行方式及管網(wǎng)泄漏檢測(cè)研究[D];華北電力大學(xué);2015年
相關(guān)碩士學(xué)位論文 前10條
1 薛海松;基于故障樹的無人值守?fù)Q熱站監(jiān)控技術(shù)研究[D];燕山大學(xué);2015年
2 朱昭璐;基于氣候補(bǔ)償器的園區(qū)換熱站供熱控制系統(tǒng)研究[D];西安建筑科技大學(xué);2015年
3 鄺濤;上灣換熱站節(jié)能控制系統(tǒng)設(shè)計(jì)與研究[D];西安建筑科技大學(xué);2015年
4 丁紅亮;某片區(qū)換熱站優(yōu)化實(shí)踐及供熱系統(tǒng)智能化控制策略研究[D];山東建筑大學(xué);2015年
5 孫勇;工業(yè)遠(yuǎn)程控制下的熱網(wǎng)自動(dòng)控制系統(tǒng)[D];大連海事大學(xué);2015年
6 杜鑫;遠(yuǎn)程無人值守?fù)Q熱站控制系統(tǒng)的設(shè)計(jì)[D];大連交通大學(xué);2015年
7 高曉宇;基于數(shù)據(jù)挖掘的換熱站運(yùn)行規(guī)律研究[D];河北工業(yè)大學(xué);2015年
8 董如彬;基于s7-1200PLC的水水換熱站分布式系統(tǒng)設(shè)計(jì)[D];山東大學(xué);2015年
9 高闖;“一補(bǔ)二”箱體式換熱站[D];太原理工大學(xué);2012年
10 袁孝勇;換熱站監(jiān)控系統(tǒng)設(shè)計(jì)及研究[D];青島科技大學(xué);2015年
,本文編號(hào):2328720
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2328720.html